In the crushed coal stockpile, coal will be<br />
carried by trunk conveyor and stacked by<br />
Stacker cum Reclaimer. In the reclaiming<br />
mode, Stacker cum Reclaimer will reclaim coal<br />
from stockpile and will discharge on to trunk<br />
conveyor. Also in case of emergency when<br />
Stacker cum Reclaimer is out of operation and<br />
coal is needed in the bunker from stockpile,<br />
dozers will be used to supplement coal to either<br />
of the 2 Reclaim Hoppers, wherefrom coal can<br />
be fed to the bunkers.<br />
Both the direct path as well as two reclaim paths<br />
will convey the coal to bunker conveyors. Each<br />
of the bunker conveyor is provided with<br />
Travelling Trippers through which the bunkers<br />
of Unit 4 & 5 will be fed.<br />
Track hopper<br />
The track hopper complex is 210m long with a<br />
holding capacity of 4000 t with maintenance bays at<br />
both ends along with erection hatch, staircase, etc.<br />
The live railway lines on one side and ash-water pipe<br />
rake on the other side of the track hopper location<br />
made it very critical for the excavation and<br />
construction activities. In order to tackle the constraint<br />
and to meet the deadline, innovative arrangements<br />
were made to cast 5m high wall at one lift to reduce<br />
the casting time.<br />
ECC Concord <strong>Oct</strong>-<strong>Dec</strong> 09 30<br />
Conveying system<br />
Conveyor Capacity (Rated/ Designed) 1600 tph<br />
Number of Conveyors 25<br />
Belt Speed 3.2 m/ sec<br />
Total length 4.6 km<br />
Belt Width 1400mm<br />
Type of Belt Nylon/ Nylon<br />
Inside view of Track Hopper – during wagon unloading<br />
Building structures<br />
Track Hopper 1 no, 210 m long<br />
Crusher house 1 no<br />
Transfer Points (over ground) 4 nos<br />
Transfer Points (under ground) 4 nos<br />
Reclaim Hopper 2 nos<br />
Electric House 3 nos<br />
Pump house 2 nos<br />
Major quantities<br />
Excavation 54000 cu.m<br />
PCC 4200 cu.m<br />
RCC 30000 cu.m<br />
Shuttering 120000 sq.m<br />
Rebar 4000 t<br />
Structural 3500 t<br />
Sheeting <strong>32</strong>000 sq.m