14.08.2013 Views

Supporting documents - Renfrewshire Council

Supporting documents - Renfrewshire Council

Supporting documents - Renfrewshire Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Major Mixed Use<br />

Development, Queen's<br />

Quay, Clydebank<br />

EIA Scoping Report<br />

04 January 2011<br />

Final for Issue<br />

Issue No 1<br />

46374673/EDRP0001


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Project Title: Major Mixed Use Development, Queen's Quay, Clydebank<br />

Report Title: EIA Scoping Report<br />

Project No: 46374673<br />

Report Ref: EDRP0001<br />

Status: Draft<br />

Client Contact Name: Steve McConnell<br />

Client Company Name: Dawn Group Ltd<br />

Issued By:<br />

URS Scott Wilson Ltd<br />

23 Chester Street<br />

Edinburgh EH3 7EN<br />

United Kingdom<br />

Tel: +44 (0) 131 225 1230<br />

Fax: +44 (0) 131 225 5582<br />

www.ursglobal.com<br />

Document Production / Approval Record<br />

Issue No:<br />

1<br />

Prepared<br />

by<br />

Checked<br />

by<br />

Approved<br />

by<br />

Name Signature Date Position<br />

Kathryn Dennis<br />

Jean Curran<br />

Jean Curran<br />

Document Revision Record<br />

Issue No Date Details of Revisions<br />

1 04.01.2012 Final for Issue<br />

04.01.12 Principal Consultant<br />

04.01.12 Associate Director<br />

04.01.12 Associate Director<br />

Final for Issue


CONTENTS<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

SECTION PAGE NO<br />

1. INTRODUCTION.............................................................................................................. 1<br />

1.1 Background ...................................................................................................................... 1<br />

1.2 Environmental Impact Assessment.................................................................................. 1<br />

1.3 Report structure................................................................................................................ 3<br />

1.4 Limitations ........................................................................................................................ 4<br />

1.5 Copyright .......................................................................................................................... 4<br />

2. DEVELOPMENT PROPOSAL DESCRIPTION............................................................... 5<br />

2.1 Site location...................................................................................................................... 5<br />

2.2 Site history........................................................................................................................ 6<br />

2.3 Masterplan proposal......................................................................................................... 7<br />

3. PLANNING AND POLICY FRAMEWORK...................................................................... 8<br />

3.1 Extant planning consent for Queen’s Quay ..................................................................... 8<br />

3.2 Comparison of proposed and consented Masterplan .................................................... 10<br />

3.3 In-combination development .......................................................................................... 10<br />

3.4 Planning policy overview and development context ...................................................... 11<br />

4. EIA SCOPING STUDY METHODOLOGY..................................................................... 16<br />

4.1 Environmental baseline.................................................................................................. 16<br />

4.2 Methods.......................................................................................................................... 16<br />

4.3 Consultation ................................................................................................................... 17<br />

5. ENVIRONMENTALLY DESIGNATED SITES AND FEATURES.................................. 21<br />

5.1 European designated sites............................................................................................. 21<br />

5.2 UK designated sites ....................................................................................................... 21<br />

5.3 Local designations.......................................................................................................... 23<br />

5.4 Other designations ......................................................................................................... 24<br />

6. ECOLOGY & NATURE CONSERVATION ................................................................... 26<br />

7. LANDSCAPE & VISUAL ............................................................................................... 30<br />

7.1 Introduction..................................................................................................................... 30<br />

7.2 Consultation ................................................................................................................... 30<br />

7.3 Baseline.......................................................................................................................... 30<br />

7.4 Key issues ...................................................................................................................... 32<br />

8. WATER RESOURCES .................................................................................................. 34<br />

8.1 Introduction..................................................................................................................... 34<br />

8.2 Consultation ................................................................................................................... 34<br />

8.3 Baseline.......................................................................................................................... 34<br />

8.4 Potential receptors ......................................................................................................... 38<br />

8.5 Key issues ...................................................................................................................... 38<br />

8.6 Proposed studies for EIA ............................................................................................... 38<br />

Page i<br />

Final for Issue


CONTENTS<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

SECTION PAGE NO<br />

9. GEOLOGY & SOILS...................................................................................................... 40<br />

9.1 Introduction..................................................................................................................... 40<br />

9.2 Ground Investigation ...................................................................................................... 40<br />

9.3 Consultation ................................................................................................................... 40<br />

9.4 Baseline.......................................................................................................................... 40<br />

9.5 Potential receptors ......................................................................................................... 41<br />

9.6 Key issues ...................................................................................................................... 42<br />

9.7 Proposed studies for EIA ............................................................................................... 42<br />

10. TRAFFIC ........................................................................................................................ 45<br />

10.1 Introduction..................................................................................................................... 45<br />

10.2 Traffic Assessment method............................................................................................ 45<br />

10.3 Consultation ................................................................................................................... 47<br />

10.4 Baseline.......................................................................................................................... 47<br />

10.5 Queen’s Quay traffic comparison................................................................................... 50<br />

11. NOISE & VIBRATION.................................................................................................... 52<br />

11.1 Introduction..................................................................................................................... 52<br />

11.2 Consultation ................................................................................................................... 52<br />

11.3 Baseline.......................................................................................................................... 52<br />

11.4 Potential receptors ......................................................................................................... 52<br />

11.5 Key issues ...................................................................................................................... 53<br />

11.6 Proposed assessment for EIA........................................................................................ 53<br />

12. AIR QUALITY ................................................................................................................ 55<br />

12.1 Introduction..................................................................................................................... 55<br />

12.2 Consultation ................................................................................................................... 55<br />

12.3 Baseline.......................................................................................................................... 55<br />

12.4 Potential receptors ......................................................................................................... 55<br />

12.5 Key issues ...................................................................................................................... 56<br />

12.6 Proposed studies for EIA ............................................................................................... 56<br />

13. ARCHAEOLOGY & CULTURAL HERITAGE............................................................... 57<br />

13.1 Introduction..................................................................................................................... 57<br />

13.2 Consultation ................................................................................................................... 57<br />

13.3 Baseline.......................................................................................................................... 57<br />

13.4 Potential receptors ......................................................................................................... 58<br />

13.5 Key issues ...................................................................................................................... 59<br />

13.6 Proposed studies for EIA ............................................................................................... 59<br />

14. SOCIO-ECONOMICS .................................................................................................... 61<br />

14.1 Introduction..................................................................................................................... 61<br />

14.2 Consultation ................................................................................................................... 61<br />

14.3 Baseline.......................................................................................................................... 62<br />

14.4 Potential receptors ......................................................................................................... 62<br />

14.5 Key issues ...................................................................................................................... 63<br />

Page ii<br />

Final for Issue


CONTENTS<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

SECTION PAGE NO<br />

14.6 Proposed studies for EIA ............................................................................................... 64<br />

15. FORMAT OF THE ENVIRONMENTAL STATEMENT (ES).......................................... 67<br />

15.1 Environmental issues to be included within the EIA ...................................................... 67<br />

15.2 Environmental issues to be “scoped out” of the EIA...................................................... 67<br />

15.3 EIA team......................................................................................................................... 67<br />

15.4 Format of the environmental information ....................................................................... 68<br />

16. ABBREVIATIONS.......................................................................................................... 69<br />

APPENDIX A SCREENING DECISION<br />

APPENDIX B FIGURES<br />

Page iii<br />

Final for Issue


1. INTRODUCTION<br />

1.1 Background<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

The Queen’s Quay site is situated in Clydebank on the north bank of the River Clyde (see<br />

Figure 1, Appendix B). The site is centred on OS Grid reference NS 4950 6990.<br />

Dawn Group Ltd. and Clydeside Regeneration Ltd. (the Applicants) are seeking planning<br />

permission in principle for a Masterplan of the Queen’s Quay site (hereafter referred to as<br />

‘the Development’). The Development site would comprise a mixed land use<br />

development to include residential areas, offices, and leisure and retail together with<br />

public realm and greenspace provision.<br />

1.2 Environmental Impact Assessment<br />

1.2.1 Screening opinion<br />

An Environmental Impact Assessment (EIA) screening decision for the Development was<br />

obtained from the Local Planning Authority (LPA), West Dunbartonshire <strong>Council</strong> (WDC),<br />

in October 2011 (see Appendix A). In their response the <strong>Council</strong> stated that:<br />

“Under the Regulations the proposal is a Schedule 2 development by<br />

reason of exceeding the threshold criteria (size of site) and in being<br />

within a “sensitive area”. On the basis of the selection criteria, the<br />

guidance in Circular 3/2011 and the consultation response from SNH<br />

it is considered that the environmental impacts of the development are<br />

significant and require further assessment. Individually, some of the<br />

impacts identified could be addressed by other supporting <strong>documents</strong><br />

as part of the planning process, but cumulatively the potential impacts<br />

are considered to be sufficient to require an EIA in order to allow the<br />

environmental impacts to be properly addressed.”<br />

An EIA, under the Environmental Impact Assessment (Scotland) Regulations 2011<br />

therefore has to be undertaken.<br />

Furthermore, as part of the site along the waterfront of the River Clyde is designated as a<br />

Special Protection Area (SPA) (see Chapter 5 and Figure 5, Appendix B), under the<br />

Conservation (Natural Habitats & c.) Regulations 1994 (as amended) the Competent<br />

Authority (in this case the LPA, WDC) will also need to undertake a Habitat Regulations<br />

Assessment (HRA) to assess the impacts of the Development on the conservation<br />

objectives of the Inner Clyde SPA and its qualifying interest – Redshank (Tringa totanus).<br />

A stand alone report to inform the HRA will require to be submitted to the <strong>Council</strong> (the<br />

Competent Authority) with the planning application<br />

This report will also be used to inform the EIA and will be included as technical appendix<br />

within the Environmental Statement (ES).<br />

Page 1<br />

Final for Issue


1.2.2 EIA scoping<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

EIA scoping is the process of determining which environmental issues should be covered<br />

within the environmental information to be submitted to the Competent Authority within<br />

the ES and the scope of the assessments to be undertaken. This scoping report has<br />

been produced to inform the <strong>Council</strong>’s formal scoping opinion for the proposed Queen’s<br />

Quay Masterplan EIA. The purpose of the report is to:<br />

• provide a description of the proposed Development (Masterplan);<br />

• outline the baseline environmental characteristics of the area potentially affected by<br />

the Development;<br />

• identify the environmental themes (e.g. ecology, landscape, noise etc.) that will<br />

require to be addressed within the environmental information submitted within the<br />

ES; and<br />

• specify the proposed scope, extent and methods of environmental studies to be<br />

carried out as part of the EIA to identify potential environmental effects caused by<br />

the Masterplan proposals and to assess the magnitude and significance of these<br />

effects.<br />

In accordance with the Environmental Impact Assessment (Scotland) Regulations 2011,<br />

this Scoping Report together with a request for a formal scoping opinion will be issued to<br />

the West Dunbartonshire <strong>Council</strong> (WDC). To inform their decision, WDC is statutorily<br />

obliged to consult with a number of EIA consultees, which for the proposed Development<br />

will include:<br />

• BAA Glasgow Airport;<br />

• Crown Estates;<br />

• Health and Safety Executive;<br />

• Historic Scotland;<br />

• Marine Scotland;<br />

• Scottish Environment Protection Agency (SEPA);<br />

• Scottish Government;<br />

• Scottish Natural Heritage (SNH);<br />

• Scottish Water;<br />

• Transport Scotland; and<br />

• West Dunbartonshire <strong>Council</strong> (WDC).<br />

Page 2<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

The statutory consultees are invited to comment on the environmental baseline, the<br />

planned content of the EIA and the proposed assessment methods and to provide<br />

additional relevant environmental information where available.<br />

All comments and information received from the statutory consultees will be used to<br />

inform the EIA process, the content of the final ES, and the scope, extent and methods<br />

used to carry out the various environmental assessments required. A statutory<br />

consultation period of 28 days is allowed for the return of the scoping opinion to the<br />

Applicant(s).<br />

1.3 Report structure<br />

The structure of the remainder of the Scoping Report is as follows:<br />

2. DEVELOPMENT PROPOSAL DESCRIPTION: Provides a general overview of the site<br />

location, context and history; gives a description of the history of the Masterplan area;<br />

and provides details of the Masterplan proposals.<br />

3. PLANNING AND POLICY FRAMEWORK: Describes the recent planning history of the<br />

Development site; identifies in-combination development that will be considered as part of<br />

the EIA; and details the planning policy relevant to the Development that will be examined<br />

within the EIA policy review.<br />

4. EIA SCOPING STUDY METHODOLOGY: Sets out the methods used to undertake the<br />

EIA Scoping Study.<br />

5. ENVIRONMENTALLY DESIGNATED SITES AND FEATURES: Identifies the<br />

environmentally designated sites and protected features within 5km of the site boundary.<br />

6 – 14. ENVIRONMENTAL BASELINE AND PROPOSED EIA SCOPE: For each<br />

environmental discipline the relevant chapter provides a description of the existing<br />

environmental baseline; <strong>documents</strong> the consultation undertaken to date; identifies key<br />

environmental issues to be considered during the EIA process; and outlines the proposed<br />

scope and methods of environmental studies to be undertaken to assess the nature,<br />

extent, magnitude and significance of these effects.<br />

The individual environmental disciplines examined within this Scoping Study are:<br />

• 6. ECOLOGY & NATURE CONSERVATION<br />

• 7. LANDSCAPE & VISUAL<br />

• 8. WATER RESOURCES<br />

• 9. GEOLOGY & SOILS<br />

• 10. TRAFFIC<br />

• 11. NOISE & VIBRATION<br />

Page 3<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

• 12. AIR QUALITY<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

• 13. ARCHAEOLOGY & CULTURAL HERITAGE<br />

• 14. SOCIO-ECONOMIC IMPACTS<br />

15. FORMAT OF THE ENVIRONMENTAL STATEMENT (ES): Introduces the EIA team,<br />

summarises the environmental topics for inclusion within the EIA, and describes the<br />

format of the final ES.<br />

16. ABBREVIATIONS<br />

APPENDICES A - C<br />

1.4 Limitations<br />

URS Infrastructure & Environment UK Ltd (URS) has prepared this Report for the sole<br />

use of Dawn Group Ltd in accordance with the Agreement under which our services were<br />

performed. No other warranty, expressed or implied, is made as to the professional<br />

advice included in this Report or any other services provided by us. This Report may not<br />

be relied upon by any other party without the prior and express written agreement of<br />

URS. Unless otherwise stated in this Report, the assessments made assume that the<br />

sites and facilities will continue to be used for their current purpose without significant<br />

change. The conclusions and recommendations contained in this Report are based upon<br />

information provided by others and upon the assumption that all relevant information has<br />

been provided by those parties from whom it has been requested. Information obtained<br />

from third parties has not been independently verified by URS, unless otherwise stated in<br />

the Report.<br />

1.5 Copyright<br />

© This Report is the copyright of URS Infrastructure & Environment UK Ltd. Any<br />

unauthorised reproduction or usage by any person other than the addressee is strictly<br />

prohibited.<br />

Page 4<br />

Final for Issue


2. DEVELOPMENT PROPOSAL DESCRIPTION<br />

2.1 Site location<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

The Development site is situated in the town of Clydebank on the north bank of the River<br />

Clyde. The site is centred on OS Grid reference NS 4950 6990 (see Figure 1, Appendix<br />

B).<br />

The site is bounded by the River Clyde to the south-west; Queen’s Quay Enterprise and<br />

Learning District/ Queen’s Gate residential development to the south-east; undeveloped<br />

land and light industry/ commercial properties along Cable Depot Road to the north; and<br />

the A814 Glasgow Road/ residential, commercial and civic properties along Dumbarton<br />

Road to the northeast and east.<br />

The site is generally flat but there is a gentle gradient (typically falling south-east to northwest)<br />

from Dumbarton Road down towards the River Clyde. Ground levels range<br />

between 8.7m above ordnance datum (AOD) (in the north-eastern corner of the site at<br />

the Dumbarton Road boundary) and 4.5m AOD (at the quayside). The majority of the site,<br />

north-west of the Queen’s Dock, is lower than 5.7m AOD.<br />

The site is underlain by made ground deposited in the 19 th century during the original<br />

development of the greenfield site to raise the existing ground level and accommodate<br />

the dock infrastructure. The natural drift deposits below the made ground comprise<br />

alluvium overlying glacial till. The bedrock is mudstone, believed to be part of the<br />

