09.04.2013 Views

Ambergris Caye Belize Resort Development - Department of ...

Ambergris Caye Belize Resort Development - Department of ...

Ambergris Caye Belize Resort Development - Department of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6.0 ENERGY GENERATION<br />

6.1 Energy Demand<br />

Chapter 6<br />

The ABR project will consist <strong>of</strong> a tourism sector and a residential sector. Both sectors will<br />

target tourism visitors, both local and international, as well as retired full time and part<br />

time residential inhabitants. The tourism sector comprises mainly <strong>of</strong> different size condos<br />

and villas, and amenities such as Restaurants, Retail shops and the Ecological Cultural<br />

Center. These facilities at full operation will require an overall constant, adequate and<br />

reliable source <strong>of</strong> energy.<br />

The energy requirements <strong>of</strong> this project are expected to be mainly for domestic and semicommercial<br />

purposes. Industrial activity, if any will be limited to the boat storage areas,<br />

construction work, and maintenance activities. The energy requirements are described in<br />

table 6.1. The daily energy demand at full occupancy and operation will be about 13,181<br />

kilowatt hours<br />

Table 6.1 Project Energy Demand<br />

Yearly Energy Daily<br />

Unit Use x Demand<br />

Type Facility Quantity Equivalent (10,000 kwh) (kwh)<br />

A Hotel 56 1.0 560,000 1,556<br />

B Hotel Suites Type A 8 4.0 320,000 889<br />

C Hotel Suites Type B 12 4.5 540,000 1,500<br />

D Water Cabanas 12 3.5 420,000 1,167<br />

E Beach Front Villas 42 2.0 840,000 2,333<br />

F Beach Cottages 12 3.5 420,000 1,167<br />

G Apartments 22 3.5 770,000 2,139<br />

H Future <strong>Development</strong>s 13 3.5 455,000 1,264<br />

I Owner's Club House 1 3.5 35,000 97<br />

J Employee Housing 1 2.0 20,000 56<br />

K Restaurant and Bars 3 2.5 75,000 208<br />

L Spas Cabanas 6 4.0 240,000 667<br />

M Others (Admin/lighting) 2 2.5 50,000 139<br />

Totals 162 4,745,000 13,181<br />

4,745 MWh 13.181 MWh<br />

* Other facilities include the piers, security equipments, road side and walkways illuminations etc.<br />

A typical hotel, villa and cottage designs were used to calculate the energy requirements<br />

for the project. As well, it is assume that the energy use includes lighting and the use <strong>of</strong><br />

common domestic appliances. It is estimated that there will be a demand <strong>of</strong> about 200 kwh<br />

- 400 kwh during construction <strong>of</strong> the project. All <strong>of</strong> the energy demand will be gotten from<br />

a portable gas powered generator.<br />

6-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!