KAPPA V ECHOS AC IOM.pdf - Industrial Air
KAPPA V ECHOS AC IOM.pdf - Industrial Air
KAPPA V ECHOS AC IOM.pdf - Industrial Air
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
SYMPTOM<br />
A)<br />
No compressor<br />
running. Fans<br />
stopped (display Off)<br />
B)<br />
No compressor<br />
running. Display On:<br />
”OFF from external<br />
consent”<br />
C)<br />
No compressor<br />
running. Display On:<br />
”OFF from supervision<br />
system”<br />
D)<br />
No compressor<br />
running. Display On:<br />
”OFF”<br />
OPERATION<br />
COOLING HEATING<br />
PROBABLE CAUSE<br />
Blue Box 53<br />
POSSIBLE CORRECTIVE <strong>AC</strong>TION<br />
˜ ˜ No mains power Check presence of mains power<br />
˜ ˜ Main power switch Off<br />
(position "O")<br />
Turn main power selector to<br />
position "I"<br />
˜ ˜ No power to control circuits Check fuses FU50, FU51, FU52.<br />
Check operation of transformer<br />
˜ ˜ Incorrect phase sequence<br />
(relay KA5 with only green<br />
LED lit)<br />
˜ ˜ Relay KA5 with green and<br />
yellow LEDs off<br />
Invert two of the phase wires of<br />
the power supply line; when the<br />
unit is powered up again both<br />
the green and yellow LEDs<br />
should light<br />
Check fuses FU56;<br />
If fuses are OK replace phase<br />
sequence relay<br />
˜ ˜ No external consent Check presence of external<br />
consent; if not present, bridge<br />
terminals 1 and 2<br />
˜ ˜ No consent from<br />
supervision system<br />
˜ ˜ No consent from “on/off”<br />
key of user interface<br />
Activate operation from<br />
supervision system<br />
Press “on/off” key