Service Bulletin
Service Bulletin
Service Bulletin
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Installation process for upgrade kit<br />
For 1 Phase Electric Hoist (1/2 Ton—5Ton)<br />
1. Confirm that the electric hoist is disconnected from the power supply.<br />
2. Unscrew the 8 Phillips pan head machine screws M6×10 (1/2SS-3C-042) from the<br />
motor side cover (1/2SS-3C-102 or 1SS-3C-102).<br />
motor side cover (1/2SS-3C-102<br />
or 1SS-3C-102 )<br />
Figure 1 Figure 2<br />
3. Move the motor side cover (1/2SS-3C-102 or 1SS-3C-102) away from the hoist body.<br />
motor side cover (1/2SS-3C-102<br />
or 1SS-3C-102 )<br />
Phillips pan head machine screw<br />
M6×10 (1/2SS-3C-042)<br />
Figure 3 Figure 4<br />
3<br />
-- Page 3 of 38 ---