Specification 12 <strong>Hot</strong> <strong>Rolled</strong> <strong>Asphalt</strong> <strong>and</strong> <strong>Macadam</strong> for Airfields 9 Summary <strong>of</strong> Tests<br />
9.7.5 Attempts to correct the surface accuracy<br />
with fine asphalt dressings, synthetic resin<br />
TABLE 9.5 ROUTINE TESTS DURING LAYING AND COMPACTION<br />
Test Ref.<br />
Clause<br />
Wind speed<br />
<strong>and</strong> air<br />
temperature<br />
Material<br />
temperature<br />
Surface<br />
accuracy<br />
Test Method Sample<br />
From<br />
formulations, surface dressing applications, or<br />
emulsion slurry films shall not be allowed.<br />
Minimum<br />
Frequency<br />
7.2 n/a n/a Whenever<br />
laying<br />
planned<br />
4.6, 5.3<br />
<strong>and</strong> 7.8<br />
BS EN 12697-13 Paving<br />
train<br />
Use For Results<br />
Assess suitability <strong>of</strong> weather<br />
conditions for laying.<br />
Each load Check on delivery temperature<br />
7.25 BS EN 13036-7 Previous Daily Ensure compliance; if more than 2<br />
day’s work<br />
tests in each group <strong>of</strong> 20 fail to<br />
comply, the additional tests<br />
specified in Clause 9.7 shall be<br />
carried out<br />
Finished Levels 7.24 n/a<br />
Core samples 7.26 <strong>and</strong><br />
7.27<br />
Course<br />
thickness<br />
Air voids<br />
content<br />
Percentage<br />
refusal density<br />
Ensure compliance<br />
BS EN 12697-27 Previous Samples<br />
day’s work from every †<br />
7.10 n/a<br />
laid (or from<br />
every 2 h<br />
work,<br />
whichever is<br />
the more<br />
Ensure compliance; if any test<br />
fails to comply, the additional<br />
tests specified in Clause 9.7 shall<br />
be carried out. *<br />
7.26 BS EN 12697-5<br />
frequent);<br />
<strong>and</strong> at<br />
locations<br />
agreed with<br />
the Project<br />
Ensure compliance; if the test<br />
results fail to comply, the<br />
additional tests specified in<br />
Clause 7.26 shall be carried out.<br />
7.27 Sub-Clause<br />
Manager Ensure compliance; if the test<br />
7.27.1<br />
results fail to comply, the<br />
additional tests specified in<br />
Clause 7.27 shall be carried out.<br />
† Project Manager to provide value for specific job specification; advice given in Clause Z.14 <strong>of</strong> Appendix Z.<br />
* The requirements <strong>of</strong> Clauses 7.5, 7.6 <strong>and</strong> 7.9 shall be checked when cores fail in adhesion, <strong>and</strong> the<br />
necessary corrections <strong>and</strong> adjustments shall be made to eliminate the cause <strong>of</strong> the failure.<br />