developments of regional developments of regional - Southwest ...
developments of regional developments of regional - Southwest ...
developments of regional developments of regional - Southwest ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Map ID # 159 DRI # 3-9798-143 Project Name(s) Palmer Ranch Increment XIII/Glenridge ACLF<br />
Location(s)<br />
Monitoring Report Required<br />
Applicant<br />
Palmer Ranch Development, Limited<br />
8588 Potter Park Drive Suite 500<br />
Sarasota, FL 34238<br />
Cindy Steele<br />
Sarasota, FL 34238<br />
Housing Units<br />
Contact<br />
360<br />
Action<br />
Owner<br />
Palmer Ranch Development, Limited<br />
8588 Potter Park Drive Suite 500<br />
Sarasota, FL 34238<br />
Commercial Sq Ft<br />
James A. Paulmann, AICP<br />
Agent<br />
6900 Pr<strong>of</strong>essional Parkway East, Suite 100<br />
Sarasota, FL 34240-8414<br />
Conditional Approval<br />
Office Sq Ft 0 Industrial Sq Ft 0<br />
Hospital Beds<br />
Hotel Rooms<br />
Wet Slips 0 Dry Slips 0<br />
Others<br />
Current Project Status<br />
Recent Modifications<br />
Developer<br />
Palmer Ranch Development, Limited<br />
8588 Potter Park Drive, Suite 500<br />
Development Status<br />
APPROVED PROJECT INFORMATION (As Of):<br />
Current Approved Resolution<br />
0<br />
Nursing Facility<br />
Next Monitoring Report Due Date 12/18/2005<br />
Ongoing<br />
Wilson Miller, Inc<br />
Commencement Dat<br />
0<br />
0<br />
RPC Review<br />
Sarasota County<br />
Date Submitte 3/4/1998 Date Reviewed 8/20/1998<br />
Reviewed by SWFRPC Recommendatio Conditional Approval<br />
Regional Issues<br />
Transportation, Consistency with Local Comprehensive Plan and General<br />
Considerations<br />
Accepted DO<br />
Date DO Issued<br />
Current Buildout Date 2002<br />
Project Type Residential Total Acres 90<br />
Increment XIII is the thirteenth increment <strong>of</strong> the Palmer Ranch Master DRI (ID #48) and the eighth increment in the Palmer Ranch "Eastside" Area (ID #122). As <strong>of</strong> May 5, 2000,<br />
development had not begun, but 350 units had been platted. The DRI is approved as a retirement facility.<br />
No requests for substantial deviations were filed for this reporting year.<br />
ReportingPeriod <strong>of</strong> MostRecent Monitoring Report<br />
DEVELOPMENT ORDER - INFORMATION<br />
12/31/2001 - 12/31/2002<br />
DRI - ADA INFORMATION<br />
PROJECT CONSTRUCTED TO DATE (As Of): 05/27/2002<br />
Housing Units 350 Commercial Sq Ft 0<br />
Office Sq Ft 0 Industrial Sq Ft 0<br />
Hospital Beds 0 Hotel Rooms 0<br />
Wet Slips 0 Dry Slips 0<br />
Others<br />
Termination Date<br />
(Most Recent Monitoring Report Submital)<br />
All 350 units are ACLF<br />
Page 159 <strong>of</strong> 185<br />
2005 Annual DRI Monitoring Report Last Updated: 09/01/2005