Specification 12 <strong>Hot</strong> <strong>Rolled</strong> <strong>Asphalt</strong> <strong>and</strong> <strong>Macadam</strong> for Airfields 7 Plant <strong>and</strong> Workmanship<br />

• 10 mm in 3 m when a surface course only is to<br />

be overlaid on it; or<br />

• 25 mm in 3 m when a binder course <strong>and</strong> surface<br />

course are to be overlaid on it.<br />

7.12 LAYING REQUIREMENTS<br />

7.12.1 A competent supervisor shall be in charge<br />

<strong>of</strong> all laying <strong>and</strong> finishing operations.<br />

7.12.2 The mixtures shall be spread to surcharged<br />

depths necessary to give the specified course<br />

thickness, <strong>and</strong> to comply with the finished levels<br />

<strong>and</strong> pr<strong>of</strong>iles shown on the drawings, after<br />

compaction.<br />

7.12.3 Surface course shall be laid on binder<br />

courses as soon as practicable in order to provide<br />

adhesion with the binder course. Binder courses<br />

which have been left exposed for more than seven<br />

days shall be tack or bond coated in accordance<br />

with Clause 7.9 before the laying <strong>of</strong> surface course.<br />

7.12.4 The use <strong>of</strong> h<strong>and</strong>-rakes shall be prohibited<br />

when the mixtures are laid by spreading <strong>and</strong><br />

finishing machines in accordance with Clause 7.14<br />

except at joint edges <strong>and</strong> around manholes <strong>and</strong><br />

pits, where their use shall be restricted to an<br />

absolute minimum.<br />

7.12.5 After the spreading units have passed,<br />

h<strong>and</strong>-casting <strong>of</strong> fines behind the spreader as a<br />

means <strong>of</strong> making-up irregularities or disguising<br />

blemishes left by the spreader shall not be<br />

permitted.<br />

7.12.6 At all times, the courses shall be kept free<br />

from all extraneous matter.<br />

7.13 SAMPLING OF MIXED MATERIALS<br />

7.13.1 Bulk samples <strong>of</strong> the mixed material sent to<br />

the site, as required in sub-Clause 9.5.1, shall be<br />

taken by the Contractor <strong>and</strong> divided. One sample<br />

shall be analysed for grading <strong>and</strong> binder content,<br />

<strong>and</strong> the other retained for reference in the case <strong>of</strong> a<br />

dispute.<br />

7.13.2 The samples can be taken at the batching<br />

plant or at the site, with the alternative selected to<br />

be notified at Tender Stage. If the sample is to be<br />

taken at the site, it shall be taken from the paver<br />

screws after approximately half <strong>of</strong> the lorry load has<br />

been discharged through the paver.<br />

7.13.3 Samples shall be labelled <strong>and</strong> details shall<br />

include material type, date <strong>of</strong> delivery, vehicle<br />

registration number, course location <strong>and</strong> time <strong>of</strong><br />

laying <strong>and</strong> other relevant information deemed<br />

necessary by the Project Manager.<br />

7.14 SPREADING BY MACHINE<br />

7.14.1 Except where the conditions <strong>of</strong> Clause 7.16<br />

apply, the mixture shall be spread, levelled <strong>and</strong><br />

tamped by approved self-propelled spreading <strong>and</strong><br />

finishing machines which are capable <strong>of</strong><br />

continuously laying to the required widths, pr<strong>of</strong>ile,<br />

camber or crossfall without causing segregation,<br />

dragging, burning or other surface defects or<br />

irregularities. They shall also be capable <strong>of</strong><br />

operating at a speed consistent with the type <strong>and</strong><br />

thickness <strong>of</strong> the asphalt being laid.<br />

(NOTE. The method <strong>of</strong> control should be adequate to<br />

achieve the tolerances required <strong>and</strong> should not be limited<br />

by the length <strong>of</strong> the paving equipment if that is not<br />

sufficient. It may be necessary to use a wire guidance<br />

system or averaging beam to achieve the required<br />

accuracy in certain critical situations, such as at or in the<br />

vicinity <strong>of</strong> w<strong>and</strong>ering crowns or for laying <strong>of</strong> regulating<br />

courses.)<br />

7.14.2 Any extension beyond the basic width <strong>of</strong><br />

the machine shall be strictly in accordance with the<br />

manufacturer’s recommendations <strong>and</strong> shall give a<br />

level uniform surface over the full width <strong>of</strong> the lane<br />

to the satisfaction <strong>of</strong> the Project Manager.<br />

7.14.3 Each spreader shall be maintained in good<br />

mechanical condition <strong>and</strong> shall be correctly<br />

adjusted for operation at the speed consistent with<br />

the character <strong>and</strong> rate <strong>of</strong> delivery <strong>of</strong> the mixture <strong>and</strong><br />

the thickness <strong>and</strong> agreed rolling procedures for the<br />

course, to produce a surface <strong>of</strong> uniform density <strong>and</strong><br />

texture free from segregation, dragging,<br />

irregularities, or other unacceptable surface<br />

blemishes. If dragging or other faults should occur,<br />

laying shall cease until the mechanism <strong>and</strong><br />

operation <strong>of</strong> the units have been checked <strong>and</strong> the<br />

defects have been rectified or modifications made.<br />

7.14.4 As soon as possible after arrival at the<br />

laying site, the mixtures shall be discharged<br />

continuously to the spreader <strong>and</strong> shall be laid in<br />

accordance with the requirements <strong>of</strong> Clause 7.12<br />

without delay. When discharging into the spreader,<br />

the lorry shall approach <strong>and</strong> gentle contact shall be<br />

made only between rollers on the spreader <strong>and</strong> the<br />

rear wheels <strong>of</strong> the lorry to avoid causing the paver<br />

screed to indent the mat.<br />