220-66-kv-xmer-on-line-nifes-r4-sept-08 - Gujarat Electricity Board
220-66-kv-xmer-on-line-nifes-r4-sept-08 - Gujarat Electricity Board
220-66-kv-xmer-on-line-nifes-r4-sept-08 - Gujarat Electricity Board
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
GETCO/E/TS – XMER01power/R4 Sept <strong>08</strong><br />
SECTION – III<br />
BIDDING SCHEDULE<br />
(To be filled in and signed by the Bidder)<br />
SCHEDULE ‘A’<br />
SCHEDULE OF GUARANTEED TECHNICAL PARTICULARS<br />
FOR POWER TRANSFORMERS<br />
1. Name of manufacturer :<br />
2. Normal full load single phase/three phase output :<br />
H.V. Winding (KVA) :<br />
L.V. Winding (KVA) :<br />
2.1 Temp. Rise as specified in the specificati<strong>on</strong>. :<br />
3. C<strong>on</strong>tinuous single phase/three phase output under :<br />
site c<strong>on</strong>diti<strong>on</strong>s as specified in the specificati<strong>on</strong><br />
H.V. Winding (KVA) :<br />
L.V. Winding (KVA) :<br />
4. Type of cooling and corresp<strong>on</strong>ding normal :<br />
full load output<br />
H.V. Winding (KVA) :<br />
L.V. Winding (KVA) :<br />
5. Over load capacity (as per IS:<str<strong>on</strong>g>66</str<strong>on</strong>g>00) :<br />
starting from full load and with Temp. as<br />
specified in the Specificati<strong>on</strong> ( KVA )<br />
6. Normal ratio of transformati<strong>on</strong> :<br />
7. C<strong>on</strong>necti<strong>on</strong> (including vector group ref. &:<br />
symbol)<br />
H. V. Winding :<br />
L.V. Winding :<br />
Sign and Seal of Bidder Page 45 of 87