Category <strong>of</strong> Project Activity<br />
Existing and Proposed<br />
Activities<br />
Table 10.2 ABR Social Impact Summary<br />
Potential Impacts Recommended Mitigation Measures<br />
- Location and size <strong>of</strong> project and existing<br />
uses<br />
- Access to the area by traditional users<br />
- Ability <strong>of</strong> traditional users to adopt to<br />
change<br />
- Increase usage <strong>of</strong> the area <strong>of</strong><br />
development by new comers<br />
Marine Traffic - Impact on traditional users to the area<br />
- Increase number <strong>of</strong> users and marine<br />
vessels to the area<br />
- Impact on natural environment by<br />
increased boat usage<br />
- safety for traditional users and other<br />
users<br />
10-17<br />
- All development activities scheduled so as not<br />
to obstruct existing uses and future activities <strong>of</strong><br />
the area<br />
- traditional users continue to have access to<br />
areas <strong>of</strong> traditional uses<br />
- planned dredging activities avoid areas <strong>of</strong><br />
traditional use by fishermen<br />
- traditional users flexible to new owner<br />
proposed activities during and after completion<br />
<strong>of</strong> project development<br />
- development planned so as not to impact on<br />
traditional user areas and activities<br />
- machinery and equipment be maintained<br />
- the Developer and staff should be advised <strong>of</strong><br />
areas <strong>of</strong> traditional uses<br />
- the movement <strong>of</strong> marine vessels to the area<br />
should be scheduled<br />
- all watercraft activities be regulated and<br />
designated markers in places in special impact<br />
areas<br />
- workers be transported to and from the site to<br />
their respective areas during all phases <strong>of</strong><br />
construction<br />
- safe and secure mooring <strong>of</strong> craft, when <strong>of</strong>floading<br />
materials and equipment at docking<br />
facility<br />
- all watercraft activities be monitored and<br />
regulated<br />
- Marine traffic through and near the area be<br />
regulated; buoys and markers should be fitted to<br />
facilitate day and night vessels in the area<br />
- Hazardous areas and areas <strong>of</strong> specific<br />
importance be demarcated<br />
Residual Impacts Magnitude<br />
Direction/Duration/Scope<br />
- High/positive/decade/local/ long<br />
- High/positive/decade/local/ long<br />
- High/positive/decade/local/ long<br />
- High/positive/decade/local/ long<br />
- High/positive/decade/local/ long<br />
- High/medium/months/local<br />
- High/positive/decade/local/ long<br />
- High/positive/decade/local/ long<br />
- High/positive/decade/local/ long<br />
- High/positive/decade/local/ long<br />
- High/positive/decade/local/ long<br />
- High/positive/decade/local/ long<br />
- High/positive/decade/local/ long<br />
- High/positive/decade/local/ long<br />
- High/positive/decade/local/ long<br />
- High/positive/decade/local/ long