Environmental Impact Assessment Report: Nkomati Anthracite (Pty) Limited, Madadeni Opencast<br />

<strong>Mining</strong> Project Page 37<br />

4 . 2 . 2 . 2 M i n e r a l P ro c e s s i n g M e t h o d<br />

Processing of the minerals will not be undertaken at the proposed mining area. The only alternative<br />

to this is to build a new processing plant, which is not feasible since Nkomati Anthracite Mine has a<br />

washing plant that can handle the extra tonnage that will be produced at the proposed mining area.<br />

The above renders the construction of the processing plant unnecessary.<br />

4 . 2 . 2 . 3 T r a n s p o rt , P ow e r a n d W at e r S u p p l y<br />

No employees will be housed at the proposed mining area; employees will be housed in the nearby<br />

towns and villages. No alternatives were considered. Ablution facilities will be installed at the<br />

proposed mining area, and within the pit area. Employees will be transported from respective<br />

residences to the mining premises. Transport for the coal product will be via trucks to the ROM<br />

stockpiles and to the Nkomati Anthracite Mine washing plant via existing haul roads. No other<br />

alternatives were considered.<br />

Transport for the coal product will be via trucks to the ROM stockpiles and to the Nkomati Anthracite<br />

Mine washing plant via existing haul roads. No other alternatives were considered. Except for the<br />

dust suppression water, no process water supply will be required since no processing plant will be<br />

constructed. Potable water will be obtained from a borehole to be sited and drilled on site.<br />

4 . 2 . 2 . 4 M i n e R e s i d u e D i s p o s a l S i t e<br />

No coal discard disposal facility will be necessary at the proposed mining area. All coal from the<br />

mining area will be transported to the existing Nkomati Anthracite Mine washing plant. The additional<br />

coal discard from the coal to be mined at the proposed mining area will be disposed of at the planned<br />

coal discard disposal facility. The above-mention disposal facility was designed to have enough<br />

capacity to handle the additional coal discard.<br />

Waste (domestic and industrial) will be transported to the existing salvage area for sorting, recycling<br />

and disposal.<br />