In the crushed coal stockpile, coal will be<br />

carried by trunk conveyor and stacked by<br />

Stacker cum Reclaimer. In the reclaiming<br />

mode, Stacker cum Reclaimer will reclaim coal<br />

from stockpile and will discharge on to trunk<br />

conveyor. Also in case of emergency when<br />

Stacker cum Reclaimer is out of operation and<br />

coal is needed in the bunker from stockpile,<br />

dozers will be used to supplement coal to either<br />

of the 2 Reclaim Hoppers, wherefrom coal can<br />

be fed to the bunkers.<br />

Both the direct path as well as two reclaim paths<br />

will convey the coal to bunker conveyors. Each<br />

of the bunker conveyor is provided with<br />

Travelling Trippers through which the bunkers<br />

of Unit 4 & 5 will be fed.<br />

Track hopper<br />

The track hopper complex is 210m long with a<br />

holding capacity of 4000 t with maintenance bays at<br />

both ends along with erection hatch, staircase, etc.<br />

The live railway lines on one side and ash-water pipe<br />

rake on the other side of the track hopper location<br />

made it very critical for the excavation and<br />

construction activities. In order to tackle the constraint<br />

and to meet the deadline, innovative arrangements<br />

were made to cast 5m high wall at one lift to reduce<br />

the casting time.<br />

ECC Concord <strong>Oct</strong>-<strong>Dec</strong> 09 30<br />

Conveying system<br />

Conveyor Capacity (Rated/ Designed) 1600 tph<br />

Number of Conveyors 25<br />

Belt Speed 3.2 m/ sec<br />

Total length 4.6 km<br />

Belt Width 1400mm<br />

Type of Belt Nylon/ Nylon<br />

Inside view of Track Hopper – during wagon unloading<br />

Building structures<br />

Track Hopper 1 no, 210 m long<br />

Crusher house 1 no<br />

Transfer Points (over ground) 4 nos<br />

Transfer Points (under ground) 4 nos<br />

Reclaim Hopper 2 nos<br />

Electric House 3 nos<br />

Pump house 2 nos<br />

Major quantities<br />

Excavation 54000 cu.m<br />

PCC 4200 cu.m<br />

RCC 30000 cu.m<br />

Shuttering 120000 sq.m<br />

Rebar 4000 t<br />

Structural 3500 t<br />

Sheeting <strong>32</strong>000 sq.m