Specification 12 <strong>Hot</strong> <strong>Rolled</strong> <strong>Asphalt</strong> <strong>and</strong> <strong>Macadam</strong> for Airfields 7 Plant <strong>and</strong> Workmanship<br />
with Clause 7.2. The covers on the delivery lorry<br />
shall only be rolled back sufficiently to discharge<br />
sufficient material for immediate use. At the<br />
discretion <strong>of</strong> the Project Manager, Pervious<br />
<strong>Macadam</strong> may be laid by a small width screed<br />
paver where support on either side <strong>of</strong> the French<br />
drain is deemed sufficient. Alternatively, Pervious<br />
<strong>Macadam</strong> shall be spread with hot shovels carefully<br />
to avoid contamination from adjacent vegetable<br />
growth or other foreign material. It shall be spread<br />
portion by portion in a single uniform layer along the<br />
length <strong>of</strong> the drain to the required width, <strong>and</strong><br />
levelled <strong>of</strong>f with hot h<strong>and</strong> rakes by skilled operators<br />
to give the correct shape <strong>and</strong> pr<strong>of</strong>ile after<br />
compaction.<br />
7.17.2 The Pervious <strong>Macadam</strong> shall be compacted<br />
by a smooth wheeled t<strong>and</strong>em roller <strong>of</strong> mass not<br />
exceeding 3 tonnes having a roller width not<br />
exceeding that <strong>of</strong> the French Drain. No vibration<br />
shall be permitted. Pervious <strong>Macadam</strong> shall be laid<br />
within 3 h <strong>of</strong> manufacture.<br />
7.18 LONGITUDINAL LANE JOINTS,<br />
GENERAL<br />
Longitudinal joints in surfacing materials shall be<br />
constructed in such a position that they are at least<br />
600 mm horizontally away from any longitudinal<br />
joints in the underlying material. The longitudinal<br />
lane joints shall be vertical in straight lines which<br />
are continuous for the full length <strong>of</strong> the pavement,<br />
or in smooth curves around bends.<br />
7.19 LONGITUDINAL LANE JOINTS IN<br />
MATERIALS OTHER THAN<br />
PERVIOUS MACADAM<br />
7.19.1 The exposed vertical edges <strong>of</strong> the<br />
longitudinal lane joints in the surfacing materials<br />
shall be carefully cut back <strong>and</strong> trimmed to firm<br />
material in the compacted lane, or for a minimum <strong>of</strong><br />
one half <strong>and</strong> a times the layer thickness, whichever<br />
is the greater, <strong>and</strong> all loose material arising from<br />
this operation shall be removed from the pavement<br />
before the cut edge is painted.<br />
7.19.2 Edge rolling shall only be used as an<br />
alternative to cutting back if it can be demonstrated<br />
during the trials to the Project Manager that<br />
satisfactory st<strong>and</strong>ards <strong>of</strong> compaction, surface/joint<br />
finish <strong>and</strong> adhesion can be achieved.<br />
(NOTE. Cores should be taken for test at these joints to<br />
demonstrate good adhesion <strong>and</strong> bulk density within the<br />
specified limits.)<br />
7.19.3 Cutting back <strong>and</strong> trimming will not be<br />
required when two or more spreading units operate<br />
in echelon in close proximity, permitting adjacent<br />
lanes to be continuously compacted before the<br />
material around the joint between the lanes falls<br />
below the compaction temperature specified in<br />
Clause 4.6 for <strong>Hot</strong> <strong>Rolled</strong> <strong>Asphalt</strong> or Clause 5.3 for<br />
<strong>Asphalt</strong> <strong>Concrete</strong> (<strong>Macadam</strong>).<br />
7.19.4 After cutting back <strong>and</strong> trimming, the<br />
exposed vertical edges <strong>of</strong> the longitudinal lane<br />
joints shall be thoroughly cleaned <strong>of</strong> all adherent<br />
material <strong>and</strong> shall then be painted with a uniform<br />
thickness <strong>of</strong> bitumen just ahead <strong>of</strong> the spreading<br />
unit laying the adjacent lane. Painting shall<br />
completely <strong>and</strong> uniformly cover the exposed edge<br />
for its full depth. Excess material to the top <strong>and</strong><br />
base <strong>of</strong> the joints, streakiness <strong>and</strong> blobs shall be<br />
avoided.<br />
7.19.5 On completion, the joints shall present the<br />
same texture as the remainder <strong>of</strong> the surface <strong>and</strong><br />
the accuracy <strong>of</strong> the surface across the joints shall<br />
meet the criteria specified in Clause 7.25.<br />
7.19.6 When laying during cool windy weather, a<br />
joint heater may be used subject to the discretion <strong>of</strong><br />
the Project Manager.<br />
7.20 TRANSVERSE JOINTS<br />
7.20.1 Transverse joints are required at the end <strong>of</strong><br />
a day’s work <strong>and</strong> following any interruption in laying<br />
which prevents continuity <strong>of</strong> rolling at, or above, the<br />
specified minimum temperature. Transverse joints<br />
shall be formed at right angles to the longitudinal<br />
joints <strong>and</strong> shall be vertical.<br />
7.20.2 The exposed vertical edges <strong>of</strong> the<br />
transverse joints <strong>of</strong> all layers shall be cut back for at<br />
least 300 mm <strong>and</strong> trimmed. All loose material<br />
arising from this operation shall be removed from<br />
the pavement <strong>and</strong> the underlying surface cleaned.<br />
The exposed joint edges shall then be cleaned <strong>and</strong><br />
painted with bitumen as specified in Clause 7.19<br />
immediately before the laying <strong>of</strong> the lane continues.<br />
7.20.3 On completion, the joints shall present the<br />
same texture as the remainder <strong>of</strong> the surface <strong>and</strong><br />
the accuracy <strong>of</strong> the surface across the joints shall<br />
meet the criteria specified in Clause 7.25.<br />
July 2010 25