08.04.2013 Views

developments of regional developments of regional - Southwest ...

developments of regional developments of regional - Southwest ...

developments of regional developments of regional - Southwest ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Map ID # 69 DRI # 3-8485-52 Project Name(s) Boardwalk Caper<br />

Location(s) Lee County<br />

Monitoring Report Required<br />

Applicant<br />

The Boardwalk Caper, Limited<br />

N/A<br />

The Caper Corporation<br />

Walter Pancoe<br />

Chicago, IL 60611<br />

Housing Units<br />

Contact<br />

338<br />

The Caper Corporation<br />

Action<br />

Owner<br />

One East Erie Street Suite 225<br />

Chicago, IL 60611<br />

N/A<br />

N/A<br />

Commercial Sq Ft<br />

Agent<br />

Conditional Approval<br />

Office Sq Ft 0 Industrial Sq Ft 0<br />

Hospital Beds<br />

Hotel Rooms<br />

Wet Slips 254 Dry Slips 0<br />

Others<br />

Current Project Status<br />

Developer<br />

One East Erie Street Suite 225<br />

Development Status<br />

APPROVED PROJECT INFORMATION (As Of): 05/26/1987<br />

Current Approved Resolution<br />

0<br />

Next Monitoring Report Due Date<br />

first amendment<br />

50 <strong>of</strong> the slips are in a boat basin<br />

Built Out<br />

Commencement Dat<br />

14025<br />

0<br />

ReportingPeriod <strong>of</strong> MostRecent Monitoring Report<br />

05/26/1989<br />

RPC Review<br />

Date Submitte 3/19/1985 Date Reviewed 12/19/1985<br />

Reviewed by SWFRPC Recommendatio Conditional Approval<br />

Regional Issues<br />

Drainage/Water Quality, Floodplain/Hurricane Evacuation, Marine Facilities,<br />

Transportation, Wetlands, and Wastewater<br />

DEVELOPMENT ORDER - INFORMATION<br />

Appealed/Settled on 6/8/<br />

N/A, project is substantially built out<br />

DRI - ADA INFORMATION<br />

Date DO Issued<br />

Current Buildout Date 5/26/1996<br />

Project Type Multi-Use Total Acres 33<br />

PROJECT CONSTRUCTED TO DATE (As Of): 08/15/1994<br />

Housing Units 300 Commercial Sq Ft 0<br />

Office Sq Ft 0 Industrial Sq Ft 0<br />

Hospital Beds 0 Hotel Rooms 0<br />

Wet Slips 0 Dry Slips 0<br />

In 1995, this project was reported as built out at 300 units. The remaining units will not be built because Florida Department <strong>of</strong> Transportation has acquired a portion <strong>of</strong> the property<br />

for road widening. A portion <strong>of</strong> the commercial property could still be constructed and has been sold to W.B. and H. D. Corp.<br />

Recent Modifications The widening <strong>of</strong> San Carlos Boulevard prohibited building any additional units on undeveloped land. All conditions <strong>of</strong> the DRI have been completed and satisfied<br />

Others<br />

Termination Date<br />

05/26/1997<br />

(Most Recent Monitoring Report Submital)<br />

Page 69 <strong>of</strong> 185<br />

2005 Annual DRI Monitoring Report Last Updated: 09/01/2005

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!