Map ID # 89 DRI # 4-8687-73 Project Name(s) Citygate Commerce Park<br />
Location(s) Collier County<br />
Monitoring Report Required<br />
Applicant<br />
Citizens & Southern Trust Company<br />
N/A<br />
Citygate Development LLC<br />
Gary Butler<br />
159 South Main Street<br />
Akron, OH 44308<br />
Hole Montes<br />
Robert L. Duane, AICP<br />
950 Encore Way<br />
Naples, FL 34110<br />
Housing Units<br />
Contact<br />
0<br />
Joseph R. Weber<br />
Action<br />
Owner<br />
159 S. Main Street, Suite 530<br />
Akron, Ohio 44308<br />
William R. Vines, AICP<br />
800 Harbour Drive<br />
Naples, FL 34103<br />
Commercial Sq Ft<br />
Hotel Rooms<br />
Agent<br />
Conditional Approval<br />
90000<br />
Office Sq Ft 836000 Industrial Sq Ft 1920000<br />
Hospital Beds<br />
0<br />
Wet Slips 0 Dry Slips 0<br />
Others<br />
Current Project Status<br />
Developer<br />
Development Status<br />
Next Monitoring Report Due Date 12/30/2005<br />
Ongoing<br />
Vines and Associates<br />
APPROVED PROJECT INFORMATION (As Of): 05/23/2000<br />
Current Approved Resolution DO 2000-02/ Res 2000-151<br />
RCW habitat preservation and a RCW Master Plan.<br />
Commencement Dat<br />
250<br />
ReportingPeriod <strong>of</strong> MostRecent Monitoring Report<br />
10/28/2002<br />
RPC Review<br />
Date Submitte 4/15/1987 Date Reviewed 10/20/1988<br />
Reviewed by SWFRPC Recommendatio Conditional Approval<br />
Regional Issues<br />
Drainage/Water Quality, Energy, Transportation, Vegetation and<br />
Wildlife/Wetland, Wastewater Management<br />
DEVELOPMENT ORDER - INFORMATION<br />
No Appeal<br />
DRI - ADA INFORMATION<br />
Date DO Issued<br />
01/01/2004 - 12/01/2004<br />
Current Buildout Date 2012<br />
Project Type Multi-Use Total Acres 287<br />
PROJECT CONSTRUCTED TO DATE (As Of): 12/01/2004<br />
12/13/1988<br />
Housing Units 0 Commercial Sq Ft 0<br />
Office Sq Ft 0 Industrial Sq Ft 0<br />
Hospital Beds 0 Hotel Rooms 0<br />
Wet Slips 0 Dry Slips 0<br />
Citygate DO 2000-2 (Res 2000-151) provides that significant physical development must begin by Oct 28, 2002. Utilities installation, which constitutes significant physical<br />
development, was commenced on Sep 24, 2002, thereby accommodating development initiation and vesting the Citygate project. As <strong>of</strong> the 12/01/2004 report, no new construction<br />
commenced.<br />
Recent Modifications In 2000, Collier County approved the development order 2000-03, which amended the phasing schedule and extended the project's build out date to 2012. Collier County's<br />
expansion <strong>of</strong> the water plant facility that Citygate surrounds has resulted in the relocation <strong>of</strong> Lake Boulevard, the extension <strong>of</strong> a County sewer main into Citygate, and the acquisition<br />
<strong>of</strong> five easements from Citygate for well fields etc.<br />
Others<br />
Termination Date<br />
(Most Recent Monitoring Report Submital)<br />
Phase I is complete and Phase II is pending<br />
Page 89 <strong>of</strong> 185<br />
2005 Annual DRI Monitoring Report Last Updated: 09/01/2005