Specification 12 <strong>Hot</strong> <strong>Rolled</strong> <strong>Asphalt</strong> <strong>and</strong> <strong>Macadam</strong> for Airfields 3 Constituent Materials<br />

TABLE 3.2 REQUIRED PROPERTIES FOR COARSE AGGREGATES<br />

Property Test Method Aggregate type<br />

Resistance to<br />

freezing <strong>and</strong> thawing<br />

BS EN 1367-2/<br />

<strong>Hot</strong> <strong>Rolled</strong><br />

<strong>Asphalt</strong><br />

Material<br />

<strong>Asphalt</strong><br />

<strong>Concrete</strong><br />

(<strong>Macadam</strong>)<br />

Pervious<br />

<strong>Macadam</strong><br />

Each source MS18 MS18 –<br />

Appendix A ‡ Each fraction MS30 MS30 –<br />

Shape BS EN 933-3 All FI35 FI35 FI35<br />

Resistance to<br />

fragmentation<br />

BS EN 1097-2<br />

Water absorption BS EN 933-3<br />

Affinity between<br />

aggregate <strong>and</strong><br />

bitumen<br />

Resistance to<br />

Polishing<br />

BS EN 12697-11<br />

Part B<br />

BS EN 1097-8<br />

All except gravel LA30 LA30 LA30<br />

Gravel n/a LA25 n/a<br />

All except slag WA242 WA242 WA242<br />

Blast furnace slag n/a WA244 WA244<br />

All Not greater than 6 particles from a 150<br />

particle test sample<br />

Runway surface course PSVdeclared* PSVdeclared * –<br />

Taxiway surface course PSVdeclared * PSVdeclared * –<br />

Sulfur Content BS EN 1744-1 Blast furnace slag n/a ≤ 2 % ≤ 2 %<br />

Volume Stability BS EN 1744-1 Blast furnace slag n/a V 3.5 V 3.5<br />

Bulk Density BS EN 1097-6 Blast furnace slag n/a ≥ 1.12 Mg/m³ ≥ 1.12 Mg/m³<br />

‡ BS EN 1367-2: 1998 is restricted to the 14/10 mm fraction but, for this purpose, the same techniques<br />

shall also be used for other fractions <strong>of</strong> the coarse aggregate. Advice on the use <strong>of</strong> the test with nonst<strong>and</strong>ard<br />

aggregate fractions is given in Appendix A.<br />

– No category or limit.<br />

* Project Manager to provide value for specific job specification; advice given in Clause Z.5 <strong>of</strong><br />

Appendix Z.<br />

n/a Not applicable.<br />

3.3 FINE AGGREGATES<br />

3.3.1 Subject to the limitations set in Table 3.1,<br />

fine aggregates shall be:<br />

• natural bank, river, dune, or pit s<strong>and</strong>;<br />

• blast furnace or steel slag;<br />

• crushed rock; or<br />

• blends <strong>of</strong> s<strong>and</strong>, slag <strong>and</strong> crushed rock<br />

<strong>and</strong> shall be free from loosely bonded<br />

aggregations <strong>and</strong> other foreign matter. Seadredged<br />

s<strong>and</strong> shall not be permitted.<br />

3.3.2 The properties <strong>of</strong> the fine aggregate shall<br />

conform to the BS EN 13043 Categories shown in<br />

Table 3.3.<br />

3.4 ADDED FILLER<br />

3.4.1 All filler aggregate used in the <strong>Hot</strong> <strong>Rolled</strong><br />

<strong>Asphalt</strong> <strong>and</strong> <strong>Asphalt</strong> <strong>Concrete</strong> (<strong>Macadam</strong>) shall be<br />

CE marked.<br />

3.4.2 The type <strong>of</strong> filler aggregate to be used for<br />

a particular material shall be selected from the<br />

alternatives in Table 3.4.<br />

3.4.3 Filler aggregate shall be stored in dry<br />

conditions.<br />

3.4.4 The grading <strong>of</strong> added filler aggregate<br />

shall conform to Clause 5.2.1 <strong>of</strong> BS EN 13043.<br />

3.4.5 The loose bulk density in kerosene <strong>of</strong><br />

added filler aggregate, other than hydrated lime,<br />

shall be in accordance with Clause 5.5.5 <strong>of</strong><br />

BS EN 13043.<br />

3.4.6 A copy <strong>of</strong> all filler aggregate delivery<br />

tickets shall be passed to the Project Manager on<br />

a regular basis during production, for his retention.<br />