04.11.2013 Views

Chabot College | Class Schedule | Spring 2010 Spring 2010

Chabot College | Class Schedule | Spring 2010 Spring 2010

Chabot College | Class Schedule | Spring 2010 Spring 2010

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The Changing Face of <strong>Chabot</strong> <strong>College</strong><br />

New cutting-edge buildings, extensive renovations, and high-tech<br />

upgrades—it’s all part of <strong>Chabot</strong>’s $250-million makeover, thanks to<br />

funding through the 'Measure B' bond. With much of the major<br />

construction scheduled to wrap up this spring, <strong>Chabot</strong> <strong>College</strong> is well<br />

on its way to becoming the modern, state-of-the-art institution<br />

envisioned by innovative leaders and a forward-thinking community.<br />

To be completed Fall 2009<br />

Dental Clinic (Building 2200)<br />

To be completed <strong>Spring</strong> 2009<br />

Planetarium (Building 1900)<br />

Future construction<br />

Physical Education Building<br />

Campus Drive (between Parking<br />

Lots A&B and G&H)<br />

Central Utility Plant<br />

Emergency Call Centers<br />

Gym (floor and bleachers)<br />

Tennis Courts<br />

Football field (artificial turf)<br />

Building 900<br />

Swimming Pool Renovation Pool (resurfacing),<br />

Solar Energy Project

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!