16.03.2013 Views

RLB_UK_Riders_Digest_2013

RLB_UK_Riders_Digest_2013

RLB_UK_Riders_Digest_2013

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>UK</strong> CONSTRUCTION INFORMATION<br />

RIBA Outline Plan of Work<br />

RIBA Work stages are the stages into which<br />

the process of designing building projects and<br />

administering building contracts are usually divided.<br />

The RIBA Outline Plan of Work summarises the<br />

deliverables required under each RIBA work<br />

stage, setting out a logical structure for building<br />

projects starting with the brief and ending with post<br />

occupancy evaluation. The Procedures identify the<br />

responsibilities of the design team at each stage of<br />

design and contract administration.<br />

56<br />

RIBA Work Stages Description of key tasks<br />

Design Preparation<br />

A Appraisal<br />

B Design Brief<br />

C Concept<br />

D Design<br />

Development<br />

E Technical<br />

Design<br />

Identification of client’s needs and<br />

objectives, business case and possible<br />

constraints on development.<br />

Preparation of feasibility studies and<br />

assessment of options to enable the client<br />

to decide whether to proceed.<br />

Development of initial statement of<br />

requirements into the Design Brief by<br />

or on behalf of the client confirming key<br />

requirements and constraints. Identification<br />

of procurement method, procedures,<br />

organisational structure and range of<br />

consultants and others to be engaged for<br />

the project.<br />

Implementation of Design Brief and<br />

preparation of additional data.<br />

Preparation of Concept Design including<br />

outline proposals for structural and building<br />

services systems, outline specifications and<br />

preliminary cost plan.<br />

Review of procurement route.<br />

Development of concept design to include<br />

structural and building services systems,<br />

updated outline specifications and cost plan.<br />

Completion of Project Brief.<br />

Application for detailed planning permission.<br />

Preparation of technical design(s) and<br />

specifications, sufficient to co-ordinate<br />

components and elements of the project<br />

and information for statutory standards and<br />

construction safety.<br />

continued on page 57

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!