3.7.3 Ducting of fan<br />

3.7.4 Check of clearances<br />

BWA-<strong>KXE</strong>-Fetteinzelstehlager_englisch_02.doc<br />

Transport, Installation<br />

Distortions of the fan at the connections caused by<br />

the ductwork are not permitted. Distortions cause<br />

alterations, e.g. the gap at the nozzle decreases at<br />

one side which might lead to rubbing in the inlet.<br />

- Remove the transport covers from the connections.<br />

- Move the duct work to be connected to the inlet and discharge<br />

openings of the fan without causing offsets between<br />

the ducts and openings.<br />

- Connect duct and conduits to the fan free-of-load.<br />

The radial clearance within the inlet must be checked. The<br />

minimum clearance must amount to 3 mm at least.<br />

5*<br />

4<br />

Figure 5<br />

1<br />

3<br />

2<br />

inlet cone<br />

impeller nozzle<br />

* according to the number of blades, min. 4 x (each 90°)<br />

Figure 5 �. Representation of the check<br />

points � to �<br />

At the beginning of the gap check, take the gap width at<br />

eight different points. Then turn the impeller by 90° and<br />

again check the gap at eight different points. Repeat this<br />

process three times.<br />

3.15