Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

constraints on the Masterplan design and require further consideration/ detailed study.<br />

The 5km Study Area boundary is demarcated on Figure 4, Appendix B.<br />

4.2.2 Site visits and surveys<br />

As outlined in Section 3.1.1, a number of surveys were carried out at the site in 2002 –<br />

2003 as part of an EIA 2 to inform the planning application of the extant Masterplan, which<br />

received consent in 2005 (extended in 2010).<br />

Various ground investigations of the site were undertaken between 2001 and 2007.<br />

A site walkover was undertaken by the current EIA project manager on the 7 th November<br />

2011 as part of this scoping exercise.<br />

4.3 Consultation<br />

Consultation is an important part of the EIA process for a number of reasons:<br />

• an important source of environmental baseline information;<br />

• a good method of identifying key environmental concerns/ issues (both factual and<br />

perceived);<br />

• can highlight new information/ concepts not previously considered and thereby<br />

inform the design process;<br />

• influences the scope of the EIA process, the methods used to undertake the<br />

environmental assessments, and the content of the ES;<br />

• a way of gauging the overall acceptability of a proposed development or a<br />

preference for a particular scheme option(s).<br />

4.3.1 Design consultation<br />

Over the course of the redesign of the Masterplan, the Project Team has undertaken<br />

consultation with various bodies and third parties including:<br />

• Architecture and Design Scotland (25 th October 2011);<br />

• Clydebank East Community <strong>Council</strong> (23 rd August 2011 & 3 rd October 2011);<br />

• Parkhall, North Kilbowie and Central Community <strong>Council</strong> (23 rd August 2011 & 3 rd<br />

October 2011); and<br />

• WDC (various dates).<br />

2 Clydeside Regeneration Ltd. June 2003. Proposed Redevelopment of Queen’s Quay, Clydebank:<br />

Environmental Statement.<br />

Page 17<br />

Final for Issue