Lawmuir Formation (sandstones and mudstones with thin bands of limestone and coal<br />

measures).<br />

Plate 1: Queen’s Quay cleared site looking north-west<br />

The majority of the Development site has been cleared and has been predominantly<br />

vacant over the past 10 years. Two major features within the site are the Queen’s Quay<br />

Page 5<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

dock and the Titan Crane. A purpose-built education centre was opened at the base of<br />

the crane in June 2011.<br />

2.2 Site history<br />

Historical mapping suggests that the Development site was used for agricultural pasture<br />

until it was first developed in 1871 by J & G Thomson as a shipbuilding and engineering<br />

yard. The yard was bought by John Brown and Co. in 1899 and became one of the most<br />

important shipyards on the Clyde. Famous ships associated with the yard include the<br />

Lusitania, Aquitania, the Royal Yacht Britannia and the Queen Elizabeth the 2 nd . The<br />

shipyard operated at the Queen’s Quay site up until its closure in the 1970s.<br />

Plate 2: John Brown’s Shipyard<br />

Plate 3: The Queen Elizabeth II at Clydebank<br />

The shipyard was purchased by Marathon Manufacturing in 1972 and was used for the<br />

manufacture of oil drilling rigs and platforms. The site was subsequently bought by<br />

UiE/Kvaerner in 1980 and continued to manufacture oil rigs until 1999.<br />

Page 6<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Since its closure in 1999, the Development site has been completely cleared, with the<br />

exception of the Titan Crane structure. The Crane was refurbished and opened as a<br />

tourist attraction in 2007. The Titan Enterprise visitor centre, located to the south-east of<br />

the dock and outwith the Development site boundary, was opened in June 2011.<br />

2.3 Masterplan proposal<br />

2.3.1 Overview<br />

The Development area is approximately 24.08 Ha. The Masterplan proposes a mixed use<br />

development on the Queen’s Quay site that may include the following development<br />

classes:<br />

• Residential (including affordable housing and care homes);<br />

• Retail (including a large format superstore with petrol filling station);<br />

• Offices;<br />

• Leisure;<br />

• Food and drink and/or public house;<br />

• Hotel development;<br />

• Creche/ Nursery;<br />

• Car parking; and<br />

• Public realm.<br />

The zoning of these development categories within the site is highlighted on Figure 2,<br />

Appendix B. The Development would also include hard and soft landscaping works and<br />

repairs to the existing quayside.<br />

Vehicular access to and from the site will be taken from the existing site access points:<br />

Cable Depot Road and Cart Street.<br />

Construction of the Development is likely to occur in up to six phases (see Figure 3,<br />

Appendix B).<br />

Page 7<br />

Final for Issue


3. PLANNING AND POLICY FRAMEWORK<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

This chapter describes the planning history of the site and the extant planning<br />

permissions thereon and identifies other development projects currently being proposed<br />

in the local Clydebank area that will need to be considered “in combination” with the<br />

Queen’s Quay Masterplan proposals.<br />

The chapter also examines the national and local planning policy framework and<br />

identifies the planning policies and guidance that will need to be considered as part of the<br />

EIA planning policy review and assessment.<br />

3.1 Extant planning consent for Queen’s Quay<br />

In July 2005, Clydeside Regeneration Ltd obtained outline planning consent for a mixed<br />

use development Masterplan of the Queen’s Quay site.<br />

Plate 4: Extant Masterplan for Queen’s Quay<br />

The primary planning permissions in relation to the Development site are as follows:<br />

• DC02/283 – mixed use development, granted 1 July 2005;<br />

• DC07/334/FUL – S42 to amend some of the conditions in the above permission;<br />

• DC07/333/REM – reserved matters application in relation to DC02/283 for housing<br />

element;<br />

• DC10/084/FUL – S42 to extend timescales of above permission.<br />

Page 8<br />

Final for Issue


3.1.1 Environmental statement<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

An EIA was carried out by McInally Associates Ltd in 2003 1 to inform the 2005 planning<br />

consent. The EIA covered a number of environmental themes including: traffic, noise,<br />

visual amenity, contaminated land, ecology, hydrology and hydrogeology, industrial<br />

archaeology and pollution control. A chapter on flood risk and another on sustainable<br />

urban drainage systems (SUDS) were also included.<br />

Detailed survey work was carried out to inform the EIA including:<br />

• junction surveys (traffic flow), November 2002;<br />

• baseline noise survey, March 2003;<br />

• viewpoint analysis (visual impact);<br />

• ground investigation, 2001;<br />

• phase 1 habitat survey, March 2003;<br />

• bat roost potential survey, 2003; and<br />

• archaeology walkover survey.<br />

3.1.2 Queen’s Quay Enterprise and<br />

Learning District<br />

In March 2005, Clydebank Property<br />

Company (a subsidiary of Clydebank Re-<br />

Built) acquired 16 acres of the Queen’s<br />

Quay site (located to the south-east of the<br />

current Development site boundary). The<br />

site was named the Queen’s Quay<br />

Enterprise and Learning District (QQELD)<br />

and a series of new developments have<br />

now been completed in this area including:<br />

• Refurbishment of the quayside;<br />

• Provision of a new pontoon;<br />

• Clydebank College;<br />

• Purser’s Office<br />

(Titan Crane Visitor’s Centre);<br />

1 Clydeside Regeneration Ltd. June 2003. Proposed Redevelopment of Queen’s Quay, Clydebank:<br />

Environmental Statement.<br />

Plate 5: Titan Enterprise building<br />

Page 9<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

• Titan Enterprise<br />

(office development);<br />

• Aurora House<br />

(office development).<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

3.2 Comparison of proposed and consented Masterplan<br />

The proposed Masterplan covers a smaller area than the currently consented Queen’s<br />

Quay Masterplan (ref: DC10/084/FUL – S42) as the south-eastern portion of this site has<br />

been developed out since 2005 (see QQELD description above). There is also a slight<br />

difference in the line of the north-western boundary of the site with the new Masterplan<br />

boundary not extending as far downstream along the river bank as the current<br />

Masterplan.<br />

Other than the changes to the red line boundary, the proposed Masterplan is very similar<br />

to the consented Masterplan in that it comprises mixed use development which includes<br />

residential, office, leisure, and retail development. The key difference is that the new<br />

Masterplan includes provision for a large format supermarket development within the<br />

eastern corner of the site. The proposed petrol station associated with the supermarket<br />

plot mirrors the proposals for a new petrol station on Cart Street within the consented<br />

Masterplan.<br />

3.3 In-combination development<br />

In order to assess in-combination environmental effects, the planning department of WDC<br />

was approached for information on other developments in the local area that have either<br />

been given planning consent or which are currently being taken forward for consideration<br />

through the planning application process. Table 3.1 below provides details of the incombination<br />

developments that have been identified to date:<br />

Table 3.1: In-combination development<br />

Ref No. Site Development Decision Built<br />

DC04/512 Cable Depot<br />

Road<br />

DC11/119/FUL<br />

Cable Depot<br />

Road<br />

DC03/346 Tesco site at<br />

Argyll Road/<br />

Abbotsford Road<br />

Erection of residential<br />

development with associated road<br />

works & landscaping (outline).<br />

Variation of conditions 1 & 2 of<br />

DC04-512 to extend time period for<br />

commencement of residential<br />

development.<br />

Erection of class 1 food store<br />

(84,000 square feet (sqft)) retail<br />

units (2,500 sqft) petrol filling<br />

station parking and relocation of<br />

Credit Union building (outline).<br />

GRA –<br />

18/04/06<br />

N<br />

Pending N<br />

GRA –<br />

16/06/04<br />

N<br />

Page 10<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Ref No. Site Development Decision Built<br />

DC10/102/FUL Tesco site at<br />

Argyll Road/<br />

Abbotsford Road<br />

Erection of a Class 1 food store<br />

(84,000 sqft) retail units (2,500<br />

sqft) petrol filling station parking<br />

and relocation of credit union<br />

building (variation of conditions 1<br />

and 2 of permission DC03/346 to<br />

extend time limits for<br />

commencement of development<br />

and submission of matters<br />

specified in conditions).<br />

DC04/354 Cart Street Erection of business enterprise<br />

pavilion office building with<br />

associated infrastructure parking &<br />

landscaping.<br />

DC07/197/OUT Land to east of<br />

Golden Jubilee<br />

Hospital, Cable<br />

Depot Road<br />

DC09/060/FUL Land to east of<br />

Golden Jubilee<br />

Hospital, Cable<br />

Depot Road<br />

DC08/072/FUL Stanford Street,<br />

Whitecrook<br />

Erection of Class 4 Office<br />

Accommodation (11,115 m²) with<br />

associated parking formation of<br />

new roundabout & realignment of<br />

Cable Depot road formation of<br />

riverside walkway and landscaping<br />

(outline).<br />

GRA –<br />

01/06/10<br />

GRA –<br />

30/11/04<br />

GRA –<br />

05/11/07<br />

Erection of office/day nursery. GRA –<br />

02/10/09<br />

Erection of 92 flats with associated<br />

parking.<br />

3.4 Planning policy overview and development context<br />

GRA –<br />

03/06/08<br />

N<br />

Under<br />

construction<br />

The ES for the Queen’s Quay Masterplan will provide a detailed planning policy overview<br />

that will outline the policies relevant to the proposed Development and examine how<br />

compliant the proposals are within a national and local development planning context.<br />

The <strong>documents</strong> that will be used to inform the planning review chapter are listed in<br />

Sections 3.4.1 to 3.4.3 below.<br />

3.4.1 National Planning Policy<br />

The Scottish Government’s planning policies are set out in the National Planning<br />

Framework for Scotland 2 (NPF2), Scottish Planning Policy (SPP), Policy Statements,<br />

Planning Advice Notes (PANs) and Circulars.<br />

N<br />

Y<br />

N<br />

Page 11<br />

Final for Issue


3.4.1.1 National Planning Framework for Scotland 2<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

The NPF2 was published in June 2009 with the aim of guiding Scotland’s development<br />

until 2030 by setting out the Government’s strategic development priorities for achieving<br />

sustainable economic growth. The aims of the strategy for Scotland’s spatial<br />

development to 2030 are to:<br />

• contribute to a wealthier and fairer Scotland by supporting sustainable economic<br />

growth and improved competitiveness and connectivity;<br />

• promote a greener Scotland by contributing to the achievement of climate change<br />

targets and protecting and enhancing the quality of the natural and built<br />

environments;<br />

• help build safer, stronger and healthier communities, by promoting improved<br />

opportunities and a better quality of life; and<br />

• contribute to a smarter Scotland by supporting the development of the knowledge<br />

economy.<br />

NPF2 recognises the Clyde Corridor as a national regeneration priority with the Clyde<br />

Waterfront and Clyde Gateway areas highlighted as the main foci for redevelopment in<br />

the medium term.<br />

3.4.1.2 Scottish planning policy (2010)<br />

The SPP document sets out the Scottish Government’s policy on nationally important<br />

land use planning matters. The document comprises:<br />

• a statement on the purpose of planning;<br />

• core principles for the operation of the planning system and objectives for key parts<br />

of the system;<br />

• guidance on sustainable development;<br />

• a series of concise subject planning policies; and<br />

• a statement of the Government’s expected planning outcomes.<br />

The key subject planning policies within the SPP relevant to the Queen’s Quay<br />

development are:<br />

• economic development<br />

• town centres and retailing<br />

• housing<br />

• historic environment<br />

Page 12<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

• landscape and natural heritage<br />

• open space and physical activity<br />

• transport<br />

• flooding and drainage<br />

3.4.1.3 Policy statements<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

To date the Scottish Government has published three policy statements on design:<br />

‘Designing Places’ (2001); ‘Designing Streets’ (2010); and ‘Green Infrastructure: Design<br />

and Placemaking’ (2011). These policy statements set out the Government’s aspirations<br />

for architectural design in Scotland and outline the role of the planning system in<br />

delivering good quality and sustainable designs.<br />

3.4.1.4 National Planning Advice<br />

The Scottish Government’s Planning Advice Notes (PANs) and Circulars relevant to the<br />

proposed Development will also be considered within the planning review including:<br />

• PAN 1/2011:Planning and Noise;<br />

• PAN 2/2011: Planning and Archaeology;<br />

• PAN 33: Contaminated Land;<br />

• PAN 44: Fitting New Housing Development into the Landscape<br />

• PAN 51: Planning, Environmental Protection and Regulation;<br />

• PAN 52: Planning and Small Towns;<br />

• PAN 59: Improving Town centres;<br />

• PAN 58: Environmental Impact Assessment;<br />

• PAN 60: Planning for Natural Heritage;<br />

• PAN 61: Planning and Sustainable Urban Drainage Systems;<br />

• PAN 63: Waste Management Planning;<br />

• PAN 65: Planning and Open Space;<br />

• PAN 67: Housing Quality;<br />

• PAN 69: Planning and Building Standards Advice on Flooding;<br />

• PAN 75: Planning for Transport;<br />

• PAN 75: Designing Safer places;<br />

Page 13<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

• PAN 78: Inclusive Design;<br />

• PAN 79: Water and Drainage;<br />

• PAN 83: Masterplanning;<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

• Development Planning Appendix 1: The Habitats Regulations (Circular 1/2009<br />

Appendix 1);<br />

• Environmental Impact Assessment (Scotland) Regulations 2011 (circular 3/2011);<br />

• Environmentally Sensitive Areas (Circular 17/1997); and<br />

• National Planning Policy Guideline (NPPG) 8: Retailing (Circular 16/1996).<br />

3.4.2 Development Plan<br />

The development plan that covers the Clydebank areas comprises the Glasgow & Clyde<br />

Valley Joint Structure Plan 4th Alteration (approved 2009) and the West Dunbartonshire<br />

Local Plan (adopted 2010).<br />

3.4.2.1 Structure Plan<br />

The approved Structure Plan sets out a common strategy for the long term planning and<br />

development of Glasgow and the Clyde Valley. Underpinning this strategy is an agenda<br />

for ‘Sustained Growth’ and to achieve this, the Structure Plan identifies four inter-related<br />

aims:<br />

• increase economic competitiveness;<br />

• promote greater social inclusion and integration;<br />

• sustain and enhance the natural and built environment; and<br />

• increase the integration of land use and transportation.<br />

To achieve these aims a number of shared targets are identified. The targets which are<br />

relevant to the proposed Queen’s Quay development are:<br />

• economic performance closer to the national average by 2011, with reduced outmigration;<br />

• a further 200ha of land provided in brownfield locations in existing employment<br />

areas, to encourage firms to relocate to and to improve access to jobs in ‘priority<br />

areas’ (Clydebank is listed as a priority area);<br />

• improving the range of local employment opportunities;<br />

• improving urban brownfield housing opportunities particularly within ‘priority areas’;<br />

• 33% increase in the rate at which urban brownfield land is developed;<br />

Page 14<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

• the maintenance and, if possible, increase of existing levels of public transport use;<br />

• a doubling of the proportion of the population with access to dedicated / prioritised<br />

public transport routes.<br />

3.4.2.2 Emerging planning policy<br />

3.4.2.3 Local Plan<br />

The adopted structure plan is due to be replaced by the Glasgow and the Clyde Valley<br />

Strategic Development Plan (GCVSDP). The GCVSDP was sent to the Scottish Ministers<br />

for their approval on the 31 st October 2011.<br />

Although not yet the adopted plan for the area, the GCSVSDP will be an important<br />

consideration for future development and planning management in Glasgow and the<br />

Clyde Valley and therefore it will be reviewed as part of the EIA planning policy review<br />

exercise.<br />

The West Dunbartonshire Local Plan was adopted in 2010 and provides an up to date<br />

policy document on issues affecting the local authority area. The key aims of the Local<br />

Plan are to:<br />

• promote sustainable development and communities;<br />

• create economic well-being and a sustainable and competitive place through the<br />

development of strategic locations; and<br />

• maintain and enhance the natural and built environment.<br />

It is also important to note that the Local Plan contains policies specific to the Queen’s<br />

Quay Development site.<br />

The proposed development will be reviewed against relevant policies within the plan<br />

within the detailed policy review in the ES.<br />

3.4.3 Other plans and strategic guidance<br />

Other plans and guidance that will be reviewed as part of the EIA policy assessment of<br />

the proposed Development will include:<br />

• Clyde Waterfront Green Network Strategy (2010); and<br />

• Scottish Historic Environment Policy (SHEP) (2009).<br />

Page 15<br />

Final for Issue


4. EIA SCOPING STUDY METHODOLOGY<br />

4.1 Environmental baseline<br />

4.2 Methods<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Establishing the environmental baseline is an important part of the EIA process as it<br />

provides the starting point for identifying the types of impacts that could potentially occur<br />

as a result of a proposed development and for determining the magnitude and<br />

significance of the resulting environmental effects.<br />

An environmental baseline comprises a description of the present nature of the<br />

environment within development site and the wider area (hereafter referred to as the<br />

