1. INTRODUCTION<br />

1.1 Background<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

The Queen’s Quay site is situated in Clydebank on the north bank of the River Clyde (see<br />

Figure 1, Appendix B). The site is centred on OS Grid reference NS 4950 6990.<br />

Dawn Group Ltd. and Clydeside Regeneration Ltd. (the Applicants) are seeking planning<br />

permission in principle for a Masterplan of the Queen’s Quay site (hereafter referred to as<br />

‘the Development’). The Development site would comprise a mixed land use<br />

development to include residential areas, offices, and leisure and retail together with<br />

public realm and greenspace provision.<br />

1.2 Environmental Impact Assessment<br />

1.2.1 Screening opinion<br />

An Environmental Impact Assessment (EIA) screening decision for the Development was<br />

obtained from the Local Planning Authority (LPA), West Dunbartonshire <strong>Council</strong> (WDC),<br />

in October 2011 (see Appendix A). In their response the <strong>Council</strong> stated that:<br />

“Under the Regulations the proposal is a Schedule 2 development by<br />

reason of exceeding the threshold criteria (size of site) and in being<br />

within a “sensitive area”. On the basis of the selection criteria, the<br />

guidance in Circular 3/2011 and the consultation response from SNH<br />

it is considered that the environmental impacts of the development are<br />

significant and require further assessment. Individually, some of the<br />

impacts identified could be addressed by other supporting <strong>documents</strong><br />

as part of the planning process, but cumulatively the potential impacts<br />

are considered to be sufficient to require an EIA in order to allow the<br />

environmental impacts to be properly addressed.”<br />

An EIA, under the Environmental Impact Assessment (Scotland) Regulations 2011<br />

therefore has to be undertaken.<br />

Furthermore, as part of the site along the waterfront of the River Clyde is designated as a<br />

Special Protection Area (SPA) (see Chapter 5 and Figure 5, Appendix B), under the<br />

Conservation (Natural Habitats & c.) Regulations 1994 (as amended) the Competent<br />

Authority (in this case the LPA, WDC) will also need to undertake a Habitat Regulations<br />

Assessment (HRA) to assess the impacts of the Development on the conservation<br />

objectives of the Inner Clyde SPA and its qualifying interest – Redshank (Tringa totanus).<br />

A stand alone report to inform the HRA will require to be submitted to the <strong>Council</strong> (the<br />

Competent Authority) with the planning application<br />

This report will also be used to inform the EIA and will be included as technical appendix<br />