2020 Vision for Athy - Entire Document - Kildare.ie
2020 Vision for Athy - Entire Document - Kildare.ie
2020 Vision for Athy - Entire Document - Kildare.ie
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
4.2 Consultation Methodology<br />
The details of the consultation process are outlined below, which indicates that the process was comprehensive and<br />
sought the v<strong>ie</strong>ws from as wide a cross-section of stakeholders as possible.<br />
Consultants<br />
Elected<br />
Members<br />
Public<br />
Stakeholders<br />
Statutory<br />
Bod<strong>ie</strong>s<br />
Private<br />
Concerns<br />
Figure 4.1 – Consultation Methodology<br />
4.3 Timetable of Consultation<br />
The sequence of consultation to date is as follows:<br />
Preliminary Draft Report<br />
Stage Stage<br />
• Public Consultation Workshops March 2003 Sept 2003<br />
• Cl<strong>ie</strong>nt/Technical/Steering Group Ongoing Ongoing<br />
• Br<strong>ie</strong>fing to <strong>Athy</strong> Town Council Feb 2003 Sept 2003<br />
• Br<strong>ie</strong>fing to <strong>Athy</strong> Area Councillors Sept 2003<br />
• Statutory Bod<strong>ie</strong>s, Transport Providers, Private Groups Ongoing Ongoing<br />
• Br<strong>ie</strong>fing to <strong>Athy</strong> Forum<br />
Preliminary Draft Report Final<br />
Presentation &<br />
Submissions<br />
Presentation<br />
Workshop<br />
&Submissions<br />
One to One<br />
meetings<br />
Final<br />
Report<br />
• Br<strong>ie</strong>fing to <strong>Kildare</strong> County Council Strategic Policy Group July 2003 Sept 2003<br />
<strong>Athy</strong> IFPLUT Study 37 Final Report December 2004<br />
Stage<br />
Presentation &<br />
Submissions<br />
Presentation<br />
&Submissions<br />
One to One &<br />
Workshop<br />
Submissions Submissions