‘Study Area’) and an inventory of the features and receptors located. The extent of the<br />

Study Area for EIA is not a fixed width buffer but is tailored at the outset of the project to<br />

cover the area over which the Development may have significant environmental effects.<br />

An EIA baseline description often includes a valuation (which can be quantitative or<br />

qualitative) of the features and/or receptors within a study area or indeed the Study Area<br />

as a whole.<br />

The environmental baseline is described differently across the spectrum of EIA<br />

disciplines (e.g. noise, water resources) because the environmental features and<br />

receptors can vary from theme to theme. The spatial extent of the environmental baseline<br />

can also differ for each discipline as a result of the varying extents/ ranges of potential<br />

impacts caused by a development.<br />

Chapters 6 to 14 of this report describe the environmental baseline for each of the EIA<br />

disciplines being considered in relation to the Queen’s Quay Development. Each chapter<br />

also:<br />

• indicates gaps within the baseline data available;<br />

• provides a high level preliminary appraisal of potential environmental effects that<br />

may be caused as a result of implementing the development; and<br />

• outlines the proposed scope, method and spatial extent of the environmental studies<br />

that will be undertaken to update or provide further information on the environmental<br />

baseline and enable the assessment of the magnitude and significance of the<br />

environmental effects.<br />

For the purposes of the Scoping Report, the environmental baseline for the Development<br />

has been established through desk study, walkover survey and consultation.<br />

4.2.1 Desk study<br />

A desk study was undertaken to identify environmentally sensitive sites, features and<br />

receptors within 5km of the site Boundary (the Study Area) that may be affected by the<br />

proposed Development and highlight potential environmental issues that could place<br />

Page 16<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

constraints on the Masterplan design and require further consideration/ detailed study.<br />

The 5km Study Area boundary is demarcated on Figure 4, Appendix B.<br />

4.2.2 Site visits and surveys<br />

As outlined in Section 3.1.1, a number of surveys were carried out at the site in 2002 –<br />

2003 as part of an EIA 2 to inform the planning application of the extant Masterplan, which<br />

received consent in 2005 (extended in 2010).<br />

Various ground investigations of the site were undertaken between 2001 and 2007.<br />

A site walkover was undertaken by the current EIA project manager on the 7 th November<br />

2011 as part of this scoping exercise.<br />

4.3 Consultation<br />

Consultation is an important part of the EIA process for a number of reasons:<br />

• an important source of environmental baseline information;<br />

• a good method of identifying key environmental concerns/ issues (both factual and<br />

perceived);<br />

• can highlight new information/ concepts not previously considered and thereby<br />

inform the design process;<br />

• influences the scope of the EIA process, the methods used to undertake the<br />

environmental assessments, and the content of the ES;<br />

• a way of gauging the overall acceptability of a proposed development or a<br />

preference for a particular scheme option(s).<br />

4.3.1 Design consultation<br />

Over the course of the redesign of the Masterplan, the Project Team has undertaken<br />

consultation with various bodies and third parties including:<br />

• Architecture and Design Scotland (25 th October 2011);<br />

• Clydebank East Community <strong>Council</strong> (23 rd August 2011 & 3 rd October 2011);<br />

• Parkhall, North Kilbowie and Central Community <strong>Council</strong> (23 rd August 2011 & 3 rd<br />

October 2011); and<br />

• WDC (various dates).<br />

2 Clydeside Regeneration Ltd. June 2003. Proposed Redevelopment of Queen’s Quay, Clydebank:<br />

Environmental Statement.<br />

Page 17<br />

Final for Issue


4.3.2 Public exhibition<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Plate 6: Public exhibition<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

A public exhibition, to present the draft Masterplan to the general public, was held on the<br />

site between the 1 st and the 3 rd September 2011.<br />

4.3.3 EIA consultation<br />

4.3.3.1 Scoping<br />

The EIA team is undertaking/ has undertaken a number of consultation exercises with the<br />

statutory EIA consultees, relevant departments within WDC and other third parties. The<br />

purpose of these consultations has been to:<br />

• inform the scope of the EIA;<br />

• gather baseline environmental data;<br />

• allow consultees to raise environmental issues and concerns (factual or perceived);<br />

• identify in combination developments for assessment; and<br />

• highlight potential conflicts of interest.<br />

To date, pre-scoping consultations have been undertaken with the following<br />

organisations:<br />

• Scottish Natural Heritage (SNH);<br />

• WDC (various departments including: planning, environmental health, access, and<br />

roads);<br />

Page 18<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

• West of Scotland Archaeological Society (WoSAS).<br />

A number of statutory EIA consultees will be formally consulted by WDC as part of the<br />

EIA Scoping request process and asked to provide written comment on this Scoping<br />

Report document. These consultees will include:<br />

• BAA Glasgow Airport;<br />

• Crown Estates;<br />

• Health and Safety Executive;<br />

• Historic Scotland;<br />

• Marine Scotland;<br />

• Scottish Environmental Protection Agency (SEPA);<br />

• Scottish Government;<br />

• SNH;<br />

• Scottish Water;<br />

• Transport Scotland; and<br />

• WDC.<br />

Glasgow City <strong>Council</strong> and <strong>Renfrewshire</strong> <strong>Council</strong> will also be approached by WDC for<br />

comment on the scoping exercise.<br />

4.3.4 Additional EIA consultation<br />

As part of the EIA process, a formal consultation letter was issued to a number of<br />

additional consultees on the 9 th November 2011. The purpose of this consultation<br />

exercise was to provide an opportunity for non-statutory consultees, with a potential<br />

environmental or operational interest in the proposals, to: comment on the proposed<br />

Masterplan; highlight potential environmental issues/ concerns; and provide the project<br />

team with environmental data for the site and its environs. The following consultees were<br />

contacted as part of this exercise:<br />

• Association of Salmon Fisheries Boards;<br />

• British Waterways;<br />

• Civil Aviation Authority;<br />

• Clyde River Foundation;<br />

• Clydebank Local History Society;<br />

Page 19<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

• Clydebank Restoration Trust;<br />

• Clydebelt;<br />

• Clydeport;<br />

• Coal Authority;<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

• Glasgow & Clyde Valley Green Network Partnership;<br />

• National Air Traffic Services (NATS);<br />

• Royal Society for the Protection of Birds (RSPB); and<br />

• Strathclyde Police.<br />

Page 20<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

5. ENVIRONMENTALLY DESIGNATED SITES AND FEATURES<br />

This chapter identifies and describes the designated sites and features located within<br />

5km of the Development site boundary (the Search Area). The location of each of the<br />

sites and features identified is highlighted on Figures 4 to 9, Appendix B.<br />

5.1 European designated sites<br />

5.1.1 Inner Clyde Special Protection Area and Ramsar Site<br />

The River Clyde adjacent to the Development site boundary is designated as part of the<br />

Inner Clyde Special Protection Area (SPA) and Ramsar site. The designated area incurs<br />

into the Development site in two places. The spatial extent of the SPA and Ramsar site<br />

boundary in relation to the Development site is highlighted on Figure 5, Appendix B.<br />

The site designation is due to the importance of the extensive intertidal mudflat habitats<br />

within the River Clyde estuary; which support large numbers of overwintering wildfowl.<br />

The site qualifies as an SPA because it regularly supports an internationally important<br />

wintering population of redshank (Tringa tetanus).<br />

5.1.2 Black Cart SPA<br />

The Black Cart SPA is situated along a 3km reach of the Black Cart Water, a tributary of<br />

the River Clyde. The SPA boundary is located approximately 1.6km south of the<br />

Development site (see Figure 5, Appendix B). The site has been designated because it<br />

regularly supports an internationally important wintering population of Icelandic whooper<br />

swan (Cygnus cygnus).<br />

5.2 UK designated sites<br />

5.2.1 Air Quality Management Areas<br />

The development site is not located within or adjacent to an Air Quality Management<br />

Area (AQMA). Within the Study Area, the closest designated AQMA is located<br />

approximately 4.2km north east of the Development site along the A809 in East<br />

Dunbartonshire (see Figure 7, Appendix B).<br />

5.2.2 Conservation Areas<br />

The Development site is not located within or adjacent to a Conservation Area.<br />

5.2.3 Gardens and Designed Landscapes<br />

There are no Gardens and Designed Landscapes (GDL) within or with views to the<br />

Development site.<br />

Page 21<br />

Final for Issue


5.2.4 Listed Buildings<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

The Titan Crane, located within the Development site, is an A listed structure. There are a<br />

further seven B listed structures and a C(s) listed structure within 500m of the<br />

development site boundary (see Figure 6, Appendix B).<br />

Reference Description/ Address Listing<br />

Category<br />

22986 Municipal Buildings, 49 Dumbarton Road B<br />

22987 Public Library, Dumbarton Road B<br />

22988 Clydebank Riverside Station B<br />

22989 Hall Street former Fire Station B<br />

22990 Church of our Holy Redeemer, Glasgow Road B<br />

22991 2 Sylvania Way South/ Chalmers Street B<br />

22992 11 Hume Street B<br />

22993 Titan Cantilever Crane A<br />

51432 Bruce Street, former Public Baths and Swimming Pool C(s)<br />

5.2.5 National Scenic Areas<br />

There are no National Scenic Areas (NSAs) designated within the Study Area.<br />

5.2.6 Rights of Way<br />

Formal rights of way/ core paths located on or immediately adjacent to the Development<br />

site are highlighted on Figure 8, Appendix B.<br />

The River Clyde adjacent to the development site is classed as a core path on water.<br />

The Clydebank College core path (ref 158) runs along the north bank of the River Clyde<br />

between the Queen’s Dock in the south-east corner of the Development site and the<br />

college.<br />

Core Paths 170 and 178 skirt around the eastern site boundary along Cart Street.<br />

Core Paths 119 and 120, although within 60m of the site boundary, are located along the<br />

canal tow path and will not be directly affected by the proposed Development. The canal<br />

itself is designated as a core path on water.<br />

Core paths Ren/1 and Ren/2 are located on the south bank of the River Clyde, opposite<br />

the Development site. Although the neither of these footpaths would be directly impacted<br />

by the proposed development of the site, both have views into the site and there is<br />

potential for the development to cause visual impacts on the core path users (either<br />

positive or negative).<br />

Page 22<br />

Final for Issue


5.2.7 Scheduled Monuments<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

There are no Scheduled Monuments located within the Development site boundary;<br />

however, the Forth and Clyde Canal (ref 6778) is located approximately 60m north of the<br />

Development site boundary.<br />

5.2.8 Sites of Special Scientific Interest (SSSI)<br />

5.2.8.1 Inner Clyde SSSI<br />

The Inner Clyde SPA is underpinned by the site’s designation as an SSSI. The SSSI<br />

designation relates to the importance of the saltmarsh, swamp and grassland habitats for<br />

non-breeding wintering wildfowl and wading bird populations. The notified features of the<br />

site are:<br />

• Saltmarsh habitat;<br />

• Cormorant (Phalacrocorax carbo);<br />

• Eider (Somateria mollissima);<br />

• Goldeneye (Bucephala clangula);<br />

• Oystercatcher (Haematopus ostralegus);<br />

• Red-breasted merganser (Mergus serrator);<br />

• Red-throated diver (Gavia stellata); and<br />

• Redshank (Tringa totanus).<br />

The Inner Clyde SSSI boundary is coincident with the SPA and Ramsar Site boundary<br />

(see Figure 5, Appendix B).<br />

5.2.8.2 Black Cart SSSI<br />

The Black Cart SPA is also underpinned by its SSSI designation. As with the SPA, the<br />

SSSI designation relates to the site’s importance as an overwintering habitat for Icelandic<br />

whooper swans. The boundary of the Black Cart SSSI is coincident with the SPA<br />

boundary (see Figure 5, Appendix B).<br />

5.3 Local designations<br />

5.3.1 Local Nature Conservation Sites<br />

There are no Local Nature Conservation Sites (LNCS) within or immediately adjacent to<br />

the Development site; however there are several within the Study Area. The closest<br />

LNCS to the Queen’s Quay site is a disused railway corridor located approximately 720m<br />

north-west of the Development site boundary. The proposed Development would have no<br />

impact on this site.<br />

Page 23<br />

Final for Issue


5.3.2 Local Nature Reserves<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

There are currently three Local Nature Reserves (LNRs) within the Study Area (see<br />

Figure 5, Appendix B):<br />

• Gascadden Wood LNR is located approximately 3.6km north-east of the<br />

Development site. There will be no impact on this site as a result of the proposals.<br />

• The Saltings LNR is located approximately 4.2km north-west of the Development<br />

site at Old Kilpatrick. As this site is located downstream of the Development and<br />

comprises flood meadow habitat situated along the north bank of the River Clyde<br />

site, there may be potential for impacts on the ecology and geomorphology of the<br />

site as a result of accidental pollution events/ operational discharges and/ or<br />

changes to the geomorphological response of the river.<br />

• Paisley Moss LNR is located approximately 4.7km south south-west of the<br />

Development site and will not be affected by the proposals.<br />

A new LNR designation is currently being proposed at Newshot Island, which is located<br />

on the south bank of the River Clyde


5.4.4 Salmonid waters<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

The River Clyde adjacent to the Development site is not classified as a Salmonid Water.<br />

Page 25<br />

Final for Issue


6. ECOLOGY & NATURE CONSERVATION<br />

6.1 Introduction<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

The Development has the potential to impact upon the terrestrial and marine habitats and<br />

species of the site and the Inner Clyde Estuary. This chapter presents the proposed<br />

methods that will be used to assess the potential ecological impacts of the Development.<br />

6.2 Consultation<br />

Early consultation has been undertaken with West Dunbartonshire <strong>Council</strong> and SNH<br />

regarding the requirement for a Habitat Regulations Assessment (HRA) to assess the<br />

impacts of the Development on the conservation objectives of the Inner Clyde SPA and<br />

its qualifying interest – Redshank (Tringa totanus). The <strong>Council</strong>, in consultation with SNH,<br />

has determined that an HRA will be required. A stand alone report to inform the HRA will<br />

require to be submitted to the <strong>Council</strong> (the Competent Authority) with the planning<br />

application.<br />

Further consultations regarding the scope of the EIA and the HRA were undertaken with<br />

Scottish Natural Heritage (SNH) on the 14 th October. SNH highlighted that they would<br />

expect the potential for impacts on the following species to be assessed within the EIA for<br />

the Development:<br />

• Inner Clyde SPA redshank;<br />

• Inner Clyde SSSI birds;<br />

• Otters;<br />

6.3 Baseline<br />

• River Clyde fish (salmon).<br />

SNH stated that due to the distance of the south bank redshank roosts from the<br />

development, it may be possible to avoid/ mitigate potential for adverse impacts on<br />

redshank at the source. Using this approach, a revised wintering bird survey would not be<br />

necessary as existing data (e.g. a 2005/6 redshank survey for an adjacent site, WeBS<br />

count) and a few basic assumptions could be relied upon to undertake the assessment.<br />

Additional consultation will be held with bodies such as the Royal Society for the<br />

Protection of Birds (RSPB), The British Trust for Ornithology (BTO) and the Clyde<br />

Ringing Group to determine if additional records (primarily of Redshank adjacent to the<br />

development site) are available.<br />

A number of designated sites for nature conservation are located within and adjacent to<br />

the Development site. These have been described in Chapter 5.<br />

All of the former shipyard buildings have now been demolished and cleared from the site.<br />

During the demolition works the ground was stripped of hardstanding and vegetation<br />

Page 26<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

leaving a bare earth surface. Since the demolition works, the bare earth has been<br />

colonised by early establishing plant species and today the site typically comprises rank<br />

grassland interspersed with short perennial and tall ruderal habitat and large patches of<br />

bare ground. The ecological value of the site is considered to be low.<br />

6.3.1 Existing ecological data<br />

A wintering redshank survey was undertaken in 2005/ 2006 to inform the HRA of the<br />

development at Hospital Gate. The report contains information on the local population<br />

and important habitat adjacent to the site.<br />

If available, additional data will be obtained the RSPB, the BTO and the local ringing<br />

group.<br />

The data gathered from these sources will be used to inform the ecological baseline<br />

description of the site.<br />

6.4 Potential receptors<br />

The proposed development is likely to impact (positively or negatively) on the following<br />

ecological receptors:<br />

• The Inner Clyde SPA and the qualifying interests (Redshank);<br />

• The Inner Clyde SSSI and the qualifying interests(see section 6.3);<br />

• Otter (Lutra lutra); and<br />

• Salmon (Salmo salar).<br />

As the Black Cart SPA is 1.6km from the proposed development, it is deemed that the<br />

proposed development will not have an impact on the qualifying interest of the SPA.<br />

