Bedienungsanleitung KXE - REITZ Ventilatoren
Bedienungsanleitung KXE - REITZ Ventilatoren
Bedienungsanleitung KXE - REITZ Ventilatoren
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
7.9 Maintenance schedule<br />
BWA-<strong>KXE</strong>-Fetteinzelstehlager_englisch_02.doc<br />
Maintenance<br />
Structural component Daily Weekly Quarterly Yearly<br />
impeller An inspection of the impeller must be carried out immediately, if<br />
� the permissible limiting values (see chapter 9.1.2 Limiting values vibrations) are<br />
exceeded,<br />
� changed impeller noises occur.<br />
Examine the impeller every 5,000 operating hours and check it for alteration (cracks,<br />
geometric alterations, balancing condition, wear and sticking material), but at least<br />
once a year.<br />
Check the impeller e.g. by non-destructive crack testing.<br />
Fans that are subject to high dynamical stresses are to be checked in accordance with the<br />
additional agreement (maintenance schedule) within the prescribed intervals.<br />
bearings<br />
An inspection of the bearings must be carried out immediately, if<br />
� the permissible limiting values (see chapter 9.1.2 Limiting values vibrations and<br />
9.1.3 Limiting values bearing temperatures) are exceeded,<br />
� changed running noises occur<br />
� unusual alterations of the lubricant occur.<br />
Re-lubrification intervals acc. to plate “Maintenance of the bearings” (see chapt.<br />
7.3.1.2 Lubrication intervals)<br />
shaft seal The shaft sealing rings have to be checked and exchanged if the sealing gas<br />
consumption or leakage increases. Exchange the shaft seal ring when the rings are<br />
worn or damaged. If the seal ring consists of more than one part, replace the full seal<br />
ring set.<br />
shaft earthing Check the correct functioning of the shaft earthing regularly and in dependence of<br />
the operating conditions and replace it, if required.<br />
condensate drain Drain the accumulated condense water in regular intervals or when required in a<br />
suitable drain receptacle and dispose of it in an environmentally compatible way.<br />
coupling If noise levels are changed abruptly and / or vibrations occur abruptly, the coupling<br />
must be checked and if required, it must be re-aligned or exchanged.<br />
motor pay attention to<br />
retighten screws, check motor, if<br />
running noises and<br />
check bearings required, exchange<br />
quiet running,<br />
bearings, observe<br />
remove sticking<br />
maintenance<br />
material (e.g. dust),<br />
instructions of<br />
if required<br />
motor manufacturer<br />
earthing motor<br />
clean inside, clean inside,<br />
terminal box<br />
tighten screws tighten screws<br />
connections for collect measuring check for functiona- check for functiona- check for functiona-<br />
monitoring devices and<br />
auxiliary equipment<br />
values<br />
litylitylity<br />
flexible connections check at regular intervals and – if check, if required, check, if required,<br />
required – after change of the processes. retighten screws retighten screws<br />
and if worn-out, and, if worn out,<br />
exchange flexible exchange flexible<br />
connections connections<br />
total fan pay attention to pay attention to check impeller, fan<br />
operational noises operational noises bearings and motor<br />
and quiet running and quiet running bearings, shaft<br />
seal, coupling and<br />
flexible connections<br />
for wear and, if<br />
required, repair or<br />
exchange them<br />
7.9