28.02.2013 Views

Bedienungsanleitung KXE - REITZ Ventilatoren

Bedienungsanleitung KXE - REITZ Ventilatoren

Bedienungsanleitung KXE - REITZ Ventilatoren

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

7.9 Maintenance schedule<br />

BWA-<strong>KXE</strong>-Fetteinzelstehlager_englisch_02.doc<br />

Maintenance<br />

Structural component Daily Weekly Quarterly Yearly<br />

impeller An inspection of the impeller must be carried out immediately, if<br />

� the permissible limiting values (see chapter 9.1.2 Limiting values vibrations) are<br />

exceeded,<br />

� changed impeller noises occur.<br />

Examine the impeller every 5,000 operating hours and check it for alteration (cracks,<br />

geometric alterations, balancing condition, wear and sticking material), but at least<br />

once a year.<br />

Check the impeller e.g. by non-destructive crack testing.<br />

Fans that are subject to high dynamical stresses are to be checked in accordance with the<br />

additional agreement (maintenance schedule) within the prescribed intervals.<br />

bearings<br />

An inspection of the bearings must be carried out immediately, if<br />

� the permissible limiting values (see chapter 9.1.2 Limiting values vibrations and<br />

9.1.3 Limiting values bearing temperatures) are exceeded,<br />

� changed running noises occur<br />

� unusual alterations of the lubricant occur.<br />

Re-lubrification intervals acc. to plate “Maintenance of the bearings” (see chapt.<br />

7.3.1.2 Lubrication intervals)<br />

shaft seal The shaft sealing rings have to be checked and exchanged if the sealing gas<br />

consumption or leakage increases. Exchange the shaft seal ring when the rings are<br />

worn or damaged. If the seal ring consists of more than one part, replace the full seal<br />

ring set.<br />

shaft earthing Check the correct functioning of the shaft earthing regularly and in dependence of<br />

the operating conditions and replace it, if required.<br />

condensate drain Drain the accumulated condense water in regular intervals or when required in a<br />

suitable drain receptacle and dispose of it in an environmentally compatible way.<br />

coupling If noise levels are changed abruptly and / or vibrations occur abruptly, the coupling<br />

must be checked and if required, it must be re-aligned or exchanged.<br />

motor pay attention to<br />

retighten screws, check motor, if<br />

running noises and<br />

check bearings required, exchange<br />

quiet running,<br />

bearings, observe<br />

remove sticking<br />

maintenance<br />

material (e.g. dust),<br />

instructions of<br />

if required<br />

motor manufacturer<br />

earthing motor<br />

clean inside, clean inside,<br />

terminal box<br />

tighten screws tighten screws<br />

connections for collect measuring check for functiona- check for functiona- check for functiona-<br />

monitoring devices and<br />

auxiliary equipment<br />

values<br />

litylitylity<br />

flexible connections check at regular intervals and – if check, if required, check, if required,<br />

required – after change of the processes. retighten screws retighten screws<br />

and if worn-out, and, if worn out,<br />

exchange flexible exchange flexible<br />

connections connections<br />

total fan pay attention to pay attention to check impeller, fan<br />

operational noises operational noises bearings and motor<br />

and quiet running and quiet running bearings, shaft<br />

seal, coupling and<br />

flexible connections<br />

for wear and, if<br />

required, repair or<br />

exchange them<br />

7.9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!