<strong>Plan</strong>ned Future Road Projects<br />

STANLY COUNTY<br />

Interviews were conducted with the <strong>Stanly</strong> <strong>County</strong> <strong>Plan</strong>ning staff as well as NCDOT in order to<br />

determine future road projects for the county. The NCDOT Construction <strong>–</strong> Active Project List<br />

and Future Project Letting List were used as well to help determine future dates and road<br />

segments. All project dates are subject to change and should only be used as a guide.<br />

Figure 4-2 illustrates programmed NCDOT projects in <strong>Stanly</strong> <strong>County</strong>. Each project identified on<br />

Figure 4-2 is detailed below:<br />

NC 24/27 is in the process of being widened to four lanes and in some locations within<br />

Albemarle to five lanes. Currently on NC 24/27 from East of St. Martin Road to Bird Road in<br />

Albemarle is being widened. In 2005 the last part west of Albemarle should be let<br />

(construction started) for widening. This means that around 2007 NC 24/27 should be four<br />

lanes all the way from Albemarle to Charlotte as well as to Interstate 485.<br />

Interstate 485, the outer loop around the City of Charlotte, eastern section is scheduled to<br />

be complete in 2003. The interstate will be about 13 miles from <strong>Stanly</strong> <strong>County</strong>’s border and<br />

around 35 miles from Albemarle. Residential development has already started to increase in<br />

the western census tract 9908 that includes Locust and Stanfield. This is predicted to<br />

continue as the completion date gets closer and once the road is finished allowing easy<br />

access to the City of Charlotte.<br />

The eastern part of NC 24/27, east of Albemarle to the <strong>County</strong> line will also be widened to<br />

four lanes with a schedule to be let in 2007 with completion date unsure, possibly in 2009.<br />

Ridge Street will be extended to Airport Road in order to provide for greater access to the<br />

Airport. The scheduled to start is 2006 and completion could possibly be two years later.<br />

In 2004 the U.S. 52 Extension from the existing U.S. 52 to NC 24/27 will be let. And<br />

widening of U.S. 52 from U.S. 74 in Wadesboro to U.S. 52 southeast of Albemarle to four<br />

lanes is on the schedule to be let in 2007.<br />

Widening of NC 49 to four lanes from east of SR 2444 to the Yadkin River is to be let in<br />

2009.<br />

U.S. 52 widening from Richfield to Salisbury is on the TIP. The first section within <strong>Stanly</strong><br />

<strong>County</strong> is tentatively planned to start in late 2010, but is currently not funded. As part of this<br />

section a bypass around Pfeiffer University and Richfield is also planned.<br />

In addition to these projects, <strong>Stanly</strong> <strong>County</strong> has requested that NC 73 should be widened to four<br />

lanes west of Albermarle. This identified need—shown in Figure 4-2—has not been included as<br />

yet in the NCDOT project list.<br />

Access Management <strong>Plan</strong>s<br />

Access management is a tool by which transportation planners and designers protect<br />

transportation safety and efficiency while at the same time providing necessary and appropriate<br />

access to adjacent land. Access management is largely based on the function of a roadway.<br />

As discussed in the Functional Classification System section of this report, the higher the road<br />

classification, the more emphasis is placed on roadway mobility over roadway accessibility.<br />

Presently Cabarrus and Lincoln Counties are completing access management plans for NC 73<br />

from Concord to Lincolnton. The plans—as currently presented—require the minimum setback<br />

of driveways from intersections and limit access. <strong>Stanly</strong> <strong>County</strong> needs to examine the use of<br />

access management plans on the proposed Albemarle <strong>North</strong>east Connector, the NC 24/27<br />

widening, and all other future four-lane widening projects in the future. Specific elements to be<br />

<strong>Land</strong> <strong>Use</strong> <strong>Plan</strong> 4-5 6/02