Ambergris Caye Belize Resort Development - Department of ...
Ambergris Caye Belize Resort Development - Department of ...
Ambergris Caye Belize Resort Development - Department of ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
6.0 ENERGY GENERATION<br />
6.1 Energy Demand<br />
Chapter 6<br />
The ABR project will consist <strong>of</strong> a tourism sector and a residential sector. Both sectors will<br />
target tourism visitors, both local and international, as well as retired full time and part<br />
time residential inhabitants. The tourism sector comprises mainly <strong>of</strong> different size condos<br />
and villas, and amenities such as Restaurants, Retail shops and the Ecological Cultural<br />
Center. These facilities at full operation will require an overall constant, adequate and<br />
reliable source <strong>of</strong> energy.<br />
The energy requirements <strong>of</strong> this project are expected to be mainly for domestic and semicommercial<br />
purposes. Industrial activity, if any will be limited to the boat storage areas,<br />
construction work, and maintenance activities. The energy requirements are described in<br />
table 6.1. The daily energy demand at full occupancy and operation will be about 13,181<br />
kilowatt hours<br />
Table 6.1 Project Energy Demand<br />
Yearly Energy Daily<br />
Unit Use x Demand<br />
Type Facility Quantity Equivalent (10,000 kwh) (kwh)<br />
A Hotel 56 1.0 560,000 1,556<br />
B Hotel Suites Type A 8 4.0 320,000 889<br />
C Hotel Suites Type B 12 4.5 540,000 1,500<br />
D Water Cabanas 12 3.5 420,000 1,167<br />
E Beach Front Villas 42 2.0 840,000 2,333<br />
F Beach Cottages 12 3.5 420,000 1,167<br />
G Apartments 22 3.5 770,000 2,139<br />
H Future <strong>Development</strong>s 13 3.5 455,000 1,264<br />
I Owner's Club House 1 3.5 35,000 97<br />
J Employee Housing 1 2.0 20,000 56<br />
K Restaurant and Bars 3 2.5 75,000 208<br />
L Spas Cabanas 6 4.0 240,000 667<br />
M Others (Admin/lighting) 2 2.5 50,000 139<br />
Totals 162 4,745,000 13,181<br />
4,745 MWh 13.181 MWh<br />
* Other facilities include the piers, security equipments, road side and walkways illuminations etc.<br />
A typical hotel, villa and cottage designs were used to calculate the energy requirements<br />
for the project. As well, it is assume that the energy use includes lighting and the use <strong>of</strong><br />
common domestic appliances. It is estimated that there will be a demand <strong>of</strong> about 200 kwh<br />
- 400 kwh during construction <strong>of</strong> the project. All <strong>of</strong> the energy demand will be gotten from<br />
a portable gas powered generator.<br />
6-1