etween these two CHPs. The CHP for the Stage III, Major Equipment<br />

awarded to L&T, is also a self sufficient plant, with<br />

dedicated Track Hopper, Crusher House,<br />

conveying system and two Stacker cum<br />

Reclaimers. Interconnection of Phase III with Phase II<br />

is through TP 6 and conveyor 35.<br />

The main Buildings and Equipment of the<br />

package are :<br />

Buildings<br />

Track Hopper : 1 no (210 m long)<br />

Ring Granulators (940 tph) : 4 nos<br />

Stacker cum Reclaimers : 2 nos<br />

(Stacking & Reclaiming 1500 tph)<br />

Paddle Feeders (1125 tph) : 4 nos<br />

Vibrating Grizzly feeders (940 tph) : 4 nos<br />

Elevators (1000 t) : 2 nos<br />

Travelling Trippers (1500 tph) : 4 nos<br />

Crusher House : 1 no Coal sampling units : 2 nos<br />

Transfer Houses : 7 nos The conveying system<br />

Control Rooms : 4 nos Conveyor rated capacity, : 1500 tph<br />

Pump House : 3 nos<br />

guaranteed<br />

Belt Width : 1400 mm<br />

Conveyor length : 5.4 km<br />

<strong>No</strong>. of conveyors : 26 nos<br />

Conveyor Speed : 3.2 m/sec<br />

Belt Type : Nylon / Nylon<br />

Major civil & structural<br />

quantities<br />

Excavation : 1<strong>32</strong>270 cu.m<br />

Concreting : 29520 cu.m<br />

Shuttering : 104<strong>32</strong>5 sq.m<br />

Rebar : 2825 t<br />

Cast in situ piles : 1573 nos<br />

Structural steel : 4700 t<br />

Sheeting : 37000 sq.m<br />