6.5 Key issues<br />

The key issues to be considered with respect to the ecological assessment are:<br />

• The conservation objectives of the Inner Clyde SPA<br />

• The status of the otter within the development site;<br />

• The potential impact of the proposed development to migrating salmon, especially<br />

during the peak period of March – May (when young salmon are leaving the rivers<br />

as smolts) and July (when adults are returning to the rivers); and<br />

• Cumulative impacts of the proposed development with other, neighbouring<br />

developments.<br />

Page 27<br />

Final for Issue


6.6 Proposed studies for EIA<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

The ecological baseline will be established through a combination of desk study and field<br />

surveys. Key to the assessment process will be the collation of historical ecological<br />

records through a desk study. Existing data and information to determine the known<br />

presence of nationally notable or protected species, habitats and/or designations will be<br />

sought from the following sources (and others as appropriate):<br />

• The National Biodiversity Network;<br />

• UK Biodiversity Action Plan;<br />

• SNH’s Sitelink;<br />

• BTO WeBS data;<br />

• RSPB;<br />

• The Dunbartonshire Local Biodiversity Action Plan; and<br />

• The West Dunbartonshire Local Plan.<br />

Field studies on the site will be limited to an Extended Phase 1 Habitat Survey and an<br />

otter survey.<br />

The Extended Phase 1 Habitat Survey will be undertaken to concisely describe the nature and<br />

extent of the habitats on the site with the objective of producing:<br />

• a habitat map;<br />

• a constraints map for employment at the design stage of the development;<br />

• target notes that describe the habitats and locate and describe point features too small<br />

to map;<br />

• a plant species list, including the detection of protected species; and<br />

• evidence for the potential or definitive presence of notable fauna.<br />

The survey will be undertaken according to the standard method developed by the Joint<br />

Nature Conservancy Committee (JNCC) 3 as well as the best practice guidelines produced by<br />

the Institute of Ecology and Environmental Management 4 .<br />

The otter survey will be carried out in accordance with standard methods 5 .<br />

The methods used to undertake the Ecological Impact Assessment (EcIA) will be based<br />

on Institute of Ecological and Environmental Management (IEEM) Guidelines 6 . The EcIA<br />

3<br />

JNCC ,2003. Handbook for Phase I habitat survey: a technique for environmental audit<br />

(revised reprint). England Field Unit, Nature Conservancy <strong>Council</strong>.<br />

4<br />

IEEM guidance on undertaking surveys. Available on-line at:<br />

http://www.ieem.net/surveymethods.asp.<br />

5<br />

Chanin, P (2003). Monitoring the Otter Lutra lutra. Conserving Natura 2000 Rivers.<br />

Monitoring Series No.10. English Nature, Peterborough.<br />

6<br />

Institute of Ecology and Environmental Management (IEEM) Guidelines of Ecological<br />

Impact Assessment in Britain and Ireland: Coastal and Marine<br />

(http://www.ieem.net/marine-ecia/introduction.html).<br />

Page 28<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

will seek to evaluate habitats and species and place them into context based on<br />

consultation and published guidance. The source, nature and magnitude of each impact<br />

will be identified and an assessment of the significance of the impact on valued ecological<br />

receptors will be made.<br />

Page 29<br />

Final for Issue


7. LANDSCAPE & VISUAL<br />

7.1 Introduction<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

A Landscape and Visual Impact Assessment (LVIA) will be undertaken as part of the EIA<br />

of the Development to determine the impact of the proposals on landscape character and<br />

key views of the site.<br />

7.2 Consultation<br />

An initial consultation response on the scope of the LVIA has already been received from<br />

Scottish Natural Heritage and it is expected that the comments made will be repeated<br />

formally within the <strong>Council</strong>’s written Scoping Opinion. The following key points were<br />

raised by SNH during the consultation exercise:<br />

“LANDSCAPE OBJECTIVES<br />

We consider that the creative challenge is how the development would incorporate a<br />

robust and high quality green network (contributing to the wider green network<br />

beyond) which enhances local landscape features and particularly the connectivity of the<br />

Clyde waterfront for people and wildlife. This should ensure that ‘personality’ in the<br />

landscape is an integral part of the development design, meeting Scottish Government<br />

objectives for increased quality of place. Relevant guidelines are in PAN 83- Good<br />

practice advice on master planning, and in the Government publications “Designing<br />

Places” and "Designing streets”.<br />

DETAILS RE LVIA<br />

7.3 Baseline<br />

Analysis within the LVIA should include landform, views in and out, historical features,<br />

surrounding built forms, local architectural styles and materials, and existing and potential<br />

connections with the Clydebank townscape, the riverside, and adjoining sites. It should<br />

highlight positive aspects of the location and visual relationships, which the design should<br />

strive to relate to. It should also take account of the following:<br />

• the site forms a key part of Clydebank's urban boundary, and its landscape<br />

character has a rural element, visually influenced by the farmland (and wooded<br />

drumlins behind) south-west of the Clyde;<br />

• the site is set within a complex landscape defined by strong topographical<br />

contrasts, vegetation patterns (including absence!) and man-made divisions created<br />

by transportation corridors.”<br />

The Development site is a particularly urban area and it is expected that this type of site<br />

would be fairly simple to assess; however, the previous shipyard was home to widely<br />

diverging areas. It will be necessary to establish, and consider, the landscape and urban<br />

Page 30<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

characters of each of the constituent components of the proposed development area.<br />

For the purposes of describing the baseline the site is split into four areas:<br />

• Area 1: the western end of the Development site facing the river;<br />

• Area 2: Queen’s Dock;<br />

• Area 3: Supermarket plot; and<br />

• Area 4: East of Queen’s Dock.<br />

7.3.1 Area 1: West end<br />

Area 1 comprises the western portion of the Development site from the site boundary<br />

east to Queen’s Dock. It is separated from the rest of Clydebank by the buildings along<br />

Glasgow Road; however, it can clearly be seen from both the River Clyde and the south<br />

bank. As in the days when the shipyard was operational, it will be a key part of the views<br />

of those going “doon the water” and will need to be assessed as a key feature on the<br />

water route from Glasgow to Greenock.<br />

At the same time, there is a need to open up views from Clydebank to the river. The<br />

opportunity for views from the town out to the river is a key element of the potential of this<br />

development.<br />

7.3.2 Area 2: Queen’s Dock<br />

Area 2 comprises the Queen’s Dock basin. This was originally formed to launch the large<br />

ocean liners and so has a strong historic context. It is a very insular part of the site which<br />

can be seen from both the river and the south bank.<br />

The large Titan Crane, an important attraction and also an important landmark, is located<br />

in the next to the basin and the Queen’s Dock now has major potential as a tourist<br />

attraction and as a focal point for the whole development.<br />

There are opportunities to link Area 2 visually and physically with the rest of Clydebank.<br />

7.3.3 Area 3: Supermarket plot<br />

The proposed location for the supermarket is on the main Glasgow Road. This is the<br />

principal road link through Clydebank connecting Glasgow and Dumbarton. The<br />

supermarket will impact on the perception of Clydebank held by all of those who pass<br />

along this route. It will also affect the sense of place experienced by the residents of<br />

Clydebank.<br />

7.3.4 Area 4: East of Queen’s Dock<br />

Area 4 encompasses the parcel of land south of Area 3 between the Queen’s Dock and<br />

Clydebank College. It has a different character from the other areas described and<br />

provides a crucial link between Clydebank College, the supermarket site, and the<br />

Queen’s Dock basin.<br />

Page 31<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

The four areas all have a different landscape character and each plays a different role in<br />

linking the wider Clydebank to the River Clyde. At the same time, they are being<br />

developed as one unit, so the combined impact is important.<br />

7.3.5 Potential receptors<br />

Within the Development site each component area will generate its own receptors. The<br />

receptors will be established by production of a computer-generated Zone of Visual<br />

Influence plan and through detailed site visits to establish which specific viewers are the<br />

receptors, how sensitive the view is that they have, and what potential impact on that<br />

view that the proposed Development might have.<br />

The main the receptors are likely to be:<br />

• Clydebank;<br />

• users of the River Clyde;<br />

• the south bank; and<br />

• the Titan Crane.<br />

It is clear that the potential for visual links to the river, the shopping centre and other key<br />

locations within Clydebank need to be explained. The impact of the Development on the<br />

Glasgow Road and the perception of local residents and persons passing through the<br />

town will be considered.<br />

The River Clyde is, as yet, an untapped recreational and tourist resource. As this<br />

becomes a more active area, it is important that Clydebank contributes positively to this<br />

opportunity.<br />

The south bank of the river is mainly rural with Erskine set back from the edge of the river<br />

and largely out of view. Although the receptors are not likely to be particularly sensitive, it<br />

is still important that they should be considered.<br />

It is essential to ensure that the proposed development does not affect the majestic<br />

setting of the Titan Crane.<br />

7.4 Key issues<br />

The possibility of bringing urban Clydebank closer to the River Clyde is a key issue for<br />

this development. The town was established because of the river and was made famous<br />

around the world because of its connection to it. If this development can re-establish a<br />

visual and physical link between Clydebank and the River Clyde it will be a major<br />

contribution to the perception of the town.<br />

The Glasgow Road is the main transport link through and to the town. Any development<br />

along this route must be seen to contribute to its quality. The development would also<br />

impact on the three main arterial routes north into the conurbation of Clydebank. The<br />

impact of the Development on these routes will be closely considered within the EIA.<br />

Page 32<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Clydebank’s river frontage stretches from Clydebank College in the east to the Golden<br />

Jubilee Hospital in the west. The proposed development covers a major part of that<br />

stretch, so this must also be considered as a key issue for assessment.<br />

The Titan Crane has now become established as an important part of the town. It is<br />

important that views of the crane are not affected in either short or long distance and that<br />

its setting retains its current prominence.<br />

7.5 Proposed studies for EIA<br />

The LVIA will be carried out in accordance with the “Guidelines for Landscape and Visual<br />

Impact Assessment second edition”.<br />

7.5.1 Desk study<br />

A full computer-generated Zone of Visual Influence plan covering a 30km diameter area<br />

based on Area 1 will be prepared. A further similar plan will be prepared based on Area<br />

3. These plans will establish where the potential receptors are for not only Areas 1 and 3<br />

but also Areas 2 and 4.<br />

7.5.2 Field study<br />

It will be necessary to look carefully at the constituent areas of the Development site to<br />

establish their landscape and urban character.<br />

Following establishment of the baseline, the wider area will be considered taking account<br />

of the ZVI plan. The ZVI plans are based on the Ordnance Survey maps and relate to<br />

contours and they assume no building or tree cover. It is therefore necessary to<br />

undertake detailed field studies to establish whether a view is present.<br />

Where a view is established as present, an assessment of its sensitivity will be made and<br />

the magnitude and significance of potential impacts on it will be determined.<br />

Page 33<br />

Final for Issue


8. WATER RESOURCES<br />

8.1 Introduction<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

The Water Resources chapter of the EIA will consider the potential impacts of the<br />

proposed Development upon the water environment. In addition, it will identify the<br />

potential for existing groundwater contamination conditions that may affect sensitive<br />

receptors during construction and operational phases.<br />

8.2 Consultation<br />

8.3 Baseline<br />

Consultation will be held with relevant stakeholders such as the SEPA, WDC, Scottish<br />

Water and the British Geological Society (BGS) in order to obtain all relevant water<br />

resource quality and water use related information. This may include information such<br />

as:<br />

• Key aquifers and water bodies which should be safeguarded,<br />

• Current water quality classification status and associated ecological potential,<br />

These discussions will also be informed by pre-planning consultations undertaken as part<br />

of the development of the Queens Quay area.<br />

8.3.1 Surface waters<br />

The Queens Quay development site covers an area of some 23.6 ha and is situated on<br />

the northern hinterland of the River Clyde.<br />

The southern boundary of the site extends approximately 1.1km along the bank of the<br />

River Clyde. This boundary and its river front structures generally comprise a combination<br />

of quay walls and rock armour type embankments that extend into the existing Queens<br />

Quay Flotation Basin. The river channel width adjacent to the site at mean low water<br />

springs is approximately 280m.<br />

The River Clyde flows east to west along the site boundary. Through review of the SEPA<br />

water quality classification data it can be identified that the River Clyde is classed as<br />

‘transitional waters’ at this location. Transitional waters are defined as bodies of surface<br />

water in the vicinity of river mouths that are partially saline in character as a result of their<br />

proximity to coastal waters but which are substantially influenced by freshwater flows.<br />

This classification identifies that the section of the River Clyde adjacent to the<br />

Development site is influenced by both fresh and coastal waters.<br />

Page 34<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

No other known surface water bodies are located within or immediately adjacent to the<br />

Development site; however, other water bodies can be noted within the general vicinity of<br />

the site:<br />

• The River Cart (downstream of the confluence between the Black Cart and the White<br />

Cart) flows into the River Clyde from the south approximately 430m upstream of the<br />

development site.<br />

• A second unnamed watercourse/ channel flows north-westwards along the line of the<br />

former River Clyde channel, south west of Newshot Island located adjacent to the<br />

southern embankment circa 1.3km downstream.<br />

• The Forth and Clyde Canal is present circa 120m to 800m north of the site. Given the<br />

difference in level and distance from the site in it not expected that the Canal will be<br />

directly affected by the proposals. Historically, a junction canal provided a link<br />

between the Forth and Clyde Canal and the River Clyde that ran through the eastern<br />

edge of the Development site but this has been infilled.<br />

8.3.1.1 Water quality<br />

Waterbody water quality classifications are defined by SEPA under the River Basin<br />

Management Plan (RBMP) database. This information also details target water quality<br />

objectives for a range of target years as defined in support of the Water Framework<br />

Directive (WFD).<br />

The RBMP database defines various water bodies and is based on an ecological<br />

classification system with five quality classes. These classifications are further split into<br />

sub sections to define areas which are heavily modified or have been artificially altered.<br />

The classification system has been devised in accordance with European Union (EU) and<br />

UK guidance and is underpinned by a range of biological quality elements supported by<br />

chemistry, hydrology (changes to levels and flows) and morphology (changes to the<br />

shape and function of water bodies).<br />

The classification of a length of river is calculated from the monitoring point and the<br />

results are then broken down into the following main categories:<br />

• High<br />

• Good<br />

• Moderate<br />

• Poor<br />

• Bad<br />

Page 35<br />

Final for Issue


8.3.1.1.1 River Clyde (Inner Clyde Estuary)<br />

8.3.1.1.2 Black Cart<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

SEPA has classified the section of the Inner Clyde Estuary as having an overall status of<br />

Moderate ecological potential with Medium confidence in 2008.<br />

SEPA also set environmental objective targets for a range of RBMP timeframes cycles.<br />

These are specific to the Inner Clyde Estuary and are detailed in the table below.<br />

Year 2015 2021 2027<br />

Status Moderate Moderate Good<br />

Under the WFD, the long term goal under the WFD is to achieve ‘good’ ecological<br />

potential by 2027.<br />

The lower reach of the Cart is included within the Inner Clyde Estuary reach and there is<br />

no separate classification for this reach.<br />

8.3.1.1.3 Unnamed watercourses<br />

No separate classification is made for these small tributaries.<br />

8.3.1.1.4 The Forth and Clyde Canal<br />

Designated as an AWB, the Forth and Clyde (Mountblow to Maryhill) is currently<br />

classified as having ‘Good ecological potential’ with medium confidence.<br />

8.3.2 Hydrogeology<br />

BGS mapping indicates that the underlying solid geology of the area comprises rocks of<br />

the Lower Limestone Formation of Carboniferous age, consisting predominantly of<br />

sandstones, siltstones, mudstones with sub-ordinate siltstones, ironstone and occasional<br />

marine limestones and coal horizons. Bedrock is classified as a minor aquifer.<br />

The shallow aquifer beneath the site is recorded within the alluvial sand and gravel<br />

deposits. The glacial till deposits overlying bedrock act as an aquitard restricting recharge<br />

to the underlying bedrock aquifer. The bedrock and sand and gravel aquifers have been<br />

assigned to the Clydebank and Kirkintilloch Drinking Water Protection Zone.<br />

