ENGLISH<br />

3. TRANSPORT<br />

Avoid subjecting the products to needless jolts or collisions.<br />

4. DIMENSIONS AND WEIGHTS<br />

The adhesive label on the package indicates the total weight of the panel. The dimensions are given on page 95.<br />

5. WARNINGS<br />

5.1<br />

Read this documentation carefully before installation.<br />

It is indispensable to have the electric system and connections made by skilled personnel, in possession<br />

of the technical qualifications indicated by the safety standards concerning the design, installation and<br />

maintenance of technical plants, in force in the country where the product is to be installed.<br />

Failure to comply with the safety regulations not only causes risk to personal safety and damage to the<br />

equipment, but invalidates every right to assistance under guarantee.<br />

5.2<br />

The term skilled personnel means persons whose training, experience and instruction, as well as their<br />

knowledge of the respective standards and requirements for accident prevention and working<br />

conditions, have been approved by the person in charge of plant safety, authorising them to perform all<br />

the necessary activities, during which they are able to recognise and avoid all dangers. (Definition for<br />

technical personnel IEC 364)<br />

5.3<br />

Check that no damage has been done during transport or storage. In particular, ensure that the external<br />

casing is perfectly entire and in excellent condition; all the internal parts of the panel (components,<br />

leads, etc.) must be completely free from traces of damp, oxide or dirt. Clean carefully and check the<br />

efficiency of all the components in the panel; if necessary, replace any parts that are not perfectly<br />

efficient It is indispensable to ensure that all the leads in the panel are correctly secured to their<br />

terminals. In the event of long storage (or in the event of replacement of any part) it is advisable to<br />

carry out on the panel all the tests indicated by standards EN 60204-1.<br />

6. RESPONSIBILITY<br />

The Manufacturer does not ensure good operation of the panel if it is tampered with or modified or made to operate at<br />

values beyond the data on the plate.<br />

The Manufacturer also declines all responsibility for possible errors in this booklet, if due to misprints or errors in<br />

copying. The company reserves the right to make any modifications to products that it may consider necessary or<br />

useful, without affecting the essential characteristics.<br />

7. INSTALLATION<br />

Scrupulously respect the electric supply values indicated on the electric data plate.<br />

The electric panels must be installed on dry surfaces, free from vibrations. Although they have a degree of protection of<br />

IP55, it is not advisable to use them in an atmosphere with a large content of oxidising or corrosive gases.<br />

If installed in the open, the panels must be protected as much as possible against direct sunlight. Suitable steps must be<br />

taken to keep the internal temperature of the panel within the “environment temperature field of use” given below. High<br />

temperatures lead to rapid ageing of all the components, causing more or less severe malfunctions.<br />

It is also advisable for the person who installs the panels to ensure that the cable clamps are watertight.<br />

Use the cable clamp gripping rings provided to block the power cables (of the panel, the electropump, the floats), so as<br />

to prevent the cable clamps from working loose. As standard supply, the panels are provided with four brackets for<br />

fixing them on the wall. It is recommended to fix them to the wall using only the slots provided in the brackets, without<br />

making unnecessary holes in the box, so as not to affect the degree of protection of the panel and its functionality.<br />

8. <strong>ED</strong> 1,3 M – <strong>ED</strong> 3 M – <strong>ED</strong> 3 M <strong>HS</strong><br />

8.1 Technical data<br />

�� rated input voltage: 220 - 240 V +/- 10%<br />

�� phases: 1<br />

�� frequency: 50-60 Hz<br />

�� number of pumps that can be connected: 1<br />

<strong>ED</strong> 1,3 M <strong>ED</strong> 3 M <strong>ED</strong> 3 M <strong>HS</strong><br />

�� max. rated output power: 1,85 KW 220-240 V 2,95 KW 220-240 V 2,95 KW 220-240 V<br />

�� max. rated using current: 10 Amps 16 Amps 16 Amps<br />

�� starting capacitor: -- 40 μF 40 μF<br />

�� capacitor for strong static torque: -- -- 200-250 μF<br />

�� field of use environment temperature: -10°C +40°C<br />

�� storage environment temp. limit: -25°C +55°C<br />

�� relative humidity (without condensation): 50% at 40°C MAX (90% at 20°C )<br />

�� max. altitude: 3000 m (a.s.l.)<br />

�� degree of protection: IP55<br />

�� panel construction: in accordance with EN 60204-1 and EN 60439-1<br />