developments of regional developments of regional - Southwest ...
developments of regional developments of regional - Southwest ...
developments of regional developments of regional - Southwest ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Map ID # 112 DRI # 8-8889-96 Project Name(s) SW Florida International Airport Substantial Deviation I Location(s) Lee County<br />
Monitoring Report Required<br />
Applicant<br />
Lee County Board <strong>of</strong> County Commissioners<br />
PO Box 398<br />
Fort Myers, FL 33902-0398<br />
Lee County Port Authority<br />
William B. Horner, AICP<br />
Fort Myers, FL 33913-8899<br />
Housing Units<br />
Contact<br />
0<br />
Lee County Port Authority<br />
PO Box 398<br />
Fort Myers, FL 33902-0398<br />
William B. Horner, AICP<br />
Action<br />
Commercial Sq Ft<br />
Hotel Rooms<br />
Owner<br />
Agent<br />
16000 Chamberlin Parkway, Suite 8671<br />
Fort Myers, FL 33913-8899<br />
Conditional Approval<br />
609700<br />
Office Sq Ft 0 Industrial Sq Ft 0<br />
Hospital Beds<br />
Wet Slips 0 Dry Slips 0<br />
Others<br />
Current Project Status<br />
Developer<br />
16000 Chamberlin Parkway Suite 8671<br />
Fort Myers, FL 33913-8899<br />
Lee County Port Authority<br />
16000 Chamberlin Parkway Suite 8671<br />
Development Status<br />
APPROVED PROJECT INFORMATION (As Of):<br />
Current Approved Resolution<br />
0<br />
Airport Expansion<br />
Next Monitoring Report Due Date<br />
4th Amendment<br />
Lee County Port Authority<br />
Commencement Dat<br />
Exempted - See Substantial Deviation II<br />
0<br />
ReportingPeriod <strong>of</strong> MostRecent Monitoring Report<br />
RPC Review<br />
Date Submitte 8/29/1989 Date Reviewed 1/18/1990<br />
Reviewed by SWFRPC Recommendatio Conditional Approval<br />
Regional Issues<br />
Drainage and Water Quality, Energy, Vegetation and Wildlife, Wetlands,<br />
Transportation, and Consistency with the Local Comprehensive Plan<br />
DEVELOPMENT ORDER - INFORMATION<br />
Accepted DO<br />
DRI - ADA INFORMATION<br />
Date DO Issued<br />
N/A, See ID #119<br />
Current Buildout Date 1997<br />
Project Type Airport Expansion Total Acres 13575<br />
PROJECT CONSTRUCTED TO DATE (As Of): 12/31/2002<br />
Approved for an 8,400-ft. commercial jet runway and taxiway, a 3,700-ft. general aviation runway and connecting taxiways, a 28-gate terminal, an air cargo facility, ramps, related<br />
roadway system, drainage, and a rental car service area.<br />
Recent Modifications The original project is ID #23 and substantial deviation II is ID #119. The Lee County Port Authority is in the process <strong>of</strong> completing the Airport Master Plan Update. An application to<br />
amend the Lee County Comp Plan to include the Airport Master Plan Update will be submitted ASAP. The Lee Plan amendment, when approved, will be consistent with the<br />
requirements <strong>of</strong> CS/HB 261, and the DRI for the airport will formally be abandoned.<br />
5/14/1990<br />
Housing Units 0 Commercial Sq Ft 380,915<br />
Office Sq Ft 0 Industrial Sq Ft 0<br />
Hospital Beds 0 Hotel Rooms 0<br />
Wet Slips 0 Dry Slips 0<br />
Others<br />
Termination Date<br />
(Most Recent Monitoring Report Submital)<br />
Page 112 <strong>of</strong> 185<br />
2005 Annual DRI Monitoring Report Last Updated: 09/01/2005