Inferred groundwater flow direction is southwards towards the River Clyde. Previous<br />

groundwater monitoring results indicated groundwater fluctuations between monitoring<br />

visits indicating that the site is likely to be subject to tidal fluctuation in groundwater level.<br />

8.3.2.1 Aquifer productivity<br />

In order to assist in implementing the requirements of the Water Framework Directive<br />

(WFD) to characterise all groundwater bodies, the SEPA and the BGS have produced<br />

maps of aquifer productivity for groundwater bodies in bedrock and superficial deposits<br />

Page 36<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

throughout Scotland, together with supporting technical documentation 7 . All<br />

Carboniferous formations (except mudstones and the Passage Group) have been<br />

assigned a moderate productivity rating. Carboniferous mudstones are assigned a low<br />

productivity rating. Groundwater flow within these Carboniferous rocks is predominantly<br />

through fractures and other discontinuities. Intergranular flow may be important.<br />

Alluvial sand and gravel is assigned a high productivity rating. Alluvial clays and the low<br />

and moderate permeability glacial tills of Central Scotland are classified as non-aquifers.<br />

8.3.2.2 Water quality<br />

Within SEPA’s RBMP groundwater within bedrock and localised sand and gravel aquifers<br />

in the vicinity of the site is assigned to overall status classification ‘poor’ based on its poor<br />

chemical quality, which is attributed to diffuse pollution impacts associated with chemical<br />

production and historical mining activity.<br />

8.3.3 Flood risk<br />

A Flood Risk Assessment (FRA) for the Queens Quay development area was undertaken<br />

on behalf of URS Corporation Ltd by Dr JF Riddell in February 2006 8 . This identified that<br />

the critical flood risk to the Development site is flooding associated with extreme coastal<br />

and tidal events and not from high fluvial flow within the River Clyde.<br />

Estimates of coastal and tidal flood levels during extreme flood events at Queens Quay<br />

are:<br />

• 4.8m AOD during the 200 year event<br />

• 5.1m AOD during the 500 year event.<br />

These figures are based on still water levels and do not account for wave action or<br />

allowance for climate change.<br />

Based on these figures and topographic data available for the site, there is localised area<br />

of the brownfield site which sits below the estimated 1 in 200 year flood level. This portion<br />

of the site will therefore be defined as at flood risk. As the duration of flooding events<br />

would be linked to tidal movements, flooding of the site is unlikely to last more than an<br />

hour.<br />

Flood risk from tidal and coastal flooding is likely to be mitigated at the site as part of the<br />

proposed Development. This may include land raising sections of the site which currently<br />

sit below the 1 in 200 year event flood level and has been addressed in the FRA.<br />

No other flooding issues were identified within the FRA for the Queens Quay<br />

Development.<br />

7 Macdonald AM, Ball DF, and O Dochartaigh BE (2004). A GIS of Aquifer Productivity in Scotland:<br />

Explanatory Notes. British Geological Survey Commissioned Report CR/04/047W.<br />

8 Dr John Riddell. 2006. Proposed Development, Queens Quay, Clydebank. Flood Risk Assessment.<br />

Page 37<br />

Final for Issue


8.4 Potential receptors<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

The water environment receptors include:<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

• River Clyde (downstream of the site and upstream to the tidal limit);<br />

• The River Cart (within its tidal limit); and<br />

• groundwater beneath the site.<br />

8.5 Key issues<br />

The proposed Development has the potential to result in a number of effects on water<br />

quality. Water quality effects will relate to the exposure to/ prevention of exposure to<br />

pollutants.<br />

During the construction works there is potential for works activities to cause pollution of<br />

soils, surface waters and groundwaters. The release of potentially polluting material (e.g.<br />

silts, organics, salts, concrete, fuels, greases, oils and other chemicals/ compounds)<br />

during the construction phases has the potential to result in significant adverse impacts to<br />

the water environment. The magnitude and significance of such an event will depend<br />

upon the scale of the pollution incident and the type of pollutant released.<br />

Given the immediate proximity of the works to the River Clyde, if appropriate measures<br />

are not implemented then polluting material may directly or indirectly enter the Inner<br />

Clyde estuary. Pollutants can also result in adverse impacts on aquatic and riparian flora<br />

and fauna.<br />

Due to the large channel volume of the River Clyde adjacent to the site and its tidal<br />

nature, there is liable to be immediate dilution of any polluting material entering the<br />

watercourse. The result is that a small magnitude polluting event would not be anticipated<br />

to have a significant effect on the water quality of the Inner Clyde Estuary. Having said<br />

this, there is potential for polluting material to be carried upstream and downstream and<br />

into the smaller tributaries of the Clyde. In these smaller watercourses, the magnitude of<br />

polluting effects on water chemistry and aquatic/ riparian habitats could potentially be<br />

much greater.<br />

The hydraulics and hydromorphology of the River Clyde will not be significantly affected<br />

by the proposed Development. Works to the river banks and river front structures will<br />

comprise a like for like replacement of the existing quay walls and the only direct water<br />

inputs from the site to the River Clyde will be routed via an appropriately designed<br />

Sustainable Urban Drainage System (SUDS).<br />

8.6 Proposed studies for EIA<br />

A description of the water environment baseline (hydrology, flood risk, water quality and<br />

hydrogeology) will be provided within the ES. This baseline will be derived by undertaking<br />

a detailed desk study and review of water quality, flood risk and hydrogeomorphological<br />

data available for the site and the Inner Clyde Estuary. A review of relevant ground<br />

Page 38<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

investigation reports will be undertaken to assess the potential for contamination and to<br />

derive baseline groundwater quality across the site.<br />

Consultation will be carried out with SEPA, WDC, Scottish Water and the BGS in order to<br />

obtain all relevant water resource quality and water use related information.<br />

The desk-based study will be supplemented by a site walkover to assess the current<br />

condition of the site and to obtain more information on potential site sources of<br />

contamination. During the site walkover detailed site notes, photographs and sketches<br />

will be taken and used to compliment the desk based information. The data obtained will<br />

include assessment of general site conditions, with particular focus on identification of<br />

waterlogged areas and obvious signs of contamination (e.g. oily sheen).<br />

A full assessment of the potential for the scheme to impact upon the identified water<br />

resources will be made and reported within the ES. The assessment will be based on the<br />

description of the proposed works, phasing and construction methods available at the<br />

time of the assessment. Risk to the water environment (surface waters) will be assessed<br />

with respect to Environmental Standards derived for the protection of transitional waters.<br />

Where required, the ES will outline mitigation to minimise the effects of any adverse<br />

impacts identified and a residual impact assessment will be made.<br />

Page 39<br />

Final for Issue


9. GEOLOGY & SOILS<br />

9.1 Introduction<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

This geology and soils chapter of the ES will consider the potential for the proposed<br />

Development to affect the soils and bedrock geology underlying the site. The<br />

Development is unlikely to result in significant long term contamination sources and<br />

therefore the EIA will relate primarily to the effects of disturbance to the ground and<br />

groundwater by construction activities and possible contamination that may be mobilised<br />

as a result.<br />

The chapter will describe the existing soil and groundwater contamination conditions on<br />

the site and assess the potential for contaminated materials to affect sensitive receptors<br />

during the construction and operational phases of the development. Potential waste<br />

management issues will also be addressed within this chapter of the ES. Issues<br />

surrounding contamination of the water environment will be referred to as necessary;<br />

however, a separate chapter of the ES will deal specifically with water resources.<br />

9.2 Ground Investigation<br />

Between 2001 and 2007, a number of Phase 1 and Phase 2 ground investigations were<br />

undertaken across the Development site, with some areas of the site being investigated<br />

in more detail than others. The main objective of these investigations was to determine<br />

the overall ground conditions across the site in relation to foundation design, earthworks<br />

and soil and groundwater contamination.<br />

Following on from the ground investigation, contamination assessments of the<br />

Development site were undertaken and environmental remediation strategies for specific<br />

areas within the wider Queens Quay site were prepared. These remediation strategies<br />

were based upon a development comprising predominantly residential property with a<br />

minor element of commercial development.<br />

9.3 Consultation<br />

9.4 Baseline<br />

9.4.1 Geology<br />

As part of the initial Phase 1 studies, WDC was consulted regarding their records on<br />

potential contamination sources on site. Further consultations with the contaminated land<br />

officer at WDC took place throughout various phases of investigations.<br />

The ground investigation information indicates that the geology of the site comprises<br />

man-made deposits overlying natural superficial deposits. Natural superficial deposits are<br />

recorded to comprise alluvial deposits (sand with lenses of clay and silt and sands and<br />

gravels) overlying glacial till deposits. Bedrock described as mudstone was encountered<br />

at depths between 24.8m and 46.65m bgl. BGS geological mapping indicates that the<br />

majority of the site is expected to be underlain by solid strata representative of the<br />

Page 40<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Lawmuir Formation comprising of sandstone with mudstone and a few thin limestones<br />

and coal seams.<br />

9.4.2 Groundwater<br />

Standpipe monitoring on the site records groundwater at depths between -0.91mAOD<br />

and 1.69mAOD, which is representative of groundwater at depths in excess of 3m below<br />

ground level. The groundwater below the site is believed to be tidal.<br />

9.4.3 Site history<br />

A review of the available historical Ordnance Survey maps for the site was carried out<br />

that highlighted various potentially contaminating activities had been undertaken on the<br />

site. The plans indicate that the site has been utilised as a shipyard for passenger and<br />

military vessels since 1871. The shipyard experienced several phases of expansion and<br />

reconstruction from 1899 when the site was identified as Clydebank Engineering and<br />

Shipbuilding Works. Activities on site included saw mills, joiner shops, boiler works,<br />

coppersmiths, coal stores, foundry, railway sidings and gas works. Prior to final closure<br />

part of the site was used for Oil Rig fabrication. All of these previous activities could have<br />

contributed to potential sources of contamination.<br />

9.4.4 Site clearance<br />

As part of the demolition works, parts of the site have been cleared of known<br />

underground structures and any obstructions encountered; however, there are areas<br />

awaiting further clearance works. A number of stockpiles from the demolition works are<br />

also known to be present on site and these comprise various materials (demolition<br />

materials, organic materials, and hydrocarbon contaminated materials).<br />

9.5 Potential receptors<br />

Given the mixed nature of the proposed development (as described in Chapter 2), the<br />

following potential sensitive receptors have been identified:<br />

• construction and maintenance staff,<br />

• residents within neighbouring areas,<br />

• future site users (residents, employees, visitors to the site),<br />

• buildings,<br />

• water supply pipes, and<br />

• the water environment (River Clyde and groundwater beneath the site).<br />

The receptors will be described in more detail within the EIA and will be characterised in<br />

terms of their sensitivity.<br />

Page 41<br />

Final for Issue


9.6 Key issues<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

The key issues to be considered with respect to the geology and soils chapter of the EIA<br />

include:<br />

• the extended industrial history of the site;<br />

• existing underground structures and services;<br />

• current condition and nature of waste stockpiles present on site;<br />

• the potential for any contamination present within the proposed development site to<br />

impact upon the Firth of Clyde;<br />

• the potential for residual contamination known to be present on site to impact upon<br />

future site users and adjacent land; and<br />

• the potential for ground gas generation across the site with potential for impacts on<br />

buildings and people on site.<br />

9.7 Proposed studies for EIA<br />

A desk-based assessment will be carried out to determine the baseline geology and spoil<br />

conditions for the site. No additional intrusive ground investigations will be carried out at<br />

the site to inform the EIA.<br />

A number of intrusive ground investigations have been undertaken across the site and it<br />

is proposed that the desk study will include a review of the site investigation reports<br />

produced for these studies, including:<br />

• URS Thorburn Colquhoun (now URS) – Clyde Riverside UiE Site, Stage 1<br />

Investigation, May 2001<br />

• URS Thorburn Colquhoun (now URS) – Clyde Riverside UiE Site, Stage 2<br />

Investigation, September 2001<br />

• URS Thorburn Colquhoun (now URS) – Clyde Riverside UiE Site, Stage 3<br />

Investigation, September 2001<br />

• URS - Queens Quay, Clydebank, Report on Ground Contamination November 2003<br />

(revised January 2004)<br />

• URS - EIA Scoping Report, Final, August 2005, Report ref. xxxxyyyy/GLRP0001<br />

• URS - Queens Quay Residential Phase 1 – Cart Street Hydrocarbon Hotspot<br />

Delineation and Removal Letter Report, 29 February 2008, URS Report Ref.<br />

49335215/GLRP0002<br />

Page 42<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

• URS - Queens Quay Residential Phase 1 – Additional Soils Characterisation Letter<br />

Report, 10 June 2008, URS Report Ref. 49335215/GLRP0002<br />

• URS - Queens Quay Residential Phase 1 – Stockpile Material, 09 September 2008,<br />

URS Letter Report Ref. 49335215/GLLT1005<br />

• URS - Queens Quay Residential Phase 2, 3 and Affordable Housing - Stage 2 Site<br />

Investigation Report, Final, August 2006, URS Report ref. 44762902 / GLRP0452<br />

• URS - Queens Quay Residential Phase 2 – Peat Removal Works Summary,<br />

December 2007, URS Ref. 49335215/GLRP0007<br />

• URS - Queens Quay – Organic Stockpile Characterisation Letter Report, August<br />

2008, URS Report Ref. 49335215/GLRP0013<br />

• Queens Quay – Clydebank, Hydrocarbon Contaminated Soils, May 2006, URS<br />

Letter Report Ref. 447629021/GLLT0983<br />

• Queens Quay – Clydebank, Hydrocarbon Contaminated Soils, may 2006, URS<br />

Letter Report Ref. 447629021/GLLT0983<br />

• Queens Quay Boilermakers Social Club, Stage 2 Site Investigation Report, February<br />

2007, URS Report Ref.<br />

• Queens Quay, Phase 1 Residential - Remediation Strategy, Final, August 2007,<br />

URS Report Ref. 44762902/GLRP0463<br />

• Queens Quay Residential Phase 2 and 3 - Remediation Strategy, Final, February<br />

2008, URS Report Ref. 49335215 /GLRP0005<br />

• Queens Quay Residential Affordable Housing - Remediation Strategy, Final,<br />

February 2008, URS Report Ref. 49335215 /GLRP0003<br />

The desk-study will also take into account historical and existing operations within the<br />

development boundary. In addition, a site walkover will be undertaken to assess current<br />

condition of the site and to obtain more information on potential site sources of<br />

contamination, if appropriate. During the site walkover detailed site notes, photographs<br />

and sketches will be taken and used to compliment the desk based information. The data<br />

would include assessment of general site condition, features present on site (e.g.<br />

stockpiles), overgrown invasive vegetation (knotweed etc.) and other geomorphological<br />

features pertinent to the proposed development.<br />

The main objective for the desk-based impact assessment will be to identify viable<br />

contaminant pathways to sensitive receptors on and in the vicinity of the site and to<br />

assess the potential significance and magnitude of the effects of contaminated soil on<br />

these receptors. The potential for contaminated land and the risk assessment will be<br />

identified in accordance with the relevant legislation and guidance.<br />

Page 43<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Where significant adverse environmental impacts are identified, remediation strategies<br />

will be incorporated as mitigation measures. Remediation strategies are already in place<br />

for some areas of the wider Queens Quay site and these will be updated to reflect<br />

changes in the proposed development layout. Conceptual site models (CSMs) previously<br />

prepared in relation to the wider site area may have to be redefined to reflect the altered<br />

layout and nature of the Masterplan. The residual impacts on ground conditions at the<br />

site will then be assessed.<br />

Page 44<br />

Final for Issue


10. TRAFFIC<br />

10.1 Introduction<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

A Transport Assessment (TA) is being prepared for the proposed Development and a<br />

report on the findings of this assessment will be submitted to WDC with the planning<br />

application as part of a package of supplementary information. The TA report will be<br />

submitted as a stand alone document and will not form part of the ES; however, a<br />

summary of the findings of the TA report will be provided within the ES.<br />

10.2 Traffic Assessment method<br />

The purpose of the TA being undertaken is to appraise the existing site accessibility from<br />

the surrounding road networks (over the full range of traffic modes) and will identify<br />

impacts associated with the day-to-day traffic movements associated with the<br />

Development.<br />

The project team is in ongoing dialogue with the WDC Roads Officers with respect to the<br />

development of the TA and the scope of the TA has been broadly agreed with them.<br />

The TA will generally follow the advice set out in the Scottish Government publication<br />

