Objective 11 Create opportunit<strong>ie</strong>s <strong>for</strong> cultural, social, community and passive and active leisure activit<strong>ie</strong>s<br />
that maximise the potential of the existing heritage and amenity.<br />
Scenario D partially compl<strong>ie</strong>s with Objective 11. As with Scenario C the ability to create a sense of place is<br />
somewhat limited because focus of population has shifted towards the railway line. Existing facilit<strong>ie</strong>s like<br />
Geraldine Park can be fully utilised with the bulk of new residential areas being located adjacent to it. This will<br />
aid the integrity of the local community. However in terms of the overall town, access to Geraldine Park from the<br />
west of the town is limited in terms of travel distance.<br />
8.5 Summary<br />
Table 8.2 below, summarises each of the relevant objectives assessed using the walking assessment modelling tool.<br />
Table 8.2: Summary of WALK Assessment Results<br />
Slow Modes to and<br />
from the Town<br />
Centre and Bus<br />
Desirable<br />
threshold<br />
Acceptable<br />
threshold<br />
Location of Schools and Slow Mode<br />
Routes<br />
Stops Primary School Secondary School<br />
Beyond<br />
Acceptable<br />
Compliance<br />
Desirable<br />
threshold<br />
Acceptable<br />
threshold<br />
Beyond<br />
Acceptable<br />
Location of<br />
Residential Areas to<br />
Rail Station<br />
Scenario A 3% 28% 69% 69% 3% 27% 63% 37% 0% 3% 46% 51% <br />
Scenario B 3% 38% 59% 75% 25% 0% 89% 11% 0% 4% 57% 39% <br />
Scenario C 3% 43% 54% 63% 14% 13% 87% 13% 0% 4% 73% 22% <br />
Scenario D 3% 43% 54% 63% 14% 13% 87% 13% 0% 4% 73% 22% <br />
- In full compliance with objective<br />
- In partial compliance with objective<br />
- Not in compliance with objective<br />
Table 8.3 Summary of Objective Assessments<br />
Objective 1<br />
Objective 2<br />
Objective 3<br />
Objective 4<br />
<strong>Athy</strong> IFPLUT Study 80 Final Report December 2004<br />
Compliance<br />
Desirable<br />
threshold<br />
Acceptable<br />
threshold<br />
Beyond<br />
Acceptable<br />
Scenario A <br />
Scenario B <br />
Scenario C <br />
Scenario D <br />
- In full compliance with objective<br />
- In partial compliance with objective<br />
- Not in compliance with objective<br />
Objective 5<br />
Objective 6<br />
Objective 7<br />
Objective 8<br />
Objective 9<br />
Objective 11<br />
Compliance<br />
Desirable<br />
threshold<br />
Acceptable<br />
threshold<br />
Beyond<br />
Acceptable<br />
Compliance