NOT TO BE PRINTED_Draft Final TAAP comments duly
NOT TO BE PRINTED_Draft Final TAAP comments duly
NOT TO BE PRINTED_Draft Final TAAP comments duly
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Mr Stephen<br />
Faulkner<br />
Mr Stephen<br />
Faulkner<br />
Norfolk County<br />
Council Norwich 16 Policy TH 17 Comment<br />
Norfolk County<br />
Council Norwich 16 Policy TH 17 Comment<br />
Mr Stuart Wilson Thetford 16 Policy TH 17 Comment<br />
Mr Stuart Wilson Thetford Society Thetford 16 Policy TH 17 Comment<br />
Mrs Janet Smith<br />
Gibbons Thetford 16 Policy TH 17 Agree<br />
Mrs Patricia Poel Thetford 16 Policy TH 17 Comment<br />
Sustrans Peterborough 16 Policy TH 17 Disagree<br />
Velda Luckhurst Thetford 16 Policy TH 17 Comment<br />
With regard to the Policy TH.17 (Education Provision in the Thetford<br />
Urban Extension), there is no reference to developer funding, which<br />
is considered a significant oversight. While Policy TH.17 sets out<br />
clearly what education provision is required, it fails to indicate that<br />
such provision will need to be developer-funded either through CIL or<br />
planning obligations. Other policies referring to infrastructure<br />
provision, such as TH. 8 (Buses); and TH.23 (Transport - achieving<br />
modal shift) indicate, inter alia , that the provision of the<br />
infrastructure "will be funded through CIL...or direct provision through<br />
a legal agreement...". Therefore to avoid any soundness issues<br />
being raised in relation to education provision the following should be<br />
added to the end of Policy TH.17: "The provision of education<br />
facilities, including land, made necessary by the above urban<br />
extension will be funded from the new development either by CIL or<br />
directly through a S106 legal agreement to the satisfaction of the Agree to some extent, however developer contributions for<br />
Education Authority and the Academy."<br />
education is covered off in CP4 of the Core Strategy.<br />
Consistency will be checked and<br />
improved.<br />
Replace existing text in (b) Secondary School to: "An additional 6.0<br />
ha of land (to the north of Joe Blunt's Lane, should be set aside in Query this. At a meeting at the end of 2010 it was apparent that<br />
the Urban Extension to allow for expansion of the Academy (North if the preferred option for the approach to education in Thetford<br />
site) (Formerly Rosemary Musker High School) if the Sponsors was to have all on one site, an additional 9.5Ha of land would be<br />
decide that this is the preferred location for the Academy, which they required, hence the approach in the <strong>TAAP</strong> of allocating 3.5 to<br />
now wish to develop on a single-site school for up to 2,600 students 9.5 Ha of land. Further discussions have explained change in Refresh education section in liaison<br />
by 2026."<br />
I would hope that in the case of Primary Schools the principle that<br />
new schools are local to the population should be maintained and<br />
that new schools are not built to the detriment of existing successful<br />
position.<br />
with NCC.<br />
schools. Comment noted. Pass on <strong>comments</strong> to NCC<br />
We would hope that in the case of Primary Schools the principle that<br />
new schools are local to the population should be maintained and<br />
that new schools are not built to the detriment of existing successful<br />
schools. Comment noted. Pass on <strong>comments</strong> to NCC<br />
I understand that a decision has been made not to site the new<br />
Forum/Academy in the town centre. I believe this is the right<br />
decision; however I doubt that the proposed new location will be<br />
easily accessible by foot for many people.<br />
Will encroach on Parish Boundaries - will the boundaries be realigned?<br />
Do not agree that the clause on access is adequate. Schools and<br />
educational sites have to be designed and managed to minimise car<br />
use. We suggest: Proposals for new or extended schools and<br />
educational sites will be expected to demonstrate how the site will be<br />
designed and managed to ensure that a significant majority of the<br />
workforce and clientele access the site safely and conveniently on<br />
foot, by cycle or by public transport. Agree.<br />
With the announcement that the Academy will move to one site by<br />
2013, now the Anchor site not to be used, what provision will be<br />
made for the ever increasing number of 16 year olds in the future on<br />
the new build site. Why is it not possible to extend the existing<br />
schools instead of one building too far away from one side of the<br />
town therefore involving costs for fuel and excess carbon. What<br />
about their playing fields. We cannot afford to lost any more. Will<br />
the new site accommodate playing fields - will it be built equidistant<br />
between north and south of the town?<br />
Noted. Partners are aware of the key aim of the <strong>TAAP</strong> - that of<br />
modal shift which applies to all journey types, including the<br />
school run. Any changes to the education establishments, such<br />
as co locating the academy on one site, will trigger the need for<br />
a school travel plan. Whilst walking from one side of the town to<br />
the other for some might be too far to walk, cycling would be a<br />
convenient mode of travel and so too would buses. Pass <strong>comments</strong> on to NCC.<br />
Comments re administrative boundaries noted. Comments to<br />
be passed to BDC's democratic services. No further action for<br />
the <strong>TAAP</strong> as it is not the document to address administrative<br />
boundaries.<br />
Pass <strong>comments</strong> to democratic<br />
services. No further action for the<br />
<strong>TAAP</strong>.<br />
Include suggested change in policy<br />
in order to emphasise the<br />
importance of modal shift in the<br />
town.<br />
The option being investigated at the time of writing is that of no<br />
central facility and relocating all secondary education offer to the<br />
north of the town, adjoined to and including the Academy North<br />
Site. Discussions are ongoing with education experts about the<br />
required land. The adequate provision of sports fields will be<br />
included in the discussions on land requirement. Pass on <strong>comments</strong> to NCC.