‘Transport Assessment and Implementation – a Guide’ 9 and will be developed with<br />

reference to current national and local policies including adopted transport polices and<br />

national Scottish Planning Policy (SPP).<br />

The key aims of the TA will be:<br />

• to set out the baseline conditions (including pedestrian and cycle networks, public<br />

transport availability and local road networks) taking into account the influence<br />

and scale of approved (committed) development in the area;<br />

• to assess the baseline conditions and report on the impact of the development in<br />

comparison to the ‘committed’ base situation; and<br />

• to provide an outline Travel Plan for the scheme.<br />

It is proposed that the approach to traffic assessment within the TA will utilise a technique<br />

known as microsimulation modelling. A series of traffic surveys have been undertaken,<br />

principally along the Glasgow Road corridor, and these will be used to help build the<br />

traffic model and inform the assessment. Validation of the traffic modelling will be<br />

undertaken in line with criteria outlined within the Department for Transport publication<br />

‘Design Manual for Roads and Bridges’.<br />

9 Scottish Executive. August 2005. Transport Assessment and Implementation – a Guide.<br />

Page 45<br />

Final for Issue


10.2.1 Guidance and significance criteria<br />

10.2.1.1 Guidance<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

The significance of likely traffic impacts associated with the proposed Development has<br />

been determined with reference to the following published guidance:<br />

• Institution of Highways and Transportation (IHT). October 1994. Guidelines for<br />

Traffic Impact Assessment (the IHT Guidelines);<br />

• Scottish Government. August 2005. Transport Assessment and Implementation:<br />

A Guide. (Scottish Government Guidelines); and<br />

• Institute of Environmental Assessment (IEA). 1993. Guidelines for the<br />

Environmental Assessment of Road Traffic (the IEA Guidelines).<br />

10.2.1.2 Significance criteria<br />

The criteria used to determine the significance level of traffic associated with the<br />

proposed Development and the need for traffic to be assessed as part of the EIA have<br />

been taken from the Guidance <strong>documents</strong> listed above. The specific local characteristics<br />

of the road network have also been considered using professional judgement, experience<br />

of similar developments, and committed development information supplied by WDC.<br />

The IHT Guidance makes the following statement on the need for the predicted traffic<br />

impacts of a proposed development to be included within an environmental assessment:<br />

“In general, the impact of marginal changes in traffic on the<br />

perceptible environment is less sensitive than changes in traffic flows<br />

at junctions in the surrounding network. It is recommended that the<br />

following criteria should be adopted to assess whether particular links<br />

in the network should be subject to environmental assessment:<br />

- Include traffic links where traffic flows will increase by more than<br />

30% in the opening year as a result of development traffic;<br />

- Include any other sensitive areas affected by traffic increases of at<br />

least 10%, or similar changes in HGV movements.”<br />

The Scottish Government Guidelines states the following in relation to perceived traffic<br />

impacts and the capacity of road networks:<br />

“The significance of a traffic impact depends not only on the<br />

percentage increase of traffic but the available capacity. A 10%<br />

increase on a lightly trafficked route may not be significant, whereas a<br />

1% increase on a congested motorway will be. “<br />

The IEA Guidelines make reference to the above statements as two broad rules that can<br />

be used as a screening process to delimit the scale and extent of a traffic assessment.<br />

Increases in traffic flow which amount to less than 10% of the baseline are generally<br />

Page 46<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

considered to have a negligible impact on the road network given that daily fluctuations<br />

equal to this figure can occur.<br />

10.3 Consultation<br />

10.4 Baseline<br />

In addition to consultation with the WDC Roads Department on the scope of the TA, the<br />

project team has also consulted with the WDC Planning Department. This consultation<br />

has highlighted that there are a number of committed developments in the area (a list of<br />

which is provided in Chapter 3 of this report). The transport effects of these committed<br />

developments will be considered within the TA.<br />

Consultation with the WDC Roads officers will continue to be held as the scheme<br />

progresses.<br />

It has been agreed with the WDC Planning and Roads Departments that the baseline for<br />

the TA should comprise the existing baseline traffic together with the traffic scenarios<br />

generated by the committed developments identified in Section 10.2 above. Of particular<br />

relevance is the extant planning permission for the Queen’s Quay site and its associated<br />

traffic scenario.<br />

The TA will focus on the degree to which the proposed Development will add or subtract<br />

traffic on the network in comparison to the committed traffic baseline.<br />

10.4.1 Road network<br />

The Development is located off the A814 Glasgow Road in Clydebank, which borders the<br />

Site to the north. Vehicular access to and from the site will be taken from the existing site<br />

access points off Cable Depot Road to the west and Cart Street to the east. Previous<br />

traffic studies have considered the impact of development on the A814 from Agamemnon<br />

Street in the north to North Elgin Street in the south and the present Transport work<br />

replicates that approach.<br />

10.4.2 Existing baseline<br />

In order to establish existing baseline traffic data for the TA, a range of classified traffic<br />

turning count surveys at seven separate locations along the A814 corridor as agreed with<br />

WDC were carried out. An independent expert data collection consultancy (Streetwise)<br />

carried out these surveys using video monitoring equipment during peak periods on the<br />

1 st (Thursday) and 3 rd (Saturday) of September 2011. Weekday information was gathered<br />

from 0700 – 1000 and 1600 – 1900 with weekend information gathered from 1000 –<br />

1400. Queue length information and journey time data was also collected.<br />

An automatic traffic counter (ATC) is maintained on Glasgow Road a short distance from<br />

the site close to North Elgin Street at (NS 50531 69272). The counter records eastbound<br />

and westbound traffic flow on the Glasgow Road corridor and Annual Average Weekday<br />

Traffic (AAWT) and Annual Average Daily Traffic (AADT).<br />

Page 47<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

As part of the TA desk study, six years of data have been gathered from the Glasgow<br />

Road counter (2005 – 2010) and the recorded traffic in each month of each year have<br />

been compared. The comparisons illustrate that, over these six years, background traffic<br />

growth has been flat or in decline (see Tables 10.1 and 10.2). As a neutral month, March<br />

was randomly selected for the scoping assessment carried out.<br />

Table 10.1: AAWT Westbound<br />

2005 2006 2007 2008 2009 2010 Ave<br />

January 10050 6844 9660 9434 9735 9340 9177<br />

February 10533 10160 10430 10651 10315 10195 10381<br />

March 10474 10578 10486 10125 10504 10293 10410<br />

April 10829 10362 10246 10254 10168 9936 10299<br />

May 10847 10319 10261 9997 10172 10004 10267<br />

June 11001 10313 10408 10098 10116 10021 10326<br />

July 10222 9881 9982 9533 9661 9627 9818<br />

August 10611 10293 10842 10050 10170 10014 10330<br />

September 10363 10219 10519 10059 10388 9508 10176<br />

October 10508 10371 10383 10325 10236 9758 10264<br />

November 10644 10663 10435 10518 10209 9209 10280<br />

December 10224 8557 9606 9799 9687 8604 9413<br />

Table 10.2: AAWT Westbound<br />

2005 2006 2007 2008 2009 2010 Ave<br />

January 9725 6426 3982 9027 9126 8149 7739<br />

February 10202 9797 10079 9979 9481 9294 9805<br />

March 10070 10220 10017 9695 9678 9180 9810<br />

April 10404 10113 10049 9783 8960 9475 9797<br />

May 10122 9937 10094 9635 9437 9389 9769<br />

June 10308 9876 9995 9595 9257 9517 9758<br />

July 9881 9530 9760 9197 9245 9138 9459<br />

August 10308 9195 10511 9671 9871 9550 9851<br />

September 10029 9523 9993 9659 9882 9168 9709<br />

October 10188 9344 8873 7512 9746 9473 9189<br />

November 10204 7378 3416 9109 4673 8008 7131<br />

December 9894 5534 5593 8222 8202 3073 6753<br />

10.4.3 Committed baseline<br />

10.4.3.1 Extant Queen’s Quay committed traffic<br />

Traffic data for the committed development on the Queens Quay site was extracted from<br />

the transport reporting carried out during the process leading up to the grant of the extant<br />

Queens Quay consent(s) 10 . The broad development content assessed as part of this<br />

10 Steer Davies Gleave. November 2007. Queens Quay, Clydebank Transport Modelling Report.<br />

Page 48<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

earlier work included housing, retail (food and non-food), restaurants cafes and bars,<br />

leisure uses, office and light industry, education and student accommodation. The vehicle<br />

trip generation data used within the previous traffic assessments is reproduced in Table<br />

10.3 below.<br />

The committed development data contained in Table 10.3 was analysed to ascertain the<br />

traffic that would cross the counter in its present location on Glasgow Road. The<br />

predicted committed traffic over the course of a typical weekday is 1233 vehicular trips<br />

would head eastbound and 1280 westbound. By adding these trip totals to the March<br />

averages highlighted on the previous page, the total ‘committed’ flows for the extant<br />

Queen’s Quay Masterplan can be taken to be – eastbound 11643 (10410+1233) and<br />

westbound 11090 (9810+1280).<br />

Table 10.3: Committed Queen’s Quay development trips<br />

From Development To Development<br />

0600 - 0700- 0800- 0900- 0600- 0600 - 0700- 0800- 0900- 0600-<br />

0700 0800 0900 1000 1000 0700 0800 0900 1000 1000<br />

Housing 231 482 492 281 1486 31 57 88 89 265<br />

Retail 0 1 1 8 10 0 12 8 17 37<br />

Education 0 0 0 0 0 0 7 100 64 171<br />

Restaurant 0 0 0 0 0 0 0 0 0 0<br />

Total 231 483 493 289 1496 31 76 196 170 473<br />

From Development To Development<br />

1500- 1600- 1700- 1800- 1500- 1500- 1600- 1700- 1800- 1500-<br />

1600 1700 1800 1900 1900 1600 1700 1800 1900 1900<br />

Housing 69 65 72 87 293 408 448 498 390 1744<br />

Retail 68 70 66 68 272 70 59 48 46 233<br />

Education 55 90 48 25 218 0 0 0 0 0<br />

Restaurant 36 37 35 36 144 77 65 54 51 247<br />

Total 228 262 221 216 927 555 572 600 487 2214<br />

1000<br />

1100<br />

1100<br />

1200<br />

From Development To Development<br />

1200<br />

1300<br />

1300<br />

1400<br />

1400<br />

1500<br />

1500<br />

1600<br />

Housing 197 251 240 251 188 202 1329 179 198 254 239 216 243 1329<br />

Retail 33 50 58 64 66 70 341 54 61 59 70 69 68 381<br />

Education 0 0 0 0 0 0 0 0 0 0 0 0 0 0<br />

Restaurant 22 34 40 44 45 48 233 42 47 46 54 53 52 294<br />

Total 252 335 338 359 299 320 1903 275 306 359 363 338 363 2004<br />

10.4.3.2 Other committed traffic<br />

1000<br />

1600<br />

1000<br />

1100<br />

1100<br />

1200<br />

1200<br />

1300<br />

1300<br />

1400<br />

1400<br />

1500<br />

1500<br />

1600<br />

1000<br />

1600<br />

In arriving at the data in the Table 10.3 above, only the committed development<br />

information associated with the Queens Quay site has been considered.<br />

As part of the TA, the Project Team will review the relevant traffic assessments<br />

undertaken for the other committed developments in the area, as identified by the WDC<br />

planning department, and will use the data from these assessments to finalise the<br />

committed traffic baseline.<br />

Page 49<br />

Final for Issue


10.5 Queen’s Quay traffic comparison<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

A comparison of likely traffic generation between the committed Queen’s Quay<br />

development and the proposed Development was undertaken as part of this Scoping<br />

exercise. In essence, the residential component of the scheme will reduce and the retail<br />

component will increase. The area of land designated for other uses (e.g. hotels,<br />

restaurants etc) has not changed significantly from the extant Masterplan.<br />

For the proposed Development, traffic trip rates are assumed to be the same as for the<br />

committed scheme. Rates of 0.3 trips per dwelling and 3 trips per 100sqm gross floor<br />

area for business purposes were assumed. For retail purposes, retail trips from the<br />

previous study were doubled, as the retail floorspace is essentially doubling. Finally, the<br />

other ancillary uses (hotel / bars etc) were carried straight across from the previous work.<br />

This would result in predicted all day development traffic generation of 2312 trips<br />

outbound and 2712 inbound.<br />

Of this traffic, a proportion would cross the location of the Glasgow Road counter. Traffic<br />

distribution proportions utilised in the previous study were examined and these revealed<br />

that 60.7% of residential traffic, 50% of business traffic, 50% of retail traffic and 40% of<br />

ancillary traffic was predicted to cross the counter. The weighted calculation with this<br />

distribution applied illustrates that for the new development, 1192 trips were predicted to<br />

cross the counter eastbound and 1392 westbound, giving total traffic of eastbound<br />

(10410+1192) 11602 and westbound (9810+1392) 11202.<br />

Because retail trips are an intensive traffic generator, a sensitivity calculation was also<br />

undertaken in which the new retail floorspace trip assumption was doubled. Doing this<br />

resulted in total eastbound traffic of 12225 and westbound traffic of 11943.<br />

A summary of the above traffic information is provided in Table 10.4 below:<br />

Table 10.4: Predicted new traffic across Glasgow Road counter<br />

Baseline Committed<br />

Queens<br />

Quay<br />

Vehicles per day<br />

New<br />

Queens<br />

Quay<br />

%age over<br />

cttd base<br />

New<br />

Queens<br />

Quay (retail<br />

sensitivity)<br />

%age over<br />

cttd base<br />

Eastbound 10410 11643 11602 -0.3% 12225 5%<br />

Westbound 9810 11090 11202 1% 11943 7.5%<br />

The comparison illustrates that traffic increases over the committed base lie within the<br />

thresholds identified in the IEA guidelines and within the usual limits of daily variation of<br />

traffic flows. The effects of traffic from the proposed Development will be further diluted<br />

once the traffic data from the other committed developments have been taken into<br />

account.<br />

Page 50<br />

Final for Issue


10.5.1 Scope of traffic assessment within the ES<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Based on the guidance and criteria highlighted in Section 10.2.1 above, the traffic<br />

comparison study highlights that the operational traffic effects associated with the<br />

proposed Development are not significant and should accordingly be scoped out of the<br />

EIA.<br />

It is proposed that a traffic chapter is still included within the ES to provide a summary of<br />

the findings of the TA and to address the potential effects of construction traffic<br />

associated with the phased development of the site. Any residual traffic effects that<br />

emerge during the TA process would also be commented upon within the ES and the<br />

magnitude and significance of these would be assessed and mitigation measures<br />

identified.<br />

Page 51<br />

Final for Issue


11. NOISE & VIBRATION<br />

11.1 Introduction<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

This chapter of the ES will examine the potential effect of construction and operational<br />

noise and vibration on sensitive receptors located on and adjacent to the Development<br />

site. This assessment method will have regard to the provisions of Planning Advice Note<br />

(PAN) 1/2011 and the corresponding Technical Advice Note ‘Assessment of Noise’.<br />

11.2 Consultation<br />

11.3 Baseline<br />

The scope and methodology of the noise and vibration assessment has been discussed<br />

with Karen O’Dell, the Environmental Health Officer at WDC. An initial meeting to discuss<br />

the proposed approach to traffic, noise and air quality was held with WDC at their<br />

Clydebank office on Monday 7 th November 2011.<br />

In 2003, baseline noise measurements were taken on site to inform the Environmental<br />

Statement for the consented Queen’s Quay Masterplan 11 . Ten minute measurements<br />

were taken at ten locations around the site during daytime hours (0700 to 2300) and six<br />

locations during night-time hours (2300 – 0700).<br />

The noise survey measurements were taken whilst demolition works were underway at<br />

the site and these works will undoubtedly have affected the baseline noise levels<br />

recorded. The site is much quieter now that demolition works are complete.<br />

The noise survey utilised the PPG24 Noise Exposure Categories (NEC) to classify the<br />

noise background. Despite, the influence of the demolition works on the baseline<br />

measurements, the 2003 ES reported that NECs at the noise monitoring locations were<br />

predominantly class “B” (planning authorities should increasingly take noise into account).<br />

Two locations were reported as class “C” (there should be a presumption against<br />

permitting a development) but these results were considered to be directly attributable to<br />

the demolition activities and not representative of the normal background situation.<br />

11.4 Potential receptors<br />

Noise sensitive receptors will be a combination of existing properties in the vicinity of the<br />

site and newly constructed residential dwellings which form part of the development<br />

proposals. The impact at all newly proposed residential properties will be determined by<br />

creating a noise model of the development using SoundPlan software. The nearest<br />

existing properties to the development site will be constructed within the noise model and<br />

will include:<br />

11 Clydeside Regeneration Ltd. June 2003. Proposed Redevelopment of Queen’s Quay, Clydebank:<br />

Environmental Statement.<br />

Page 52<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

• Residential properties directly adjacent to the northern site boundary on Dumbarton<br />

