Specification 12 <strong>Hot</strong> <strong>Rolled</strong> <strong>Asphalt</strong> <strong>and</strong> <strong>Macadam</strong> for Airfields 7 Plant <strong>and</strong> Workmanship<br />
7.23 TEMPORARY RAMPS<br />
Figure 7.1 – Ramps between New Surfacing <strong>and</strong> Existing Pavements<br />
Figure 7.2 – Ramps between Surface Course <strong>and</strong> Existing Pavements<br />
(NOTE. This is a specimen clause only; the Project<br />
Manager must agree the details with the Aerodrome<br />
Authority/Station staff on a job-specific basis. Further<br />
advice for the Project manager is given in Clause Z.11<br />
<strong>of</strong> Appendix Z.)<br />
7.23.1 Temporary ramps (e.g. to enable aircraft<br />
operations to continue during daylight hours with<br />
construction work being carried out at night) shall<br />
be constructed in the same manner as specified in<br />
SEE FIGURE 7.2<br />
Clause 7.22. However, where the Contractor can<br />
demonstrate to the satisfaction <strong>of</strong> the Project<br />
Manager that he can provide an acceptable <strong>and</strong><br />
sound surfacing without the use <strong>of</strong> the saw cut,<br />
the saw cutting may be omitted.<br />
7.23.2 Prior to the commencement <strong>of</strong> each *<br />
work, the Contractor shall obtain the approval <strong>of</strong><br />
the Project Manager to the proposed layout <strong>of</strong> the<br />
temporary ramps. At no time shall there be more<br />
than one ramp in the length <strong>of</strong> each <strong>Hot</strong> <strong>Rolled</strong><br />