08.04.2013 Views

developments of regional developments of regional - Southwest ...

developments of regional developments of regional - Southwest ...

developments of regional developments of regional - Southwest ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Map ID # 158 DRI # 11-9798-142 Project Name(s) Miromar Lakes<br />

Location(s) Lee County<br />

Monitoring Report Required<br />

Alico, Incorporated<br />

Post Office Box 338<br />

LaBelle, FL 33935<br />

Michael B. Elgin<br />

Miromar Lakes LLC<br />

24870 Burnt Pine Drive<br />

Bonita Springs, FL 34134<br />

Housing Units<br />

Applicant<br />

Contact<br />

2600<br />

Alico, Incorporated<br />

Post Office Box 338<br />

LaBelle, FL 33935<br />

Richard Klaas<br />

8889 Pelican Bay Boulevard<br />

Naples, FL 34240-8414<br />

Action<br />

Commercial Sq Ft<br />

Hotel Rooms<br />

Owner<br />

Agent<br />

Conditional Approval<br />

250000<br />

Office Sq Ft 340000 Industrial Sq Ft 40000<br />

Hospital Beds<br />

Wet Slips 250 Dry Slips 400<br />

Others<br />

Current Project Status<br />

Recent Modifications<br />

Developer<br />

Development Status<br />

APPROVED PROJECT INFORMATION (As Of): 12/15/2003<br />

Current Approved Resolution<br />

0<br />

Next Monitoring Report Due Date 11/29/2004<br />

Ongoing<br />

Second Development Order<br />

Commencement Dat<br />

450<br />

312 acres <strong>of</strong> lakes/buffers and recreation; a minimum <strong>of</strong> 338 acres <strong>of</strong><br />

conservation lands; 18 holes <strong>of</strong> golf; research and development (included<br />

in the Industrial Sq. Ft. category above).<br />

ReportingPeriod <strong>of</strong> MostRecent Monitoring Report<br />

RPC Review<br />

Date Submitte 11/10/1997 Date Reviewed 12/17/1998<br />

Reviewed by SWFRPC Recommendatio Conditional Approval<br />

Regional Issues<br />

Affordable Housing, Energy, Storm water/Wastewater Management,<br />

Transportation, Vegetation and Wildlife/Wetlands management,<br />

Transportation, Vegetation and Wildlife/Wetlands, Wastewater<br />

Management/Water Supply, Consistency with Local and Regional Plans<br />

DEVELOPMENT ORDER - INFORMATION<br />

Accepted DO<br />

DRI - ADA INFORMATION<br />

Date DO Issued<br />

Current Buildout Date 12/31/2009<br />

Project Type Residential/Mixed Use Total Acres 1806<br />

A Second Development Order was adopted by the Lee BoCC on Dec 10, 2003, which added approximately 534 acres <strong>of</strong> land and 400 dry slips. It also increased the acreage <strong>of</strong><br />

lakes/buffers and recreation and raised the minimum level <strong>of</strong> conservation lands.<br />

Miromar Lakes is a portion <strong>of</strong> the original Alico, Incorporated AMDA site (ID #124), which was withdrawn. This project was approved November 29, 1999.<br />

11/29/1999 - 11/29/2003<br />

PROJECT CONSTRUCTED TO DATE (As Of): 11/29/2003<br />

11/29/1999<br />

Housing Units 350 Commercial Sq Ft 0<br />

Office Sq Ft 0 Industrial Sq Ft 0<br />

Hospital Beds 0 Hotel Rooms 0<br />

Wet Slips 0 Dry Slips 0<br />

Others<br />

Termination Date<br />

18-Hole Golf Course<br />

12/31/2014<br />

(Most Recent Monitoring Report Submital)<br />

Page 158 <strong>of</strong> 185<br />

2005 Annual DRI Monitoring Report Last Updated: 09/01/2005

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!