Specification 12 <strong>Hot</strong> <strong>Rolled</strong> <strong>Asphalt</strong> <strong>and</strong> <strong>Macadam</strong> for Airfields 7 Plant <strong>and</strong> Workmanship<br />
• 10 mm in 3 m when a surface course only is to<br />
be overlaid on it; or<br />
• 25 mm in 3 m when a binder course <strong>and</strong> surface<br />
course are to be overlaid on it.<br />
7.12 LAYING REQUIREMENTS<br />
7.12.1 A competent supervisor shall be in charge<br />
<strong>of</strong> all laying <strong>and</strong> finishing operations.<br />
7.12.2 The mixtures shall be spread to surcharged<br />
depths necessary to give the specified course<br />
thickness, <strong>and</strong> to comply with the finished levels<br />
<strong>and</strong> pr<strong>of</strong>iles shown on the drawings, after<br />
compaction.<br />
7.12.3 Surface course shall be laid on binder<br />
courses as soon as practicable in order to provide<br />
adhesion with the binder course. Binder courses<br />
which have been left exposed for more than seven<br />
days shall be tack or bond coated in accordance<br />
with Clause 7.9 before the laying <strong>of</strong> surface course.<br />
7.12.4 The use <strong>of</strong> h<strong>and</strong>-rakes shall be prohibited<br />
when the mixtures are laid by spreading <strong>and</strong><br />
finishing machines in accordance with Clause 7.14<br />
except at joint edges <strong>and</strong> around manholes <strong>and</strong><br />
pits, where their use shall be restricted to an<br />
absolute minimum.<br />
7.12.5 After the spreading units have passed,<br />
h<strong>and</strong>-casting <strong>of</strong> fines behind the spreader as a<br />
means <strong>of</strong> making-up irregularities or disguising<br />
blemishes left by the spreader shall not be<br />
permitted.<br />
7.12.6 At all times, the courses shall be kept free<br />
from all extraneous matter.<br />
7.13 SAMPLING OF MIXED MATERIALS<br />
7.13.1 Bulk samples <strong>of</strong> the mixed material sent to<br />
the site, as required in sub-Clause 9.5.1, shall be<br />
taken by the Contractor <strong>and</strong> divided. One sample<br />
shall be analysed for grading <strong>and</strong> binder content,<br />
<strong>and</strong> the other retained for reference in the case <strong>of</strong> a<br />
dispute.<br />
7.13.2 The samples can be taken at the batching<br />
plant or at the site, with the alternative selected to<br />
be notified at Tender Stage. If the sample is to be<br />
taken at the site, it shall be taken from the paver<br />
screws after approximately half <strong>of</strong> the lorry load has<br />
been discharged through the paver.<br />
7.13.3 Samples shall be labelled <strong>and</strong> details shall<br />
include material type, date <strong>of</strong> delivery, vehicle<br />
registration number, course location <strong>and</strong> time <strong>of</strong><br />
laying <strong>and</strong> other relevant information deemed<br />
necessary by the Project Manager.<br />
7.14 SPREADING BY MACHINE<br />
7.14.1 Except where the conditions <strong>of</strong> Clause 7.16<br />
apply, the mixture shall be spread, levelled <strong>and</strong><br />
tamped by approved self-propelled spreading <strong>and</strong><br />
finishing machines which are capable <strong>of</strong><br />
continuously laying to the required widths, pr<strong>of</strong>ile,<br />
camber or crossfall without causing segregation,<br />
dragging, burning or other surface defects or<br />
irregularities. They shall also be capable <strong>of</strong><br />
operating at a speed consistent with the type <strong>and</strong><br />
thickness <strong>of</strong> the asphalt being laid.<br />
(NOTE. The method <strong>of</strong> control should be adequate to<br />
achieve the tolerances required <strong>and</strong> should not be limited<br />
by the length <strong>of</strong> the paving equipment if that is not<br />
sufficient. It may be necessary to use a wire guidance<br />
system or averaging beam to achieve the required<br />
accuracy in certain critical situations, such as at or in the<br />
vicinity <strong>of</strong> w<strong>and</strong>ering crowns or for laying <strong>of</strong> regulating<br />
courses.)<br />
7.14.2 Any extension beyond the basic width <strong>of</strong><br />
the machine shall be strictly in accordance with the<br />
manufacturer’s recommendations <strong>and</strong> shall give a<br />
level uniform surface over the full width <strong>of</strong> the lane<br />
to the satisfaction <strong>of</strong> the Project Manager.<br />
7.14.3 Each spreader shall be maintained in good<br />
mechanical condition <strong>and</strong> shall be correctly<br />
adjusted for operation at the speed consistent with<br />
the character <strong>and</strong> rate <strong>of</strong> delivery <strong>of</strong> the mixture <strong>and</strong><br />
the thickness <strong>and</strong> agreed rolling procedures for the<br />
course, to produce a surface <strong>of</strong> uniform density <strong>and</strong><br />
texture free from segregation, dragging,<br />
irregularities, or other unacceptable surface<br />
blemishes. If dragging or other faults should occur,<br />
laying shall cease until the mechanism <strong>and</strong><br />
operation <strong>of</strong> the units have been checked <strong>and</strong> the<br />
defects have been rectified or modifications made.<br />
7.14.4 As soon as possible after arrival at the<br />
laying site, the mixtures shall be discharged<br />
continuously to the spreader <strong>and</strong> shall be laid in<br />
accordance with the requirements <strong>of</strong> Clause 7.12<br />
without delay. When discharging into the spreader,<br />
the lorry shall approach <strong>and</strong> gentle contact shall be<br />
made only between rollers on the spreader <strong>and</strong> the<br />
rear wheels <strong>of</strong> the lorry to avoid causing the paver<br />
screed to indent the mat.<br />
July 2010 23