Road;<br />

• Residential properties directly adjacent to the northern site boundary on Bruce<br />

Street and Centenary Court;<br />

• Residential properties to the northeast of the site situated on the opposite side of<br />

Glasgow Road (A814);<br />

• Residential properties to the east of the site situated on the opposite side of Cart<br />

Street; and<br />

• Clydebank College buildings situated to the south-east corner of the site.<br />

11.5 Key issues<br />

The assessment of noise and vibration will consider the following potential impacts<br />

arising from the proposed development:<br />

• Noise and vibration during the construction phase potentially affecting nearby<br />

sensitive receptors in the vicinity of the site;<br />

• Noise impacts upon future residential occupiers arising from external noise sources,<br />

specifically road traffic noise;<br />

• Noise impacts at existing noise sensitive receptors due to changes in traffic flows<br />

with the proposed development in operation (taking the ‘committed’ traffic flows as<br />

the baseline – see Section 11.3.1 above); and<br />

• Noise impacts arising from the proposed Development with particular attention paid<br />

to proposed food store activities.<br />

11.6 Proposed assessment for EIA<br />

It is proposed that the existing 2003 noise monitoring data for the site be used for this<br />

revised application assessment. The baseline data will be used for the purposes of<br />

stipulating limiting levels for noise generating sources on the Development site.<br />

Environmental noise incident on sensitive properties will be dictated by road traffic noise<br />

which will be acoustically modelled. The baseline road traffic data used within the model<br />

will be the “committed baseline” described in Chapter 10 of this Scoping Report. The<br />

modelling will consider the proposed changes to the site and will account for increased<br />

traffic flows and building shielding.<br />

The assessment of construction impacts will be based on the available information on the<br />

likely construction programme and activities. If detailed information is available a<br />

quantitative assessment including predicted construction noise levels at selected<br />

receptors will be completed. If only limited information is available the assessment will be<br />

more qualitative and focus on best practice measures.<br />

Page 53<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

The assessment of noise levels at future residential properties will be based on<br />

predictions of traffic noise through the site in accordance with the Calculation of Road<br />

Traffic Noise (CRTN) guidance document. Mitigation measures will be proposed (where<br />

required) in order to meet good practice guidance on internal and external amenity noise<br />

levels.<br />

The assessment of noise levels at existing noise sensitive properties will be based on a<br />

comparison between the committed baseline and the predicted development traffic flows<br />

(as provided within the transport assessment). Calculations will be carried out in<br />

accordance with the Calculation of Road Traffic Noise (CRTN) guidance document.<br />

Page 54<br />

Final for Issue


12. AIR QUALITY<br />

12.1 Introduction<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

The air quality chapter of the Environmental Statement (ES) will provide an assessment<br />

of the potential impacts to local air quality arising from the Development. It will present<br />

the potential impacts associated with the construction works, specifically additional road<br />

traffic and dust generation during site works, and operational emissions from traffic,<br />

heating plant and the petrol station. Where necessary, control and mitigation measures<br />

will be proposed to minimise or remove identified significant impacts.<br />

12.2 Consultation<br />

12.3 Baseline<br />

The scope and methodology of the air quality assessment has been discussed with<br />

Karen O’Dell, the Environmental Health Officer at WDC. An initial meeting to discuss the<br />

proposed approach to traffic, noise and air quality was held with WDC at their Clydebank<br />

office on Monday 7 th November 2011.<br />

The site is not located within, nor is it in close proximity to, an Air Quality Management<br />

Area (AQMA). The nearest AQMA to the site was declared by East Dunbartonshire<br />

<strong>Council</strong> at Bearsden, approximately 4km to the northeast (see Figure 6, Appendix B), due<br />

to exceedences of nitrogen dioxide (NO2) and particulate matter (PM10) National Air<br />

Quality Strategy objectives.<br />

Baseline, or existing, background air quality will be determined using the Local Air Quality<br />

Management Technical Guidance (LAQM.TG) (2009) estimated background<br />

concentrations, supplemented with representative automatic monitoring station data and<br />

Local Authority diffusion tube data as appropriate. NO2 diffusion tubes are located on<br />

Glasgow Road, which borders the site to the north. It is not proposed to conduct any<br />

diffusion tube monitoring as part of the EIA.<br />

12.4 Potential receptors<br />

Potential receptors include existing residential properties that border the site to the north<br />

and east that may be impacted by heating plant emissions, construction dust and<br />

benzene emissions from the proposed petrol station. Existing residences on Glasgow<br />

Road, Cart Street and the wider road network may also be impacted by increased traffic<br />

emissions from additional vehicle movements.<br />

The last group of receptors are those within the Masterplan site that are operational when<br />

other phases of development are being constructed, such as residential plots and the<br />

care home, which may be impacted by construction dust emissions and heating plant<br />

emissions.<br />

Page 55<br />

Final for Issue


12.5 Key issues<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Potential impacts include an increase in NO2 and PM10 levels due to emissions from<br />

construction road traffic, dust generation during site works, operational road traffic and<br />

heating plant (depending on energy source). Benzene emissions from the petrol station<br />

will also be assessed; however, they are not anticipated to be a key issue and are likely<br />

to be screened out at an early stage of assessment.<br />

12.6 Proposed studies for EIA<br />

For road traffic emissions (construction and operational) it is proposed that vehicle trips,<br />

which are in addition to those already consented and classed as committed development<br />

at the site, will be screened using the Environmental Protection UK (2010 Update) and<br />

Design Manual for Roads and Bridges (DMRB) Air Quality Screening Criteria. Both<br />

criteria consider changes in traffic flow characteristics with and without development and<br />

where changes are below set thresholds, no further assessment will be undertaken. If an<br />

accelerated construction approach is utilised or if the screening criteria are otherwise<br />

breached then an atmospheric dispersion model (ADMS-Roads) will be used to assess<br />

the impact to local air quality associated with any additional road traffic. The study would<br />

be desk-based and comprise a number of traffic flow scenarios, including modelling the<br />

present-day and a given future date both with and without the Development. The<br />

modelling will focus upon NO2 and PM10, the two main pollutants of concern from road<br />

traffic in the region. Model predictions will be verified, where possible, ideally using the<br />

same year of monitoring data as the present year traffic dataset. Oxides of nitrogen<br />

(NOx) to NO2 conversions will be undertaken using the latest Defra spreadsheets.<br />

The potential impacts and nuisance from construction dust generated during the<br />

construction phase will be considered in a semi-quantitative context (i.e. basic screening<br />

assessment using data from a Buildings Research <strong>Council</strong> case study).<br />

Emissions from operational heating plant will be considered qualitatively on the basis that<br />

they are limited to building services plant only and not an energy generation centre.<br />

Fugitive benzene emissions from the petrol station will be addressed through application<br />

of screening criteria from LAQM.TG 2009 (as updated by the limit values in the Air<br />

Quality Standards (Scotland) Regulations 2010) at sensitive receptor locations.<br />

Following determination of the likely impacts, a standard suite of mitigation measures will<br />

be recommended for the control of dust and site plant emissions during construction<br />

works, with specific attention paid to any available local codes of practice. Additional sitespecific<br />

mitigation measures will be proposed as necessary, in order to minimise or<br />

remove adverse impacts to local air quality.<br />

The assessment of potential impacts and their significance will be based on the criteria<br />

outlined in the Environmental Protection UK (formerly National Society for Clean Air)<br />

publication ‘Development Control: Planning for Air Quality’ (2010 Update). The criteria will<br />

be modified slightly to use the terms ‘major’, ‘moderate’ and ‘minor’.<br />

Page 56<br />

Final for Issue


13. ARCHAEOLOGY & CULTURAL HERITAGE<br />

13.1 Introduction<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

This Scoping Report sets out the initial heritage baseline of the proposed development<br />

site and the approach to be taken to accurately assess the impacts resulting from the<br />

proposed Development.<br />

13.2 Consultation<br />

13.3 Baseline<br />

During the preparation of this scoping report, Martin O’Hare of the West of Scotland<br />

Archaeology Service (WoSAS) was consulted for baseline information and an initial<br />

scoping opinion.<br />

Future consultation will be undertaken with Hugh McBrien and the Heritage Conservation<br />

Officer for West Dunbartonshire <strong>Council</strong> during the EIA process. Due to the presence of<br />

the grade A listed Titan Crane, Historic Scotland will also be consulted as part of the EIA.<br />

As part of the previous ES undertaken for this site, a detailed archaeological baseline and<br />

heritage ES chapter was produced. The ES outlined the history of the site in detail, with<br />

particular reference to the J & G Thomson Shipyard and the subsequent John Brown<br />

Shipyard that occupied the site from 1871 to the late 20 th century. Despite the wholesale<br />

clearance of the site, the early 20 th century Titan Crane has been retained and forms a<br />

focal point within the Development site.<br />

It was noted in the previous ES that prior to the shipyard construction, the site was used<br />

for agricultural purposes with no significant structures appearing on any of the historic<br />

mapping of the site. Similar riverbank sites on the Clyde have contained evidence of<br />

prehistoric archaeology. During the expansion of the Clyde in the 19 th century, a small<br />

number of prehistoric canoes and log-boats were discovered in the river mud<br />

approximately 5m below ground level. One of the heritage assets identified in the WoSAS<br />

search (detailed below) is an ovoid stone axe of unknown date. The find location of this<br />

axe is uncertain; however, it does indicate the potential for prehistoric deposits to remain<br />

in the study area. Having said this, it is likely that the development of the shipyards in the<br />

19 th and 20 th centuries will have caused extensive damage to below ground deposits thus<br />

reducing the potential for prehistoric archaeology.<br />

The main heritage resource on this site is the shipyard developed in 1871 by James and<br />

George Thompson in an area known as Barnes of Clyde. The shipyard retained this<br />

name and the town of Clydebank took its name from this site. The Forth and Clyde Canal<br />

was constructed in the 1830s and 1840s and as such was already extant by the time the<br />

shipyard was constructed and was one of the reasons this site was chosen. The site<br />

continued to expand and was taken over by John Brown & Co, Sheffield steel<br />

manufacturers in 1899. The shipyard became one of the most prominent shipyards in the<br />

world, constructing and launching ships including the Queen Mary, the QE2 and the<br />

Lusitania. The site contained a large number of buildings and workshops along with a<br />

Page 57<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

number of slipways and docks. The success of the shipyard led to the creation of the<br />

town of Clydebank, populated with the workers at the shipyard and their families, and<br />

transport and communication networks.<br />

The historic development of Clydebank as part of the industrialisation of Glasgow also led<br />

to the establishment of associated municipal buildings to cater for the growing population<br />

of workers and merchants. As a result, a number of significant late 19 th and early 20 th<br />

century structures were constructed along Dumbarton Road, including the town hall and<br />

library.<br />

During the latter half of the 20 th century, the demand for ships began to decline and<br />

eventually in 1999, the shipyard closed. In 2006, all of the remaining buildings on site<br />

were demolished.<br />

13.4 Potential receptors<br />

There are a number of designated and undesignated heritage assets within the footprint<br />

of the proposed development and within the search buffer.<br />

For the designated assets such as Scheduled Monuments, Listed Buildings and<br />

Conservation Areas, a search buffer of 500m from the edge of the site boundary has<br />

been applied. For the undesignated assets such as archaeological sites and findspots<br />

and undesignated buildings, a search radius of 250m from the edge of the site boundary<br />

has been used. This is a reflection of both the relative importance of the designated and<br />

non-designated features, but also to ensure that only the most relevant data is used for<br />

the assessment which is sufficient to give the site its historical and archaeological<br />

context.<br />

One Scheduled Monument has been identified within the 500m search area. This is the<br />

Forth and Clyde Canal – Old Kilpatrick to Linnvale section.<br />

Nine listed buildings have been identified within the 500m search area from the boundary<br />

of the proposed development.<br />

The search of the WoSAS Sites and Monuments Record (SMR) uncovered 13<br />

undesignated heritage assets within the 250m search area. All of these assets with the<br />

exception of the stone axe date from the early modern period and are either associated<br />

with the Forth and Cart Canal or the shipyard.<br />

In addition to the heritage assets, the WoSAS search identified two archaeological event<br />

records, one of which was the archaeological assessment carried out for the previous<br />

planning application. The other event was the record of an evaluation that took place to<br />

the east of the proposed development site prior to the development of living<br />

accommodation. Structural remains relating to the later railway developments were<br />

recovered, however no evidence was found of the Forth and Cart Canal structure or any<br />

associated remains.<br />

Page 58<br />

Final for Issue


13.5 Key issues<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Maintaining and improving the setting and heritage links of the Forth and Clyde Canal<br />

with the Development site will be a key issue for this development.<br />

A total of nine listed buildings have been identified within the search area. A total of five<br />

of these are considered to be key issues in the regeneration of the site.<br />

Located within the site is the category A listed Titan Crane, a relic of the former John<br />

Brown shipyard and significant national landmark. The crane is in active use as a popular<br />

heritage centre, a use which will need to be considered as part of the development.<br />

Bordering the site are a number of listed structures relating to the municipal development<br />

of the area. These form a significant group and contribute to the wider streetscape.<br />

Consideration will be required to ensure the development does not detract from this<br />

historic grouping.<br />

Only one of the WoSAS SMR sites identified within the 250m search area lies within the<br />

proposed development boundary; however, this asset is the John Brown shipyard itself<br />

and as such covers a number of features within the site such as slipways and demolished<br />

buildings. Where it is identified that the proposed Development will impact upon important<br />

features, they will be considered within the EIA.<br />

13.6 Proposed studies for EIA<br />

The main element of the studies for the EIA will be the desk study. A small amount of<br />

field work will be required in the form of a site walkover.<br />

13.6.1 Desk study<br />

A detailed baseline/technical appendix will be produced which will expand on the work<br />

already undertaken for this Scoping Report and will incorporate the work undertaken by<br />

FAS in their 2003 Archaeological Assessment and the 2003 ES. Further original and<br />

secondary documentary and cartographic research will be undertaken at the Clydebank<br />

Library. The results of any geotechnical investigations will be analysed to establish areas<br />

where previous construction may have truncated archaeological deposits. Using this<br />

information, coupled with the results of the site visit which is detailed below, the key<br />

characteristics of the heritage assets, including a description of their setting can be<br />

described and stated, along with a statement of potential for further archaeological<br />

remains.<br />

No consideration was made of the historic built environment within the 2003 ES and<br />

therefore a full analysis will be undertaken as part of this assessment. An assessment will<br />

be made of the significance of the individual listed buildings, alongside a consideration of<br />

their setting. A site visit will also be conducted to identify any upstanding remains within<br />

the development site which may be of architectural and/ or historic interest. During the<br />

site visit, consideration will also be made of the historic character of the surrounding<br />

streetscape in order to inform the development design process.<br />

Page 59<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

The heritage chapter of the ES will use the results of the technical appendix to assess the<br />

impact of the proposed development on the key characteristics and setting of the<br />

identified heritage assets in accordance with current standards and guidance including:<br />

Scottish Planning Policy (SPP), Scottish Historic Environment Policy (SHEP), PAN<br />

2/2011: Planning and Archaeology, and the draft setting guidance Managing Change in<br />

the Historic Environment: Setting (Historic Scotland 2009). The assessment will involve<br />

establishing the key characteristics of the heritage asset and the magnitude of the impact<br />

upon them. Mitigation measures will then be proposed where necessary to reduce<br />

identified impacts. The residual effects of the proposed development will then be stated<br />

within the report.<br />

13.6.2 Field studies<br />

It is unlikely that any field studies will be required prior to submission of the planning<br />

application. The only fieldwork undertaken will be a site walkover which will be carried out<br />

to supplement the information gained from the documentary research. The purpose of the<br />

site walkover is two-fold. Firstly, the walkover will assess the already identified heritage<br />

assets and their setting and assess the potential impacts on the setting from the<br />

proposed development and will also look to identify any heritage assets which are not<br />

inscribed on the WoSAS SMR. Secondly, the site visit will look to identify and record<br />

areas of previous disturbance where construction activity has had the potential to remove<br />

archaeological deposits.<br />

Page 60<br />

Final for Issue


14. SOCIO-ECONOMICS<br />

14.1 Introduction<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

This section presents our proposed methodology to undertake an assessment of the<br />

economic and social impacts that the proposed mixed use development at Queens Quay,<br />

