Two Stage (based on traditional)<br />

Concerns / Considerations<br />

<br />

position during 2nd stage –<br />

question mark over obtaining<br />

the best price.<br />

Advantages<br />

<br />

Client<br />

Main Contractor can be<br />

engaged earlier to advise on<br />

‘buildability’, sequencing & subcontractor<br />

selection.<br />

Client Rep<br />

Design Team<br />

<br />

of 2nd Stage – particularly on<br />

large and complex schemes.<br />

Encorages a more collaborative<br />

approach<br />

Main<br />

Contractor<br />

<br />

creep must be avoided /<br />

minimised to secure a realistic<br />

and achievable lump sum<br />

contract.<br />

<br />

Greater Client involvement in the<br />

pre-selection and appointment<br />

of s/c’s.<br />

Suppliers<br />

Ability to transfer greater degree<br />

of design risk to the contractor.<br />

<br />

Brief Design<br />

Trade<br />

contractors<br />

Key Features<br />

<br />

completion (normally based on prelims, oh&p,<br />

approx quants & prov sums) & programme<br />

<br />

the competitive tendering of work pacakges<br />

<br />

<br />

© Rider Levett Bucknall <strong>UK</strong> <strong>2013</strong><br />

Tender<br />

Construct<br />

89