- Page 1 and 2:
Athy Integrated Framework Plan for
- Page 3 and 4:
CONTENTS PAGE 1 INTRODUCTION 3 1.1
- Page 5 and 6:
INTRODUCTION Athy IFPLUT Study 1 Fi
- Page 7 and 8:
1 INTRODUCTION 1.1 Purpose of Study
- Page 9 and 10:
1.4 Projected Residential and Emplo
- Page 11 and 12:
1.6 Report Structure The structure
- Page 13 and 14:
REVIEW Strategic Context of Athy Co
- Page 15 and 16:
2 STRATEGIC CONTEXT OF ATHY 2.1 Int
- Page 17 and 18:
Centres (e.g. Athy) within the Hint
- Page 19 and 20:
• More sustainable commuting patt
- Page 21 and 22:
Retail Planning Strategy for the Gr
- Page 23 and 24:
In land use terms it is the aim to
- Page 25 and 26:
Zoning in the town centre is primar
- Page 27 and 28:
2.3 Summary The strategies, plans a
- Page 29 and 30:
The 1996 and 2002 SAPS provide data
- Page 31 and 32:
3.4 Existing Land Use Residential A
- Page 33 and 34:
Heritage Athy is a designated Herit
- Page 35 and 36:
Again, Section 6 below will analyse
- Page 37 and 38:
3.7 Public Transport Services Athy
- Page 39 and 40:
Rail Services Athy is presently ser
- Page 41 and 42:
4.2 Consultation Methodology The de
- Page 43 and 44:
• Opinion varied on the provision
- Page 45 and 46:
PRINCIPLES & OBJECTIVES Athy IFPLUT
- Page 47 and 48:
5 PRINCIPLES AND OBJECTIVES In orde
- Page 49 and 50:
mitigation because inter alia it is
- Page 51 and 52:
Objective 9 Maximise slow mode pene
- Page 53 and 54:
ASSESSMENT Assessment of Future Gro
- Page 55 and 56:
6 ASSESSMENT OF FUTURE GROWTH AND N
- Page 57 and 58:
6.2 Employment Because of the uncer
- Page 59 and 60:
In terms of third level education,
- Page 61 and 62:
7 ALTERNATIVE SCENARIOS 7.1 Introdu
- Page 63 and 64:
7.3 Land Use Scenario B Under Scena
- Page 65 and 66:
7.5 Land Use Scenario D This scenar
- Page 67 and 68:
7.7 Land Use Scenario F Under this
- Page 69 and 70:
Table 8.1: Walking Assessment Thres
- Page 71 and 72:
Objective 2 Develop a compact urban
- Page 73 and 74:
Objective 9 Maximise slow mode pene
- Page 75 and 76: As in Scenario A the additionally r
- Page 77 and 78: Objective 8 Locate low-density empl
- Page 79 and 80: To accommodate the growth to the no
- Page 81 and 82: 8.4 Scenario D As in Scenario C the
- Page 83 and 84: Objective 6 Strategic location of h
- Page 85 and 86: In overall terms Scenario B emerged
- Page 87 and 88: DELIVERY Development of Preferred S
- Page 89 and 90: 9 DEVELOPMENT OF PREFERRED SCENARIO
- Page 91 and 92: Figure 9.1 Preferred Scenario Athy
- Page 93 and 94: Athy IFPLUT Study 89 Final Report D
- Page 95 and 96: Athy IFPLUT Study 91 Final Report D
- Page 97 and 98: The preferred scenario is successfu
- Page 99 and 100: Low to Medium Residential Densities
- Page 101 and 102: Regarding commercial and retail dev
- Page 103 and 104: Triangle Site The Triangle site due
- Page 105 and 106: Objective 9 Maximise slow mode pene
- Page 107 and 108: • Provide access to the major emp
- Page 109 and 110: Open Space, Passive and Active Recr
- Page 111 and 112: 9.4 Traffic Modelling Outputs Three
- Page 113 and 114: Table 9.5: Traffic flows on sensiti
- Page 115 and 116: It should also be noted that the So
- Page 117 and 118: 10 DELIVERY OF THE IFPLUT 10.1 Intr
- Page 119 and 120: development should informed by this
- Page 121 and 122: Athy IFPLUT Study A-ii Final Report
- Page 123 and 124: Obj: Location Measures S6 R417Carlo
- Page 125: Obj: Location Measures M10 Grand Ca
- Page 129 and 130: Table B2: SATURN Assigned traffic F
- Page 131: Athy IFPLUT Study B-vi Final Report