Specification 12 <strong>Hot</strong> <strong>Rolled</strong> <strong>Asphalt</strong> <strong>and</strong> <strong>Macadam</strong> for Airfields 9 Summary <strong>of</strong> Tests<br />

9.7.5 Attempts to correct the surface accuracy<br />

with fine asphalt dressings, synthetic resin<br />

TABLE 9.5 ROUTINE TESTS DURING LAYING AND COMPACTION<br />

Test Ref.<br />

Clause<br />

Wind speed<br />

<strong>and</strong> air<br />

temperature<br />

Material<br />

temperature<br />

Surface<br />

accuracy<br />

Test Method Sample<br />

From<br />

formulations, surface dressing applications, or<br />

emulsion slurry films shall not be allowed.<br />

Minimum<br />

Frequency<br />

7.2 n/a n/a Whenever<br />

laying<br />

planned<br />

4.6, 5.3<br />

<strong>and</strong> 7.8<br />

BS EN 12697-13 Paving<br />

train<br />

Use For Results<br />

Assess suitability <strong>of</strong> weather<br />

conditions for laying.<br />

Each load Check on delivery temperature<br />

7.25 BS EN 13036-7 Previous Daily Ensure compliance; if more than 2<br />

day’s work<br />

tests in each group <strong>of</strong> 20 fail to<br />

comply, the additional tests<br />

specified in Clause 9.7 shall be<br />

carried out<br />

Finished Levels 7.24 n/a<br />

Core samples 7.26 <strong>and</strong><br />

7.27<br />

Course<br />

thickness<br />

Air voids<br />

content<br />

Percentage<br />

refusal density<br />

Ensure compliance<br />

BS EN 12697-27 Previous Samples<br />

day’s work from every †<br />

7.10 n/a<br />

laid (or from<br />

every 2 h<br />

work,<br />

whichever is<br />

the more<br />

Ensure compliance; if any test<br />

fails to comply, the additional<br />

tests specified in Clause 9.7 shall<br />

be carried out. *<br />

7.26 BS EN 12697-5<br />

frequent);<br />

<strong>and</strong> at<br />

locations<br />

agreed with<br />

the Project<br />

Ensure compliance; if the test<br />

results fail to comply, the<br />

additional tests specified in<br />

Clause 7.26 shall be carried out.<br />

7.27 Sub-Clause<br />

Manager Ensure compliance; if the test<br />

7.27.1<br />

results fail to comply, the<br />

additional tests specified in<br />

Clause 7.27 shall be carried out.<br />

† Project Manager to provide value for specific job specification; advice given in Clause Z.14 <strong>of</strong> Appendix Z.<br />

* The requirements <strong>of</strong> Clauses 7.5, 7.6 <strong>and</strong> 7.9 shall be checked when cores fail in adhesion, <strong>and</strong> the<br />

necessary corrections <strong>and</strong> adjustments shall be made to eliminate the cause <strong>of</strong> the failure.<br />