18.07.2013 Views

2020 Vision for Athy - Entire Document - Kildare.ie

2020 Vision for Athy - Entire Document - Kildare.ie

2020 Vision for Athy - Entire Document - Kildare.ie

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

8.3 Scenario C<br />

Under Scenario C the main focus of future residential development is on the east of the town. The sites east of the<br />

railway line amount to approximately 40 hectares. The large site to the north of the town centre comprises 11<br />

hectares and all remaining infill sites in the town centre and in Coneyburrow comprise 15 hectares. The redevelopment<br />

sites in the town centre can accommodate a further hectare <strong>for</strong> residential purposes. In total 67<br />

hectare are projected to be developed <strong>for</strong> housing under Scenario C, 20 hectares less than in Scenario A. 17<br />

hectares of the total will be developed at 50 units per hectare, and 50 hectares at 35 units per hectare.<br />

Future commercial areas are concentrated in the town centre. As under Scenario B the main feature is the redevelopment<br />

of the Triangle and sites along Main Street and the Inner Rel<strong>ie</strong>f Street. While the Triangle contains a<br />

residential component (0.6 hectares) it also accommodates approximately 1.5 hectares <strong>for</strong> retailing and 1 hectare<br />

<strong>for</strong> offices. Within the re-development sites 4 hectares are reserved <strong>for</strong> retailing and 1 hectare <strong>for</strong> offices. The<br />

Convent site in Stanhope Place and the Cinema site can accommodate approximately 2.7 hectares <strong>for</strong> retail use. In<br />

total under Scenario B, approximately 8.2 hectares are available <strong>for</strong> retailing and 2 hectares <strong>for</strong> offices in the town<br />

centre.<br />

Figure 8.10 Scenario C<br />

High-density employment under Scenario C is located on the re-developed sites of Minch-Norton and Tegral sites.<br />

Their present sites are assumed to accommodate 8.5 hectares <strong>for</strong> offices, and 4.5 hectares each <strong>for</strong> industry and<br />

warehousing. An additional site north of the town centre by the canal comprises 1 hectare <strong>for</strong> offices. Low-density<br />

employment predominantly takes place to the southeast of the town, south of the Southern Distributor Road. It is<br />

assumed that Minch-Norton and Tegral relocate to the southeast of the town as well. There is also a small site <strong>for</strong><br />

low-density employment west of the town. In total under Scenario B, 9.5 hectares will be developed <strong>for</strong> offices (in<br />

addition to the office use in the town centre), 28 hectares <strong>for</strong> industry and 20 hectares <strong>for</strong> warehousing.<br />

The additional primary and secondary schools required will be located in the Clonmullion area to the northeast of<br />

the town. All existing schools remain at their present location.<br />

<strong>Athy</strong> IFPLUT Study 74 Final Report December 2004

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!