<strong>UK</strong> CONSTRUCTION INFORMATION<br />

Concerns / Considerations<br />

<br />

process (compared to CM / MC).<br />

<br />

– can influence and limit the extent of<br />

‘competitiveness’ of bids.<br />

<br />

<br />

Employers Requirements need to be precise,<br />

clear and detailed.<br />

<br />

closely monitored.<br />

<br />

on interest.<br />

<br />

than traditional contacts with bills of quantities.<br />

<br />

Advantages<br />

<br />

<br />

Contractor.<br />

<br />

run in parallel (subject to level of<br />

design used for tendering).<br />

<br />

<br />

D&B Contractor (subject to post<br />

contract Client driven change).<br />

<br />

maximum price (GMP).<br />

<br />

<br />

novated for continuity / security<br />

of design.<br />

Design & Build<br />

92<br />

Client<br />

Client Rep<br />

Design Team<br />

(pre<br />

novation)<br />

D&B<br />

Contractor<br />

Trade<br />

Contractors<br />

Design Team<br />

(post<br />

novation)<br />

Key Features<br />

<br />

based on outline design but can be at scheme<br />

design stage.<br />

Brief Design<br />

<br />

Tendering<br />

Construct<br />

<br />

(and completes) the design.<br />

<br />

(usually through two stage)