NOT TO BE PRINTED_Draft Final TAAP comments duly
NOT TO BE PRINTED_Draft Final TAAP comments duly
NOT TO BE PRINTED_Draft Final TAAP comments duly
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Mr Michael<br />
Meadows Natural England Norwich 13 Policy TH 11 Comment<br />
Mr Paul Leeming Carter Jonas Harrogate 13 Policy TH 11 Agree<br />
Mr R Ward Thetford 13 Policy TH 11 Comment<br />
Mr Stephen<br />
Faulkner<br />
Norfolk County<br />
Council Norwich 13 Policy TH 11 Comment<br />
Mr Stuart Wilson Thetford 13 Policy TH 11 Comment<br />
Mr Stuart Wilson Thetford Society Thetford 13 Policy TH 11 Comment<br />
Mr Tom Gilbert-<br />
Wooldridge English Heritage Cambridge 13 Policy TH 11 Comment<br />
Mr. g Brighton Thetford 13 Policy TH 11 Comment<br />
With regards to the A11 road junction improvements required, we<br />
have highlighted the proximity of the works at the A11/A134 and<br />
A11/A1075 junctions to the Breckland SPA and SAC in our response<br />
to the EIA Scoping Opinion for the Thetford Sustainable Urban Agree. Scope of further works has been discussed with Natural<br />
Extension (letter dated 10 February 2011, ref. LA3.1/15843), and England, Highways Agency and NCC. Recognise this is a<br />
agree that further assessment is necessary.<br />
priority issue to be resolved before submission.<br />
HRA note on this issue has been<br />
received suggesting some<br />
amendments to the policy which will<br />
be taken on board.<br />
As part of the masterplan proposals and as detailed in the Thetford<br />
Transport Study a range of improvements to the strategic and local<br />
road network are required; primarily these relate to enhancements to<br />
the capacity of junctions rather than the road links. Policy TH11<br />
Changes to the A11 Trunk Road and Policy TH12 Improvements to<br />
the Local Road Network generally cover the range of measures put<br />
forward. Support noted. No further action.<br />
Would not think this is likely. This takes away some credibility of the<br />
whole scheme.<br />
Policy TH11 (b) junction standards - It is unclear why the policy limits<br />
the A11 (T) junction improvements to "at grade". It is suggested that<br />
the policy is more flexibly worded in terms of suitable mitigation<br />
solutions; Policy TH11 - Comments made by the Highways Agency<br />
when it was Policy TH28 (and forwarded to Breckland DC by the<br />
Transport evidence identifies that signalisation is a mechanism<br />
to ensure junctions work at peak periods. In principle it is<br />
acceptable to the highways agency. The plan is to 2026 during<br />
which time background growth on its own would result in issues<br />
on the trunk road. Look at most cost effective way of getting the<br />
most out of junctions No further action.<br />
Noted. HA <strong>comments</strong> received too late to inform this version of<br />
County Council on 20/12/10) do not appear to have been considered; the <strong>TAAP</strong>.<br />
At the moment the A11 grinds to a halt between Barton Mills and<br />
Thetford. One of the main causes is the traffic lights at Elveden Transport evidence identifies that signalisation is a mechanism<br />
which create a stop start queue of traffic. The idea to add more to ensure junctions work at peak periods. In principle it is<br />
traffic lights at the five junctions is short sighted. Although not acceptable to the Highways Agency. The plan is to 2026 during<br />
attractive and more expensive, flyovers do provide an uninterrupted which time background growth on its own would result in issues<br />
flow of vehicles. I do not want Thetford to be known as the bottleneck on the trunk road. Look at most cost effective way of getting the<br />
of East Anglia.<br />
At the moment the A11 grinds to a halt between Barton Mills and<br />
most out of junctions No further action.<br />
Thetford. One of the main causes is the traffic lights at Elveden Transport evidence identifies that signalisation is a mechanism<br />
which create a stop start queue of traffic. The idea to add more to ensure junctions work at peak periods. In principle it is<br />
traffic lights at the five junctions is short sighted. Although not acceptable to the highways agency. The plan is to 2026 during<br />
attractive and more expensive, flyovers do provide an uninterrupted which time background growth on its own would result in issues<br />
flow of vehicles. We do not want Thetford to be known as the on the trunk road. Look at most cost effective way of getting the<br />
bottleneck of East Anglia.<br />
Improvements to the Mundford Road junction, including roundabout<br />
enlargement and new signalling and lighting, will need to be carefully<br />
designed to avoid impacting on Gallows Hill Scheduled Monument<br />
and its setting. A dedicated slip road to the south-east of the<br />
junction, as suggested by the Thetford Transport Study (2010), could<br />
be particularly sensitive. Early consultation with English Heritage is<br />
most out of junctions No further action.<br />
advised.<br />
Should congest the A11 nicely (see Elveden traffic lights) pushing<br />
Agree. Raise at PPA<br />
traffic back through the town. No further action.<br />
Make all suggested changes.<br />
Discuss as part of PPA.<br />
Mrs Patricia Poel Thetford 13 Policy TH 11 Comment Traffic chaos will be everlasting.<br />
Traffic lights on junctions and roads results in traffic build up - look at<br />
No further action.<br />
Mrs T Allott By email 13 Policy TH 11 Comment Elveden No further action.<br />
T Ahern Thetford 13 Policy TH 11 Comment<br />
T Friend Thetford 13 Policy TH 11 Comment<br />
Thetford roads get congested daily now, yet you want to spend<br />
thousands of pounds making it worse. With so many sets of traffic<br />
lights under your scheme, it will be a continuous queue of traffic stopstart.<br />
If you've got so much money to improve this town then start by<br />
giving the town a good decent shopping centre that will encourage<br />
people to shop locally instead of going further afield.<br />
Transport evidence identifies that signalisation is a mechanism<br />
to ensure junctions work at peak periods. In principle it is<br />
No further action.<br />
The A11 junctions should be upgraded to fly over for the main trunk acceptable to the highways agency. The plan is to 2026 during<br />
road. Joining traffic should be by adequately long enough slip roads which time background growth on its own would result in issues<br />
(unlike Croxton Road junctions). Traffic lights are a non starter - we on the trunk road. Look at most cost effective way of getting the<br />
need to keep the flow of traffic. most out of junctions<br />
No further action.