16.03.2013 Views

RLB_UK_Riders_Digest_2013

RLB_UK_Riders_Digest_2013

RLB_UK_Riders_Digest_2013

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>UK</strong> CONSTRUCTION COST DATA<br />

<br />

Finishes to lifts <br />

Finishes to Common Toilets <br />

Sanitary Fit out of Common Toilets <br />

Suspended Ceilings <br />

Raised Access floors <br />

Extension of Basic Mechanical and Electrical<br />

Services, Lighting, Heating, cooling and<br />

ventillation systems including controls, from the<br />

riser across the lettable floor space.<br />

32<br />

Building Element<br />

Shell<br />

and<br />

Core<br />

Cat<br />

A Fit<br />

Out<br />

Cat<br />

B Fit<br />

Out<br />

Building Envelope <br />

Emergency staircases <br />

Balustrades and Handrails to Emergency stairs <br />

Accomodation Stairs <br />

Balustrades and Handrails to Accomodation<br />

stairs <br />

Feature Stairs <br />

Balustrades and Handrails to Feature stairs <br />

Lifts <br />

Base Services, plant and equipment to edge of<br />

floor plates <br />

Life Safety Infrastructure, Sprinkler Pumps,<br />

tanks, risers, main fire alarm panels. <br />

Finishes to main entrances <br />

Finishes to common areas <br />

Finishes to Staircases fitted as part of shell<br />

and core <br />

<br />

Finishes to cores <br />

Fully fitted out WC's <br />

Sprinklers, Fire Alarms and basic safety<br />

signage <br />

Office Carpets <br />

Distributed power to each floor but not to each<br />

terminal point <br />

Installation of Cellular Offices <br />

Enhanced finishes <br />

Conference / Meeting Room Facilities <br />

IT and AV Installations <br />

Tea Point and Kitchen Fit Out <br />

Furniture

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!