Amphitheatre of 3400 sq. m area for a seating capacity of 650 persons<br />

and security system like VESDA, Inergen gas wasteline. The UPS service component includes UPS<br />

suppression system, Water leak detection system, 4x300 kVA each with 30 minutes backup for<br />

rodent/ repellent system etc.<br />

datacenter, with 15 minutes backup for SDB1<br />

workstation and SDB2 workstation. SDB1 / 2 are<br />

The HVAC services consist of 7 main chillers of 375 TR equipped with 6 passenger lifts (1.5 mps) and one<br />

capacity for Phase 1. Additionally, 70 TR (4 nos), 180 service lift (1 mps), whereas the canteen has 3<br />

TR (4 nos) and 90 TR (2 nos) chillers have been<br />

incorporated for 24x7 system, data centre and SDB2<br />

passenger lifts (1.5 mps) and 2 service lifts (1 mps).<br />

respectively. AHUs of 914 TR, 930 TR capacity and Major machinery deployed included 58 cu.m<br />

756 TR are installed in SDB1, SDB2 and Canteen batching plant, 10 transit mixers, concrete pumps, 3<br />

along with 9000 RM of insulated chilled water tower cranes, Fraco material hoist and Mekaster<br />

piping. The Fire Protection System (FPS) services passenger hoist. The project had a peak asset value<br />

involves hydrant pump, sprinkler pump, stand-by<br />

pump and jockey pump. The Public Health<br />

of 10 crores with monthly hire charges of Rs. 42 lakhs.<br />

Engineering (PHE) services comprise MEPZ water This project won the prestigious “International Safety<br />

supply (approximately 50,000 litres per day), Award” from The British Safety Council for achieving<br />

domestic water supply, flushing water supply, an accident-free record of 10 million safe man hours<br />

domestic water requirement and flushing water which was made possible by effective implementation<br />

treatment, sewage treatment plant of 500 cu.m. per of HSE Management Systems as well as HSE training<br />

day, 11658 RM of GI piping, 9594 RM of soil and imparted to workmen.<br />