Aesthetically designed toll plaza incorporating integrated traffic management systems<br />

For smooth operation of the toll road, Highway<br />

Traffic Management system has been installed, with<br />

the following features:<br />

Emergency call boxes at 2 km intervals,<br />

connected to control room to help road users<br />

during emergency.<br />

Variable Messaging System to convey traffic<br />

conditions and weather forecast to the road<br />

users.<br />

CCTV in junctions and Plaza to check traffic<br />

intensity, blockage, etc.<br />

Meteorological System to collect weather data.<br />

Radio Communication for smooth<br />

monitoring and patrolling.<br />

Automatic Traffic Classifier & Counter for<br />

traffic information which also helps in data<br />

collection for traffic studies in future.<br />

Automated Tolling with French Technology<br />

has been installed with minimum human<br />

interface.<br />

For the purpose of consistency and early<br />

completion, pre-casting was used extensively.<br />

Girders, box segments for culverts, cattle-crossing,<br />

pedestrian underpass, crash barrier with friction<br />

slab, crash barrier over vent, approach slab, deck<br />

slab planks, hume pipes, box drains, etc. were pre-<br />

cast to reduce construction time frames, and to<br />

exercise better quality control.<br />

The picturesque wedge shaped toll plaza,<br />

constructed for the project is an architectural<br />

masterpiece, and an innovative structure<br />

conceptualized for the first time in India.<br />

In line with L&T’s sustainability initiatives,<br />

several CSR activities were carried out during the<br />

course of execution of the project. Initiatives<br />

such as medical welfare and education of school<br />

children were part of these CSR activities.<br />

Mr. Ravi Prakash<br />

Project Manager<br />

19<br />

ECC Concord <strong>Oct</strong>-<strong>Dec</strong> 09