19.07.2013 Views

Service Bulletin

Service Bulletin

Service Bulletin

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

16. Pull the wires through the hoist body and back to the motor side.<br />

Wires were<br />

pulled<br />

Figure 24<br />

17. Unscrew the 2 Phillips pan head machine screws M6×10 (1/2SS-3C-042) from the<br />

motor side plate (1/2SS-3C-016 or 1SS-3C-016).<br />

Figure 25<br />

18. Remove the control board away from the hoist body. The control board can be<br />

discarded.<br />

the control board<br />

Figure 26<br />

32<br />

screws M6×10 (1/2SS-3C-042)<br />

-- Page 32 of 38 ---

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!