developments of regional developments of regional - Southwest ...
developments of regional developments of regional - Southwest ...
developments of regional developments of regional - Southwest ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Map ID # 116 DRI # 3-8990-100 Project Name(s) Pineland Marina/Lee County Boat Ramp<br />
Location(s) Lee County<br />
Monitoring Report Required<br />
Applicant<br />
Lee County & Pineland Holdings, Inc.<br />
P.O. Box 200<br />
Pineland, FL 33945<br />
Harry Lowell<br />
N/A<br />
Housing Units<br />
Contact<br />
0<br />
Pineland Holdings, Inc.<br />
P.O. Box 200<br />
Pineland, FL 33945<br />
N/A<br />
N/A<br />
Action<br />
Commercial Sq Ft<br />
Owner<br />
Agent<br />
Unknown Status<br />
Office Sq Ft 0 Industrial Sq Ft 0<br />
Hospital Beds<br />
Hotel Rooms<br />
3500<br />
Wet Slips 55 Dry Slips 452<br />
Others<br />
Current Project Status<br />
Recent Modifications<br />
Developer<br />
Development Status<br />
APPROVED PROJECT INFORMATION (As Of):<br />
Current Approved Resolution<br />
0<br />
Boat Ramp/Ship Store<br />
Next Monitoring Report Due Date<br />
Project Withdrawn<br />
Withdrawn<br />
Commencement Dat<br />
0<br />
ReportingPeriod <strong>of</strong> MostRecent Monitoring Report<br />
RPC Review<br />
Date Submitte 3/9/1990 Date Reviewed 5/20/1993<br />
Reviewed by SWFRPC Recommendatio Conditional Approval<br />
Regional Issues<br />
Storm water Management, Emergency Oil Spill Center, Energy, Hurricane<br />
Protection, Marina/Marine & Terrestrial Vegetation & Wildlife, Solid Waste,<br />
Consistency with Local, Regional and State Comprehensive Plans<br />
DEVELOPMENT ORDER - INFORMATION<br />
Unknown Status<br />
DRI - ADA INFORMATION<br />
Date DO Issued<br />
N/A, project withdrawn<br />
Current Buildout Date 1995<br />
Project Type Marina/Boat ramp Total Acres 17<br />
PROJECT CONSTRUCTED TO DATE (As Of):<br />
Housing Units 0 Commercial Sq Ft 0<br />
Office Sq Ft 0 Industrial Sq Ft 0<br />
Hospital Beds 0 Hotel Rooms 0<br />
Wet Slips 0 Dry Slips 0<br />
Others<br />
Termination Date<br />
(Most Recent Monitoring Report Submital)<br />
in 1993, Lee County withdrew its participation in the development application, prompting a lawsuit by the private developer. Private developer claims a breach <strong>of</strong> contract as the<br />
cause <strong>of</strong> action. The DRI will never be developed as originally stated within the application, however, a non-DRI marina facility exists onsite.<br />
During the development order review period, the Lee County Board <strong>of</strong> County Commissioners decided to withdraw from the DRI process. The marina owner then sued the County for<br />
a breach <strong>of</strong> contract.<br />
Page 116 <strong>of</strong> 185<br />
2005 Annual DRI Monitoring Report Last Updated: 09/01/2005