GETCO/E/TS – XMER01power/R4 Sept <strong>08</strong><br />
by oil drained out and acts as an insulating layer over oil in the tank and thus preventing<br />
aggravati<strong>on</strong> of fire.<br />
System comp<strong>on</strong>ents<br />
Nitrogen Injecti<strong>on</strong> system shall broadly c<strong>on</strong>sist of the following comp<strong>on</strong>ents. However,<br />
all other comp<strong>on</strong>ents which are necessary for fast reliable and effective working of the<br />
system shall deemed to be included in the scope of supply.<br />
CUBICLE (FEC)<br />
The Cubicle Frame shall be made of CRCA sheet of 3 mm (minimum) thick complete<br />
with the base frame, painted inside and outside with post office red colour (shade 538 of<br />
IS -5). It shall have hugged / hinged split doors fitted with high quality tamper proof<br />
lock. The doors, removable covers and panels shall be gasketted all round with neoprene<br />
gaskets. The degree of protecti<strong>on</strong> shall be IP55. The following items shall be provided<br />
in the Cubicle.<br />
• Nitrogen gas cylinder with regulator and falling pressure electrical c<strong>on</strong>tact<br />
manometer.<br />
• Oil drain pipe with mechanical quick drain valve.<br />
• Electro mechanical c<strong>on</strong>trol equipment for draining of oil of pre-determined<br />
volume and injecting regulated volume of nitrogen gas.<br />
• Pressure m<strong>on</strong>itoring switch for back-up protecti<strong>on</strong> for nitrogen release.<br />
• Limit switches for m<strong>on</strong>itoring of the system.<br />
• Butterfly valve with flanges <strong>on</strong> the top of panel for c<strong>on</strong>necting oil drain pipe and<br />
nitrogen injecti<strong>on</strong> pipes for transformer / reactors.<br />
• Panel lighting (CFL Type)<br />
• Oil drain pipe extensi<strong>on</strong> of suitable sizes for c<strong>on</strong>necting pipes to oil pit.<br />
• Space heater.<br />
C<strong>on</strong>trol box<br />
C<strong>on</strong>trol box is to be placed in the c<strong>on</strong>trol room for m<strong>on</strong>itoring system operati<strong>on</strong>,<br />
automatic c<strong>on</strong>trol and remote operati<strong>on</strong>. The following alarms, indicati<strong>on</strong>s, switches,<br />
push butt<strong>on</strong>s, audio signal etc. shall be provided.<br />
• System Oil.<br />
• TCIV open.<br />
• Oil drain valve closed.<br />
• Gas inlet valve closed<br />
• TCIV closed<br />
Sign and Seal of Bidder Page 79 of 87