Title: Approval of an Agreement Awarding Bid to Oglesby Construction, Inc. for Installation<br />

and Maintenance of Striping and Pavement Markings<br />

September 11, 2012<br />

Page 2<br />

Report and Discussion<br />

Background:<br />

As part of the County’s Resurfacing Program, the Leon County Public Works, Division of<br />

Engineering Services is responsible for the installation of striping and pavement markings on<br />

newly resurfaced County Maintained Arterial Roads. Additionally, as part of paved road<br />

maintenance, the Leon County Public Works, Division of Operations is responsible for<br />

maintenance of striping and pavement markings on the County’s Arterial and Collector Roads.<br />

In FY 2005/06, the Division of Operations joined with the Division of Engineering Services in<br />

performing its striping and pavement marking activities through contractual services. Over the<br />

life of this contract, an average of $390,000 has been spent annually.<br />

Analysis:<br />

In an effort to increase efficiency, it was determined that a joint contract to serve both the<br />

Divisions of Engineering Services and Operations was the best approach. A bid (number BC-07-<br />

17-12-50) was advertised locally and 396 vendors were notified through the automated<br />

procurement system. A total of 16 vendors requested the bid packages, which resulted in four<br />

bids (Attachment #2). Of the four bids received, Oglesby Construction, Inc. was the low bidder<br />

(Attachment #3). Consistent with the targets contained in the Minority, Women and Small<br />

Business Enterprise Policy 96-1, aspirational targets were unreasonable and were not included as<br />

a part of the bid proposal process. However, according to policy, each respondent was strongly<br />

encouraged to secure MBE and WBE participation through the purchase of those goods or<br />

services, from MWSBE's, when opportunities are available.<br />

The Installation and Maintenance of Striping and Pavement Marking Services Contract will be<br />

administered jointly by the Divisions of Engineering Services and Operations. However, each<br />

Division shall be responsible for the management and budgeting of its respective projects. This<br />

is a unit pricing contract, which runs for a period of one year with four additional one-year<br />

extensions. The contract will be utilized, as necessary, for both Operations and Engineering<br />

projects, and will not exceed amounts budgeted annually.<br />

Options:<br />

1. Approve the Agreement Awarding Bid to Oglesby Construction, Inc. for the Installation and<br />

Maintenance of Striping and Pavement Markings and authorize the County Administrator to<br />

execute.<br />

2. Do not approve the Agreement Awarding Bid to Oglesby Construction, Inc. for the<br />

Installation and Maintenance of Striping and Pavement Markings.<br />

3. Board direction.<br />

Recommendation:<br />

Option #1.<br />

Attachments:<br />

1. Agreement with Oglesby Construction, Inc.<br />

2. Striping and Pavement Markings Bid Tabulation Sheet<br />

3. Olgesby’s Bid Document<br />

Page 23 of 282 Posted at 5:00 p.m. on August 31, 2012