Environmental Impact Assessment Report: Nkomati Anthracite (Pty) Limited, Madadeni Opencast<br />
<strong>Mining</strong> Project Page 48<br />
EIA/EMP itself addresses the issues raised by DMR. See attachment 3 of Appendix 4 for the reply to<br />
DWEA on their comments.<br />
A copy of the draft EIA/EMP for the Madadeni Opencast has been submitted to the Nkomazi Local<br />
Municipality for their comments. A copy of acknowledgement of receipt for the draft EIA/EMP is<br />
attached as attachment 4 of Appendix 4. A letter was received from the local municipality stating their<br />
support for the Madadeni opencast project and is attached as attachment 5 of Appendix 4.<br />
5.3.3 An n o u n ci n g t h e O p p o rt u n i t y t o C o n t r ib u t e<br />
The opportunity for stakeholders to participate in the environmental assessment process was<br />
announced as follows:<br />
5.3.4 F i n a l EI A/ E M P R e p o r t<br />
The draft EIA/EMP was revised to address comments received from DMR and since issues raised by<br />
DWEA were mainly water use licence application related, their issues are addressed through the<br />
water use licence application process.<br />
Based on the above, a final EIA/EMP was updated to address additional issues raised by DMR and is<br />
submitted to the lead authority for decision-making.<br />
<strong>NKOMATI</strong> <strong>ANTHRACITE</strong> (<strong>PTY</strong>) <strong>LIMITED</strong> COMPILED BY GEOVICON ENVIRONMENTAL (<strong>PTY</strong>) LTD