- Page 1 and 2: Publication 364 W115 - Construction
- Page 3 and 4: Table of Contents Foreword 3 Introd
- Page 6 and 7: Introduction This report has been p
- Page 8 and 9: • Benchmarks for waste production
- Page 10 and 11: Canada (with a focus on Ontario) Co
- Page 12 and 13: Canada 8,961,583 9,238,376 16,265,1
- Page 14 and 15: Table 5: Projected tonnage of CRD w
- Page 16 and 17: • conduct an audit of the waste t
- Page 18 and 19: Standard that is now a requirement
- Page 20 and 21: while reducing the amount of useful
- Page 22 and 23: components. However, recycling of s
- Page 24 and 25: 170409 170503 170504 170505 170506
- Page 26 and 27: Organic waste Since the Disposal Ac
- Page 28 and 29: Israel Contributed by: Gil Peled -
- Page 30 and 31: includes: • Stopping the illegal
- Page 32 and 33: 4. Guidance documents/ reports link
- Page 34 and 35: The Plan includes: • Prevention b
- Page 36 and 37: The Jaffa Slope was a landfill on t
- Page 38 and 39: One of the first community gardens
- Page 40 and 41: The amount of recycled and landfill
- Page 42 and 43: Roles and responsibilities Manufact
- Page 44 and 45: est outcome. This includes applying
- Page 48 and 49: Figure 10: gives an example of the
- Page 50 and 51: Table 1 - Waste amounts from constr
- Page 52 and 53: 2. Design-guide for reuse and recyc
- Page 54 and 55: Figure 1 - Demolition Waste Quantit
- Page 56 and 57: 2. Benchmark Data Benchmark at Desi
- Page 58 and 59: 3. Policies, strategies and legisla
- Page 60 and 61: STRATEGIC THRUST 3: Building indust
- Page 62 and 63: y registered waste contractors. The
- Page 64 and 65: Table 2(a)(i) - Residential Buildin
- Page 66 and 67: Assessment Criteria for Green and G
- Page 68 and 69: GREEN PRACTICES Total: 50 Energy Su
- Page 70 and 71: Do the sites provide full-height sa
- Page 72 and 73: Has the builder achieved safety res
- Page 74 and 75: Figure 7 - Processing of C&D Waste
- Page 76 and 77: Slovenia Contributed by: Lucija Han
- Page 78 and 79: Table 1: Gross investments and curr
- Page 80 and 81: Switzerland Contributed by: Karin T
- Page 82 and 83: Table 1: Construction expenditures
- Page 84 and 85: Table 2: Compilation of existent an
- Page 86 and 87: About 80% of outflowing materials a
- Page 88 and 89: Having a look now at civil engineer
- Page 90 and 91: Environmental protection in Switzer
- Page 92 and 93: a recommendation and its applicatio
- Page 94 and 95: 2. Benchmark data More than 3/4 of
- Page 96 and 97:
The total volume is 4.5 Mm3; total
- Page 98 and 99:
Table 4: Use of waste materials in
- Page 101 and 102:
Directly on the construction sites,
- Page 103 and 104:
The allowed use of the six secondar
- Page 105 and 106:
It is recognized that lean concrete
- Page 107 and 108:
Discussion The previous two chapter
- Page 109 and 110:
Grey energy of buildings (SIA 2032)
- Page 111 and 112:
Envest (GB), BECOSE (Finland), ECOS
- Page 113 and 114:
economy establish a better network.
- Page 115 and 116:
using concrete from the factory 500
- Page 117 and 118:
20) FOEN 2006. Richtlinie für die
- Page 119 and 120:
64) VILB 2009. Regulation on the ma
- Page 121 and 122:
Excavation, Construction and Demoli
- Page 123 and 124:
United Kingdom Contributed by: Gill
- Page 125 and 126:
importing new materials. Accordingl
- Page 127 and 128:
Benchmarks are also produced relate
- Page 129 and 130:
authority received the building not
- Page 131 and 132:
BREEAM 47 BREEAM is the world's for
- Page 133 and 134:
United States of America Contribute
- Page 135 and 136:
180 160 140 120 100 80 60 40
- Page 137 and 138:
2. Benchmark Based on the data from
- Page 139 and 140:
addition, people requesting buildin
- Page 141 and 142:
• Credit 1.1 Building Reuse—Mai
- Page 143 and 144:
Estimated Composition by Weight for
- Page 145 and 146:
5. Case Study a. State Offices at B
- Page 147 and 148:
The combined cost to crush & recycl
- Page 149 and 150:
f. Executive Hills Deconstruction &
- Page 151 and 152:
country report, the enforcement of
- Page 153 and 154:
year. Waste avoidance in large scal
- Page 155 and 156:
Appendix for Switzerland report Leg
- Page 157 and 158:
cannot be recovered. Also permitted
- Page 159 and 160:
Standard (Year) Building standards
- Page 161 and 162:
Sustainable Development Strategy Re
- Page 163 and 164:
CIB Commissions Members can choose
- Page 165 and 166:
CIB Task Groups and Working Commiss
- Page 167:
CIB General Secretariat Kruisplein