04.01.2014 Views

220-66-kv-xmer-on-line-nifes-r4-sept-08 - Gujarat Electricity Board

220-66-kv-xmer-on-line-nifes-r4-sept-08 - Gujarat Electricity Board

220-66-kv-xmer-on-line-nifes-r4-sept-08 - Gujarat Electricity Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GETCO/E/TS – XMER01power/R4 Sept <strong>08</strong><br />

Annexure - II<br />

Technical Specificati<strong>on</strong> For On Line Moisture and Gas In Oil Analyser For New<br />

Transformer With Model Analysis Software And Remote Data<br />

Transfer/Communicati<strong>on</strong>s through internet:<br />

1.0 GENERAL:<br />

The transformer shall be equipped with <strong>on</strong> <strong>line</strong> moisture and gas in oil analyzer system,<br />

‘HYDRAN – M2’ or equivalent with model analysis software and remote data transfer /<br />

communicati<strong>on</strong>s. It is intended to c<strong>on</strong>tinuously m<strong>on</strong>itor the evoluti<strong>on</strong> of dissolved gases<br />

from the oil of transformer with the help of a gas in oil sensor with no moving<br />

parts or pump to detect and c<strong>on</strong>tinuously m<strong>on</strong>itor a composite value of gases<br />

like H2 (Hydrogen), CO (Carb<strong>on</strong> m<strong>on</strong>oxide), C2H2 (Acetylene), C2H4 (Ethylene), etc.<br />

The system shall be installed <strong>on</strong> a single, open bore ball or gate valve. The<br />

system shall also c<strong>on</strong>tinuously m<strong>on</strong>itor the moisture c<strong>on</strong>tent in the transformer oil to<br />

result a comprehensive incipient fault m<strong>on</strong>itoring system.<br />

Based <strong>on</strong> the type and c<strong>on</strong>figurati<strong>on</strong> of the transformer and with 4, 4-20mA<br />

input channels and appropriate n<strong>on</strong> intrusive sensors, the system shall be<br />

capable of utilizing the measured parameters of temperature, cooling bank<br />

status and load currents to derive the following model calculati<strong>on</strong>s (based <strong>on</strong><br />

IEEE and/or IEC Standards). The original factory test report for the<br />

transformer will be made available to properly c<strong>on</strong>figure these model<br />

calculati<strong>on</strong>s.<br />

• Apparent Power<br />

• Load Current<br />

• PPM value of composite combustible gas measurement<br />

• Short term and l<strong>on</strong>g term rate of change of PPM value of composite<br />

combustible gas measurement<br />

• PPM water c<strong>on</strong>tent in oil<br />

• Water in oil c<strong>on</strong>densati<strong>on</strong> temperature<br />

• Winding hotspot temperature<br />

• Moisture c<strong>on</strong>tent in winding insulating paper<br />

• Moisture c<strong>on</strong>tent in barrier insulati<strong>on</strong><br />

• Relative ageing of the transformer insulati<strong>on</strong> system taking into account<br />

winding hotspot temperature and moisture c<strong>on</strong>tent in winding insulating<br />

paper.<br />

• Bubble incepti<strong>on</strong> temperature<br />

• Cooling system status<br />

• OLTC Tap positi<strong>on</strong> tracking (when equipped with OLTC)<br />

• OLTC temperature differential modeling (when equipped with external<br />

type OLTC)<br />

2.0 SCOPE of WORK:<br />

This is as a part of transformer supply, the transformer manufacturer shall also include<br />

in the scope of this tender, to supply, provisi<strong>on</strong>, mounting, erecti<strong>on</strong>, commissi<strong>on</strong>ing, etc;<br />

but not limited to the following, for <strong>on</strong> <strong>line</strong> moisture and gas in oil analyzer system.<br />

Sign and Seal of Bidder Page 72 of 87

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!