Oct - Dec 2009 • Vol. No. 32 Issue No. 2 • - L&T Construction
Oct - Dec 2009 • Vol. No. 32 Issue No. 2 • - L&T Construction
Oct - Dec 2009 • Vol. No. 32 Issue No. 2 • - L&T Construction
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
communication networks enroute are linked to project was to manage the heavy traffic and execute<br />
various service and medical centres for easy the construction activities with utmost safety<br />
access and immediate action. Commuters are also regulations. Through elaborate traffic management<br />
provided with two rest areas including facilities which plan, different teams carried out construction at<br />
houses trauma care units, restaurants, petrol pump remarkable speed without major disturbance to traffic<br />
and garage. Two truck lay bays with wash room and even during the monsoon period.<br />
drinking water facilities provide the much needed<br />
comfort for the truck drivers.<br />
Repetitive overlays on the erstwhile road over the<br />
years had resulted in asphalt crust of thickness<br />
L&T–VBTL designed, engineered, and financed varying from 400 to 700mm. This had to be milled,<br />
this project. <strong>Construction</strong> work was carried out and the milled material was re-used in Wet Mix<br />
by Infrastructure Operating Company - a part Macadan (WMM) and Granular Sub Base (GSB), thus<br />
of L&T’s <strong>Construction</strong> Division. Operations avoiding the problems of space constraint and waste<br />
and maintenance of this hi-tech highway is done accumulation.<br />
by L&T-VBTL.<br />
The CBR of soil was also improved from 2% to 20% by<br />
During execution of the road work, L&T’s way of soil stabilization with lime method for sub-<br />
Infrastructure Operating Company had to meet grade. To ensure good quality of lime (purity > 92%)<br />
several challenges. The main challenge for the<br />
two lime plants had to be installed at site.<br />
Smooth drive on the hi-tech highway