04.01.2014 Views

220-66-kv-xmer-on-line-nifes-r4-sept-08 - Gujarat Electricity Board

220-66-kv-xmer-on-line-nifes-r4-sept-08 - Gujarat Electricity Board

220-66-kv-xmer-on-line-nifes-r4-sept-08 - Gujarat Electricity Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GETCO/E/TS – XMER01power/R4 Sept <strong>08</strong><br />

SECTION – III<br />

BIDDING SCHEDULE<br />

(To be filled in and signed by the Bidder)<br />

SCHEDULE ‘A’<br />

SCHEDULE OF GUARANTEED TECHNICAL PARTICULARS<br />

FOR POWER TRANSFORMERS<br />

1. Name of manufacturer :<br />

2. Normal full load single phase/three phase output :<br />

H.V. Winding (KVA) :<br />

L.V. Winding (KVA) :<br />

2.1 Temp. Rise as specified in the specificati<strong>on</strong>. :<br />

3. C<strong>on</strong>tinuous single phase/three phase output under :<br />

site c<strong>on</strong>diti<strong>on</strong>s as specified in the specificati<strong>on</strong><br />

H.V. Winding (KVA) :<br />

L.V. Winding (KVA) :<br />

4. Type of cooling and corresp<strong>on</strong>ding normal :<br />

full load output<br />

H.V. Winding (KVA) :<br />

L.V. Winding (KVA) :<br />

5. Over load capacity (as per IS:<str<strong>on</strong>g>66</str<strong>on</strong>g>00) :<br />

starting from full load and with Temp. as<br />

specified in the Specificati<strong>on</strong> ( KVA )<br />

6. Normal ratio of transformati<strong>on</strong> :<br />

7. C<strong>on</strong>necti<strong>on</strong> (including vector group ref. &:<br />

symbol)<br />

H. V. Winding :<br />

L.V. Winding :<br />

Sign and Seal of Bidder Page 45 of 87

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!