<strong>Construction</strong> of intake Grid Sub Station (GSS) One pipe mill was set up for production of<br />

foundations at strip slope of hill. entire 106 km of pipes for this project<br />

at Phagi due to its strategic location. This<br />

Achieved 93,000 cu.m of concrete and mill helped in the continuos supply of<br />

2,76,000 sq.m shuttering in 21 months. pipes to meet the requirement of the<br />

Dismantling of existing GSS at intake and<br />

commissioning of new 33kV GSS on time.<br />

Out of 76600 t of HR coil 73000 t procured<br />

from China and transported from Mundra Port<br />

to site by road within a period of 3 months.<br />

All buried pipe lines are coated with polyolefin<br />

tape to ensure corrosion resistance throughout<br />

the design life with the help of product procured<br />

from M/s Covalance – USA<br />

All pipe lines have been protected against<br />

corrosion through permanent cathodic<br />

protection system to ensure its designed life<br />

span.<br />

In situ mortar lining was carried out for 106 km<br />

in various dia pipes-2448 mm, 2348 mm, 800<br />

mm & 700 mm to protect corrosion with<br />

minimum C Value of 130<br />

<strong>Construction</strong> of 52 m high surge shaft and four<br />

over head surge tanks<br />

One simple supported MS Bridge of span 25 m<br />

was designed and constructed at IOCL crossing<br />

Raw water transmission main was designed<br />

and constructed over 548 Ring Girders for<br />

carrying the pipe line of 2448 mm dia upto<br />

5.4 km and more than 100 km buried pipe line<br />

to meet requirement of stage two 1020 mld<br />

<strong>Construction</strong> of water treatment plant of<br />

400 mld capacity with 9 pulsators clarifier<br />

and 18 twin bed filters, which is the heart of<br />

the system.<br />

execution team.<br />

Clear Water Reservoir & Pump House<br />

Parameters<br />

Clear Water Reservoir : 1<br />

Size : 98m X 56 m X 4.8 m<br />

Capacity of Reservoir : 25 ML<br />

Material of<br />

<strong>Construction</strong> : RCC<br />

Free Board : 500mm<br />

Pump House : 1<br />

Size : 105 m X 20 m X 15 m<br />

<strong>No</strong> of Pumps : 8 nos Horizontal Split<br />

Casing Pumps for<br />

Jaipur<br />

Capacity : 2800 cu.m/hr ,<br />

Head 42 m<br />

2 nos Horizontal Split<br />

casing Pumps for<br />

Malpura<br />

Capacity : 2600 cu.m/ hr,<br />

Head 42m<br />

Crane : 1 , 10 Mt Double Girder<br />

EOT Crane<br />

Concrete : 9040 cu.m<br />

Formwork : 27700 sq.m<br />

Reinforcement : 770 t<br />

23<br />