Specification 12 <strong>Hot</strong> <strong>Rolled</strong> <strong>Asphalt</strong> <strong>and</strong> <strong>Macadam</strong> for Airfields 9 Summary <strong>of</strong> Tests<br />

TABLE 9.4 ROUTINE TESTS ON PLANT MIXTURES<br />

Test Test Method Sample<br />

From<br />

Analysis <strong>of</strong><br />

the plant<br />

mixtures<br />

BS EN 12697-1<br />

BS EN 12697-2<br />

After the<br />

completion<br />

<strong>of</strong> the<br />

mixing<br />

process<br />

Minimum<br />

Frequency<br />

Every 4 h<br />

but not less<br />

than twice<br />

a day for<br />

each mixer<br />

in use<br />

Use For Results<br />

Determination <strong>of</strong> binder contents <strong>and</strong><br />

aggregate/filler proportioning <strong>and</strong> grading –<br />

results plotted on graphs in order to show<br />

comparison with the grading curve <strong>of</strong> the<br />

mixture approved in accordance with<br />

Clause 8.3 <strong>and</strong> the relevant binder content<br />

Temperature BS EN 12697-13 Lorry Every load Check for compliance with Clauses 4.6, 5.3<br />

<strong>and</strong> 7.8<br />

9.5.2 If either the grading or the binder content<br />

<strong>of</strong> any individual test, out <strong>of</strong> the total number <strong>of</strong><br />

tests for the day’s production <strong>of</strong> that mixture, fails<br />

to comply with the specified requirements, the<br />

additional tests specified in Clause 9.7 shall be<br />

carried out.<br />

9.6 ROUTINE TESTS DURING LAYING<br />

AND ON COMPACTED COURSES<br />

The Contractor shall undertake the series <strong>of</strong> tests<br />

on asphalt materials incorporated into the works<br />

necessary to comply with the relevant<br />

specification clauses listed in Table 9.5.<br />

9.7 ADDITIONAL TESTS WHEN<br />

ROUTINE TESTS ON THE<br />

MIXTURES AND ON THE<br />

COMPACTED COURSES FAIL<br />

9.7.1 The Contractor (or his materials supplier<br />

on his behalf) shall carry out the following<br />

additional tests when routine tests fail to establish<br />

the extent to which material already laid fails to<br />

meet the requirements specified for:<br />

• aggregate/filler grading, <strong>and</strong> binder content;<br />

• course thickness;<br />

• air voids content for <strong>Hot</strong> <strong>Rolled</strong> <strong>Asphalt</strong>;<br />

• percentage refusal density for asphalt<br />

<strong>Concrete</strong> (<strong>Macadam</strong>); or<br />

• surface accuracy.<br />

9.7.2 These additional tests (other than for<br />

surface accuracy) shall be made on:<br />

• four 300 mm square samples for checking<br />

grading <strong>and</strong> binder content;<br />

• four 150 mm diameter cores for checking<br />

course thickness; or<br />

• as specified in Clauses 7.26 <strong>and</strong> 7.27 for<br />

checking air voids content <strong>and</strong> percentage<br />

refusal density, respectively.<br />

The samples or cores shall be cut from the<br />

compacted course, at positions selected by the<br />

Project Manager, within the lane width at a<br />

distance <strong>of</strong> not more than 5 m from the location in<br />

the pavement at which the mixture was laid which<br />

failed to satisfy the routine test requirements<br />

specified.<br />

9.7.3 If any one <strong>of</strong> the additional test results for<br />

aggregate/filler grading, binder content or course<br />

thickness also indicate failure to meet the<br />

specified requirement, further tests shall be made<br />

on 3 more samples or cores. These samples or<br />

cores shall be cut at further positions selected by<br />

the Project Manager, also within the lane width<br />

<strong>and</strong> at a distance <strong>of</strong> not more than 10 m further<br />

along the lane from the location <strong>of</strong> the previous<br />

failure point. Should one <strong>of</strong> these additional<br />

samples or cores also fail to meet the specified<br />

requirement, the above process shall be repeated<br />

until all samples or cores are satisfactory. The<br />

area covered by the failed samples <strong>of</strong> cores shall<br />

be cut out <strong>and</strong> replaced as detailed in<br />

Clauses 7.29 <strong>and</strong> 7.30.<br />

9.7.4 When a routine test fails to meet the<br />

requirements <strong>of</strong> Clause 7.25, an additional<br />

20 straightedge tests in accordance with<br />

BS EN 13036-7 shall be made over the area<br />

between the adjacent points where the routine<br />

test was undertaken for which the results<br />

complied with the requirements <strong>of</strong> Clause 7.25. If<br />

three or more <strong>of</strong> these additional tests also fail to<br />

meet the specified requirement, this area <strong>of</strong> the<br />

surfacing shall be condemned. The condemned<br />

areas shall be removed <strong>and</strong> replaced by the<br />

Contractor, at his own expense, as specified in<br />

Clauses 7.29 <strong>and</strong> 7.30.<br />

36 July 2010