Specification 12 <strong>Hot</strong> <strong>Rolled</strong> <strong>Asphalt</strong> <strong>and</strong> <strong>Macadam</strong> for Airfields 8 Trials<br />

8 Trials<br />

8.1 GENERAL<br />

Trials shall be carried out on all asphalt mixtures,<br />

other than Pervious <strong>Macadam</strong> drainage material,<br />

proposed for use in the Works. For small works,<br />

the procedures <strong>and</strong> requirements for the preliminary<br />

<strong>and</strong> final trials may be combined <strong>and</strong>/or modified at<br />

the discretion <strong>of</strong> the Project Manager.<br />

8.2 PRELIMINARY TRIALS<br />

8.2.1 For each asphalt, after the design mixture<br />

or recipe mixture has been approved by the Project<br />

Manager (see Clauses 4.2, 4.3 <strong>and</strong> 5.2), the<br />

Contractor shall mix at least one 20 tonne batch <strong>of</strong><br />

the material for laying in preliminary trials. At the<br />

discretion <strong>of</strong> the Project Manager, this requirement<br />

may be modified for regulation or ramping material.<br />

8.2.2 Preliminary trial mixtures, for design or<br />

recipe mixtures, shall be made up in the mixers that<br />

the Contractor proposes to use at the appropriate<br />

mixing temperatures <strong>and</strong> with the aggregates<br />

proportioned from either:<br />

• the various hot bins for a Batch Mixer; or<br />

• the cold feed hoppers for a Continuous Drum<br />

Mixer<br />

to produce the required aggregate grading with the<br />

binder content at the appropriate design binder<br />

content or specified figure for recipe mixtures.<br />

8.2.3 Preliminary trial mixtures for design <strong>Hot</strong><br />

<strong>Rolled</strong> <strong>Asphalt</strong> mixtures shall be made up from the<br />

laboratory design mixtures determined in<br />

accordance with Clause 4.2.<br />

8.2.4 The preliminary trial mixtures shall be laid<br />

on disused pavements within the airfield boundary,<br />

in locations selected by the Project Manager. The<br />

materials shall be laid <strong>and</strong> compacted according to<br />

the requirements <strong>of</strong> BS 594987 <strong>and</strong> this<br />

Specification, according to material type <strong>and</strong><br />

specified thickness.<br />

8.2.5 The mixture shall be transported to the<br />

airfield <strong>and</strong> laid <strong>and</strong> compacted on a clean firm <strong>and</strong><br />

level test area, not being part <strong>of</strong> the works, using<br />

delivery, paving <strong>and</strong> compaction machinery that the<br />

Contractor proposes to use during the works. The<br />

area shall be tack or bond coated prior to laying.<br />

The Contractor shall select paving <strong>and</strong> compaction<br />

operations such that no laying defects such as<br />

dragging or surface blemishes result, to the<br />

satisfaction <strong>of</strong> the Project Manager. The Project<br />

Manager may order further 20 tonne loads to be laid<br />

until a satisfactory result is achieved.<br />

(NOTE 1. Attention needs to be given to the material<br />

feed rate via the paver screws to the screed to avoid<br />

dragging <strong>and</strong> segregation.)<br />

(NOTE 2. For planning purposes, the following equations<br />

will assist the Contractor to select paving <strong>and</strong> rolling rates<br />

to achieve the minimum specified number <strong>of</strong> roller passes<br />

before the surfacing has cooled to the minimum<br />

temperature for compaction:<br />

Rolling length (m) = average paving speed (m/min) x 8 (min)<br />

Roller passes = (Rolling rate/Paving Rate) x No <strong>of</strong> Rollers<br />

where:<br />

Rolling rate (m²/min) = Roller width (m) x Roller speed (m/min)<br />

Paver rate (m²/min) = Paver width (m) x Paver speed (m/min))<br />

8.2.6 The paving <strong>and</strong> rolling rates, demonstrated<br />

to be satisfactory during the laying <strong>of</strong> the trial<br />

mixture, shall be agreed with the Project Manager<br />

<strong>and</strong> shall be adhered to during the main works.<br />

8.2.7 The Contractor shall submit the results <strong>of</strong><br />

an analysis, carried out in accordance with<br />

BS EN 12697-1 <strong>and</strong> BS EN 12697-2, to the Project<br />

Manager for each load <strong>of</strong> the trial mixture laid to<br />

demonstrate compliance with the requirements <strong>of</strong><br />

Clauses 4.4, 4.5 or 5.2.<br />

8.2.8 If the preliminary trials indicate that the trial<br />

mixtures are unsatisfactory for mechanical<br />

spreading <strong>and</strong> compacting, or fail to produce the<br />

specified surface accuracy or result in surface<br />

blemishes which are unacceptable, the proportion<br />

<strong>of</strong> binder <strong>and</strong> the grading <strong>of</strong> the combined<br />

aggregates <strong>and</strong> filler aggregate may be slightly<br />

modified within the limits <strong>of</strong> the Specification.<br />

(NOTE. If changes outside <strong>of</strong> the specification limits are<br />

required, a new design may be necessary for non-recipe<br />

mixtures.)<br />

8.2.9 Further preliminary trials shall then be laid<br />

to demonstrate that a satisfactory mixture has been<br />

achieved. The Project Manager will then agree the<br />

mixture <strong>and</strong> appropriate specification limits <strong>and</strong><br />

authorise the laying <strong>of</strong> a final trial area as described<br />

in Clause 8.3.<br />