Clydebank is predicated to generate.<br />

The assessment will examine the impacts of the proposed development on a number of<br />

key indicators, including: population; employment; local services (schools, healthcare,<br />

leisure facilities); and the local business base. The assessment will consider impacts at<br />

both the construction and operational stages.<br />

This assessment of socio-economic impacts will address the following issues:<br />

• identification of the baseline characteristics of the Clydebank area in terms of<br />

housing stock, population, employment, unemployment, economic activity, <strong>Council</strong><br />

Tax revenue and availability of services such as education and healthcare;<br />

• an estimation of the impact of construction employment numbers during the<br />

construction activities on-site;<br />

• an estimation of the impact of direct and indirect employment created as a result of<br />

the completed development; and<br />

• an analysis of the proposed increases in housing stock and population on the site<br />

and how this will impact the local and wider area in terms of economic factors and<br />

provision of education and healthcare services.<br />

This assessment will been undertaken using appraisal techniques consistent with those<br />

outlined in the HM Treasury Green Book Guidelines for the appraisal of large-scale<br />

development projects. The assessment considers the impact across all project<br />

components outlined in the proposed application.<br />

The specific methods of assessment for each topic area are outlined below. Where data<br />

is unavailable, professional judgement and assumptions will be used, as detailed within<br />

the Appendix.<br />

14.2 Consultation<br />

The assessment will consider feedback from the development team (Dawn Group Limited<br />

and Clydeside Regeneration Limited) on the scale and scope of the development, and<br />

also on the likely construction timescales and subsequent occupancy of the completed<br />

development.<br />

Other potential consultees include:<br />

• Local health centres, doctors surgery’s and dentists<br />

Page 61<br />

Final for Issue


14.3 Baseline<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

• Local education providers and day care services<br />

• Local environmental groups to assess the impact of new greenspace<br />

• Local recreation/leisure groups e.g. angling association, walking/cycling groups<br />

and rowing clubs.<br />

Below we have highlighted some of the key baseline conditions the proposed<br />

development is predicted to impact upon.<br />

Population – the total population for the wider Clydebank area is 47,372, broken down<br />

as follows: Children (0-15) – 9,430 (19.9%); working age adults – 30,398 (64.2%) and<br />

retired 7,544 (15.9%).<br />

Employment – the employment base of Clydebank is 16,860, split 64% full time and<br />

36% part time. The ‘health’ (17%), ‘accommodation and food services’ (14%) and ‘retail’<br />

(12%) industry sectors represent the largest employers.<br />

Unemployment – there are 1,945 people claiming Job Seekers Allowance (JSA)<br />

representing 6.5% of the resident working age population.<br />

Education – a review of the local area identifies five primary and five secondary schools<br />

within the catchment area.<br />

Health services – Clydebank and Drumchapel Health Centre within 1.5 miles of<br />

Clydebank, 10 dental practices within 1.5 miles.<br />

While the area is in the process of undergoing transformational regeneration, Clydebank<br />

is an area that continues to suffer from widespread multi-faceted deprivation as<br />

highlighted by the following statistics (Scottish Index of Multiple Deprivation 2009):<br />

• income deprived – Clydebank has an income deprivation rate which is more than<br />

double the Scottish average<br />

• employment deprived – Clydebank has an employment deprivation rate which is<br />

almost double the Scottish average<br />

• worklessness – Clydebank has a worklessness rate which is 25% points above the<br />

Scottish average<br />

• Job Seekers Allowance (JSA) claimants – Clydebank has a claimant rate which is<br />

14.4 Potential receptors<br />

more than double the Scottish average.<br />

The proposed development is likely to impact (positive or negative) on the following:<br />

• resident population base;<br />

Page 62<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

• employment base;<br />

• business base;<br />

14.5 Key issues<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

• local education, health and leisure facilities;<br />

• Business Rates and <strong>Council</strong> Tax;<br />

• perception and ‘feel’ of the area;<br />

• local biodiversity through the creation of greenspace<br />

• local groups that use the area for recreation and leisure including walking, cycling,<br />

angling and rowing.<br />

The key issues to be considered within the socio-economic assessment are outlined<br />

below.<br />

Legislation and planning policy context: this section sets out the national, regional and<br />

local planning policy context for the development and considers the proposed<br />

developments fit with, and contribution towards planning, land use, and economic<br />

development policy and the Single Outcome Agreement.<br />

Baseline assessment: The baseline assessment identifies the baseline characteristics<br />

of the Clydebank area in terms of housing stock, population, employment,<br />

unemployment, economic activity, <strong>Council</strong> Tax revenue, Business Rates and availability<br />

of services such as education and healthcare. A number of data sources will be used,<br />

including: Annual Business Inquiry (ABI), General Register Office for Scotland (GROS),<br />

Scottish Annual Business Statistics, Census 2001, commercial search websites (e.g.<br />

Yell.com, upmystreet) and Scottish Schools Online data,<br />

Assessment and mitigation: Assessment of the likely scale, duration, significance and<br />

permanence of effects associated with:<br />

• gross and net construction impacts (one-off impacts) during the construction phase<br />

of the development – Man Year Equivalent (MYE) jobs, Gross Value Added (GVA);<br />

salaries;<br />

• gross and net impacts (on and off site impacts) during the operational phase of the<br />

development – Full Time Equivalent (FTE) jobs, Gross Value Added (GVA), salaries;<br />

• financial impacts on the local economy including an increase in spend generated by<br />

increased footfall, and increases in <strong>Council</strong> Tax and Business Rates generated<br />

through the residential units and new commercial floorspace; and<br />

• assessment of wider qualitative impacts including social and catalytic impacts.<br />

Residual impact assessment and conclusions: overview of the key impacts (both<br />

positive and negative) predicted to be generated through the completed and occupied<br />

development, based on the following significance criteria:<br />

Page 63<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

• substantial = change of +/- 20% or more;<br />

• moderate = change of +/- 10% to 19%;<br />

• minor = change of +/- 5% to 9%; and<br />

• negligible = change of +/- 4% or less.<br />

Cumulative assessment: The predicted cumulative effects in terms of the proposed<br />

developments impact on other development schemes and local services/facilities in the<br />

wider local authority area will be considered.<br />

14.6 Proposed studies for EIA<br />

Both desk and field based study inputs have been identified for the assessment.<br />

14.6.1 Desk study<br />

Assessment of the socio-economic impact of the development will be undertaken through<br />

both desk based research and a limited number of consultations with local stakeholders.<br />

The desk based study includes undertaking a bespoke economic impact appraisal which<br />

will identify potential employment, GVA and salary impacts. Further, it will identify the<br />

impact that development will have on the population base, <strong>Council</strong> Tax, Business Rates<br />

and spend in the town centre.<br />

Gross impacts – derived from consultation with the client and OffPAT guidance on<br />

employment densities (2010). Gross impacts are measured in Full Time Equivalent jobs.<br />

Net impacts – derived through assessing the impact on the gross impacts from a range<br />

of factors including leakage (impacts generate outside the target area), displacement<br />

(competition with other businesses) and multipliers (the additional indirect and induced<br />

impact of the development).<br />

Gross Value Added - GVA is a measure of the value of goods and services produced<br />

before allowing for depreciation or capital consumption. The GVA impacts are assessed<br />

using an average industry GVA per employee figure, Scottish Annual Business Statistics<br />

(then uprated to reflect 2011 prices, and further uprated to reflect FTEs) and multiplied by<br />

the number of net jobs.<br />

Salaries – salaries of the employees working within the operational activity on site. The<br />

salary impacts are assessed using an average industry salary per employee figure,<br />

Scottish Annual Business Statistics (then uprated to reflect 2011 prices, and further<br />

uprated to reflect FTEs) and multiplied by the number of net jobs.<br />

Construction jobs – are the one-off jobs supported during the construction phase of the<br />

development and are measure in MYEs. Our analysis of construction industry<br />

employment impacts are based on Scottish Annual Business Statistics.<br />

Page 64<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

The analysis uses an employment co-efficient of construction industry spend required to<br />

sustain one full-time construction industry employee for a period of one year – an MYE<br />

post.<br />

Construction jobs are based on MYEs. This method allows the number of people on site<br />

over the whole construction period (which will vary over the period between full-time, parttime,<br />

permanent, temporary and contract) to be estimated as an annual equivalent post –<br />

MYE.<br />

Business Rates and <strong>Council</strong> Tax - The <strong>Council</strong> Tax has been assessed based on data<br />

from West Dunbartonshire <strong>Council</strong> on current <strong>Council</strong> Tax bands and a number of<br />

assumptions about the breakdown of the residential units. Business Rates are<br />

determined as a function of the rateable value and a multiplier based on the rateable<br />

value of the property (currently 43.3p in the pound)<br />

Population impacts - The additional resident based population the development is likely<br />

to support is based on assumptions on the likely development breakdown and occupancy<br />

level based on the existing population base of the local area (Census 2001).<br />

Social Impacts – the social impacts of the development will be based on a review of<br />

existing literature and relevant web sites to identify existing health, school and leisure<br />

provision and examples from similar developments.<br />

Further, the assessment will consider a range of policy <strong>documents</strong> including:<br />

• Government Economic Strategy<br />

• West Dunbartonshire Economic Development Strategy<br />

• West Dunbartonshire Single Outcome Agreement<br />

• Glasgow and Clyde Valley Structure Plan<br />

• West Dunbartonshire Local Plan.<br />

14.6.2 Field studies<br />

The assessment will include a range of consultations to assess the impacts of the<br />

development during both the construction and operational phases. The suggested list of<br />

consultees is:<br />

• Early education/nursery: (Kilbowie Early Education and Childcare Centre, Lucky<br />

Little Starts Nursery, Fasque Family Centre, Edinbarnet Nursery and 3bears<br />

Nursery);<br />

• Primary schools: (Kilbowie Primary School, Goldenhill Primary School, Whitecrook<br />

Primary School and Carleith Primary School);<br />

• Secondary schools: (Clydebank High School, Kilpatrick High School, Drumchapel<br />

High School and Park Mains High School);<br />

Page 65<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

• Local healthcare providers (doctors, dentists, health centres);<br />

• Donald Petrie the Access Officer at WDC – impacts of new footpaths/cycle ways;<br />

• Clyde Green Network Partnership – contribution towards strategy;<br />

• Association of Salmon Fisheries Boards – impact on local fisherman/angling<br />

activities;<br />

• Clyde River Foundation regards to potential for impacts on fisheries;<br />

• British Waterways – to assess any potential impact on the Firth and Forth Canal;<br />

and<br />

• Other local groups as appropriate – any other local groups e.g. bird watchers, cycle<br />

/walking groups that may experience a positive or negative impact generated by the<br />

development.<br />

Page 66<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

15. FORMAT OF THE ENVIRONMENTAL STATEMENT (ES)<br />

15.1 Environmental issues to be included within the EIA<br />

Having considered the potential key environmental issues, it is proposed that the ES for<br />

the Masterplan proposal will include the following chapters:<br />

• Ecology and Nature Conservation<br />

• Landscape and Visual<br />

• Water Resources<br />

• Geology and Soils<br />

• Traffic (Construction)<br />

• Noise<br />

• Air Quality<br />

• Archaeology and Cultural Heritage<br />

• Socio-economic Impacts<br />

The content and scope of the assessments to be carried out for each of these EIA<br />

themes is provided in Chapters 6 to 144 of this report.<br />

15.2 Environmental issues to be “scoped out” of the EIA<br />

• Operational Traffic<br />

• Vibration<br />

15.3 EIA team<br />

The EIA process is being managed and undertaken by staff within URS Scott Wilson’s<br />

UK environment team, with additional specialist inputs from:<br />

• Transport Planning Ltd (Traffic);<br />

• Envirocentre (Ecology);<br />

• David Wilson Landscape Architects (Landscape & Visual); and<br />

• Ekos (Socio-economics).<br />

Page 67<br />

Final for Issue


15.4 Format of the environmental information<br />

15.4.1 Environmental Statement<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

The environmental information produced as part of the EIA will be submitted within an<br />

ES. The ES will comprise a series of technical reports, figures and appendices combined<br />

within a single stand-alone document.<br />

The information provided within the ES will comply with Schedule 4 of the Environmental<br />

Impact Assessment (Scotland) Regulations 2011: “Information for Inclusion in<br />

Environmental Statements”.<br />

In accordance with the EIA regulations, a Non-Technical Summary (NTS) will be<br />

produced. The NTS will summarise the main findings of the EIA within a short document<br />

that is written in clear and easily understood language. The purpose of the NTS is to<br />

reproduce the main points of the environmental information in a way that is accessible to<br />

as many people as possible.<br />

The ES and NTS will be publicly accessible <strong>documents</strong> that will be made available on<br />

request (although a charge may apply) and which will be placed on public display with the<br />

planning <strong>documents</strong> during the statutory consultation period.<br />

Page 68<br />

Final for Issue


16. ABBREVIATIONS<br />

AADT Annual Average Daily Traffic<br />

AAWT Annual Average Weekday Traffic<br />

AOD Above Ordnance Datum<br />

AQMA Air Quality Management Area<br />

ATC Automated traffic Counter<br />

Ave average<br />

bgl below ground level<br />

BGS British Geological Society<br />

BTO British Trust for Ornithology<br />

CRTN Calculated Road Traffic Noise<br />

CSM Conceptual Site Model<br />

dB decibel<br />

DMRB Design Manual for Roads and Bridges<br />

EcIA Ecological Impact Assessment<br />

EIA Environmental Impact Assessment<br />

ES Environmental Statement<br />

EU European Union<br />

FRA Flood Risk Assessment<br />

FTE Full Time Equivalent<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

GCVSDP Glasgow and the Clyde Valley Strategic Development Plan<br />

GDL Gardens and Designed Landscapes<br />

GVA Gross Value Added<br />

HGV Heavy Goods Vehicle<br />

HRA Habitats Regulations Assessment<br />

IEA Institute of Environmental Assessment<br />

IEEM Institute of Ecology and Environmental Management<br />

Page 69<br />

Final for Issue


IHT Institute of Highways and Transportation<br />

km kilometre<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

LAQM.TG Local Air Quality Management Technical Guidance<br />

LNCS Local Nature Conservation Site<br />

LNR Local Nature Reserve<br />

LPA Local Planning Authority<br />

LVIA Landscape and Visual Impact Assessment<br />

m metre<br />

MYE Man Year Equivalent<br />

NATS National Air Traffic Services<br />

NEC Noise Experience Category<br />

NO2 nitrogen dioxide<br />

NOx oxides of nitrogen<br />

NPF2 National Planning Framework for Scotland 2<br />

NSA National Scenic Area<br />

NTS Non-Technical Summary<br />

OD Ordnance Datum<br />

PAN Planning Advice Note<br />

PM10 particles measuring 10µm or less<br />

QQELD Queen’s Quay Enterprise and Learning District<br />

RBMP River Basin Management Plan<br />

RSPB Royal Society for the Protection of Birds<br />

SPA Special Protection Area<br />

SEPA Scottish Environmental Protection Agency<br />

SHEP Scottish Historic Environment Policy<br />

SM Scheduled Monument<br />

SMR Sites and Monuments Record<br />

Page 70<br />

Final for Issue


SNH Scottish Natural Heritage<br />

SPP Scottish Planning Policy<br />

SSSI Site of Special Scientific Interest<br />

SUDS Sustainable Urban Drainage Systems<br />

TA Traffic Assessment<br />

TPO Tree Preservation Order<br />

WDC West Dunbartonshire <strong>Council</strong><br />

WeBS Wetland Bird Survey<br />

WFD Water Framework Directive<br />

WoSAS West of Scotland Archaeological Society<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Page 71<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Appendix A Screening Decision<br />

Final for Issue


EIA Screening Decision<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Final for Issue


Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Appendix B Figures<br />

Final for Issue


Figure 1: Development Site Location Plan<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Final for Issue


Figure 2: Draft Outline Masterplan<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Final for Issue


Figure 3: Indicative Construction Phasing<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Final for Issue


Figure 4: Search Area Buffers<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Final for Issue


Figure 5: Natural Heritage Sites<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Final for Issue


Figure 6: Air Quality Management Areas<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Final for Issue


Figure 7: Cultural Heritage Sites<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Final for Issue


Figure 8: Core paths<br />

Dawn Developments Ltd/467374673/Queen’s Quay Masterplan EIA/KD<br />

04/01/2012<br />

Major Mixed Use Development, Queen's Quay, Clydebank<br />

EIA Scoping Report<br />

Final for Issue

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!