09.04.2013 Views

Ambergris Caye Belize Resort Development - Department of ...

Ambergris Caye Belize Resort Development - Department of ...

Ambergris Caye Belize Resort Development - Department of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Development</strong><br />

Activity<br />

Primary Impacts<br />

or Environmental<br />

Disturbance<br />

Secondary and<br />

Tertiary Level<br />

Environmental<br />

Impacts<br />

11-2<br />

Mitigation<br />

Measures<br />

1a1b. Monitoring<br />

and where<br />

necessary repairing<br />

and/or replacing<br />

leaky pipes and<br />

faulty couplings <strong>of</strong><br />

the spoil discharge<br />

pipes.<br />

1a1c. Applying<br />

velocity reduction<br />

measures where<br />

spoils are deposited<br />

such as baffles to<br />

precipitate solids<br />

and curtail turbid<br />

influences in<br />

effluent stream.<br />

1a1d. Decrease time<br />

frame over which<br />

the dredging<br />

operation is to take<br />

place, to avoid the<br />

daily re-suspension<br />

<strong>of</strong> sediments.<br />

1a1e. Ameliorate<br />

the impacts <strong>of</strong> the<br />

daily re-suspension<br />

<strong>of</strong> sediments by the<br />

suctioning <strong>of</strong><br />

sediments that have<br />

resettled.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!